Categorys
Pages
Linkpartner


    Page 173«..1020..172173174175..180190..»



    Are You Looking For Mold Remediation in Palm Harbor FL? – Video - March 20, 2014 by Mr HomeBuilder


    Are You Looking For Mold Remediation in Palm Harbor FL?
    Call us: (727) 547-3951 or visit http://www.floridadryout.com/city/palm-harbor-fl/ Disasters such as fire, water and flood can seriously damage our valuables...

    By: Braine Silvestre

    Read the rest here:
    Are You Looking For Mold Remediation in Palm Harbor FL? - Video

    Are You Looking For Mold Remediation in Port Saint Lucie FL? – Video - March 20, 2014 by Mr HomeBuilder


    Are You Looking For Mold Remediation in Port Saint Lucie FL?
    Call us: (772) 200-3835 or visit http://www.floridadryout.com/city/port-saint-lucie-fl/ Serious damages could happen to our homes and businesses because of t...

    By: Braine Silvestre

    Follow this link:
    Are You Looking For Mold Remediation in Port Saint Lucie FL? - Video

    MSP tours to resume April 21 - March 20, 2014 by Mr HomeBuilder

    This file photo from March 21, 2012, shows repairs being made on the front of Housing Unit 1 at the Missouri State Penitentiary along Layfette Street in Jefferson City. State officials closed off the vacant prison last month and canceled public tours for the rest of 2013 due to mold problems in the historic site's deteriorating buildings. Photo by News Tribune.

    Though work is ongoing, tours of the old Missouri State Penitentiary will resume April 21.

    The Jefferson City Convention and Visitors Bureau, or CVB, announced Thursday morning that modified tours are expected to begin April 21. The modified history tours will allow access to Housing Units 1 and 4, and the gas chamber, while the state continues mold remediation and repair work. The release states all remediation is expected to be complete by late June and full tours would begin July 1.

    Ongoing construction and repair work will not interfere with public tours, the release states.

    At the end of September, the CVB temporarily suspended all tours of the historic prison site, only to later announce the cancellation of all 2013 tours because of mold found at the site.

    Late last year, the city agreed to split with the state the estimated $2 million cost of repairs and mold remediation at MSP , in exchange for a long-term contract with the CVB for use of the facility. The $2 million has provided for cleanup of hazardous material, window repairs and window closures in Housing Units 1, 3, 4 and the gas chamber, and roof replacements in each unit.

    The Missouri State Penitentiary holds 178 years of history within its walls, said Office of Administration Commissioner Doug Nelson. By preserving this iconic structure, the State of Missouri and City of Jefferson have ensured that generations of visitors can continue to safely experience this historic Missouri landmark for many years to come.

    Use the comment form below to begin a discussion about this content.

    View original post here:
    MSP tours to resume April 21

    Porches cover (franklin the flirt) – Video - March 20, 2014 by Mr HomeBuilder


    Porches cover (franklin the flirt)
    Cover.

    By: jack simone

    See the article here:
    Porches cover (franklin the flirt) - Video

    Porches. – Leather – Video - March 20, 2014 by Mr HomeBuilder


    Porches. - Leather
    "Leather" by Porches. from his split with Mdou Moctar put out by Seagreen Records 4/15/14. http://www.porchesmusic.bandcamp.com http://www.seagreenforever.com.

    By: Seagreen Records

    Read more here:
    Porches. - Leather - Video

    Bathroom Remodeling with Re-Bath San Diego – Video - March 20, 2014 by Mr HomeBuilder


    Bathroom Remodeling with Re-Bath San Diego
    Re-Bath owners Marc and Evan Glazer discuss how to remodel your bath in a cost-effective way with little disruption to your life.

    By: THE HOME PRO SHOW

    Read the original:
    Bathroom Remodeling with Re-Bath San Diego - Video

    How to Build a Concealed Access Panel – Video - March 20, 2014 by Mr HomeBuilder


    How to Build a Concealed Access Panel
    How to create an access panel in a finished bathroom. Remodeling in Madison, WI. Degnan Design Builders, Inc. http://www.degnandesignbuilders.com https://www.facebo...

    By: Degnan Design Builders

    Continued here:
    How to Build a Concealed Access Panel - Video

    Fountain Hills Bathroom Remodeling 480.351.2171 Call Today! – Video - March 20, 2014 by Mr HomeBuilder


    Fountain Hills Bathroom Remodeling 480.351.2171 Call Today!
    Fountain Hills Bathroom Remodeling 480.351.2171 Call Today! If you would like the very best services AND quality plumbing related work, call 480-351-2171 for...

    By: Donald Rodriguez

    More here:
    Fountain Hills Bathroom Remodeling 480.351.2171 Call Today! - Video

    Home Pro Show and Re-Bath San Diego Bathroom Remodeling – Video - March 20, 2014 by Mr HomeBuilder


    Home Pro Show and Re-Bath San Diego Bathroom Remodeling
    The Home Pro Show talks with Evan Glazer from RE-BATH of Southern California. Evan talks about how RE-BATH can be so cost-effective, so quick and still maint...

    By: THE HOME PRO SHOW

    Read the original:
    Home Pro Show and Re-Bath San Diego Bathroom Remodeling - Video

    Cost of a Bathroom Remodeling – Estimates and Prices Paid - March 20, 2014 by Mr HomeBuilder

    Typical costs: Remodeling costs vary widely depending on the shape and square footage of the existing room, whether walls or plumbing are moved, and the quality of materials used. According to an annual construction cost survey by Remodeling Magazine, a mid-range remodel of a 5x7-foot bathroom averages $14,109-$18,864; for an upscale expansion of a 5x7 bathroom to 9x9-feet within the existing house footprint, costs run $46,865-$59,456. These are averages; actual costs may be higher or lower. Related articles: Vinyl Flooring, Tile Flooring, Kitchen Cabinets, Kitchen Remodeling, Architect What should be included: A detailed overview of remodeling in general and bathrooms in particular is provided the National Association of the Remodeling Industry[1] . Bathrooms: Plan, Remodel, Build[2] by Jerry Germer is one of several books available to guide you through the many phases of bathroom renovations. ImproveNet.com[3] presents practical articles on cabinets, sinks, showers, tubs and the like, while A Bathroom Guide.com[4] presents the perfect "spa" bathroom. Discounts: ThisOldHouse.com[5] gives details of bathroom remodels for $1,830-$2,425, with the homeowners doing some but not all of the work. Shopping for a bathroom remodeling: Gather photos of bathroom styles and details that appeal to you. The National Association for the Remodeling Industry[6] offers a free downloadable brochure on "How To Select A Remodeling Professional," from checking references to what should be in the written contract. The National Association of the Remodeling Industry[7] also gives contractor referrals. CostHelper News What People Are Paying - Recent Comments Posted by: Matt Phillips Annointedservices.com in matteson, IL. Posted: March 24th, 2013 06:03PM Square Ft of Bathroom: 35 sqft Items Remodeled: custom floor shower

    Im currently remodeling my lower level bathroom. The same work for a client i would charge about 7500 for a custom bathroom remodel! Here's the math to demo and rebuild my bath room! Avg price for tile,toilet,custom shower base, vanity and plumbing fixtures with lighting about 2500 for materials multiply that by 2 for your labor cost! Remember this! You get what you pay for

    We redid our bathroom with new tile on floors and walls as well as a new double vanity and paint.we hired Jdh home improvement they did an amazing job.in addition they were very professional and polite.We will be using them again.Jeremy 401-688-3639 there website is http://www.jdhhomeimprovement.com

    Had a small leak that ruined the vinyl floor in our guest bathroom - and after 10 years it needed a little sprucing up. So we retile the bathtub surround, tiled the floor, swapped the position of the toilet and vanity and replaced the shower controllers. I did all the work myself..took 7 hard days of work. The tile - at the time- seemed to be going fast but the hours fly buy so i spent 4 days just on the tile. We also picked what we wanted and didnt worry about price too much. The tile was $6 or so a square foot OUCH. the vanity top which was cambria was $600 OUCH OUCH. Got a great deal on the vanity from woodmark. Shower controller and faucet from delta were another $1000. Ouch ouch ouch. It does look great. The price was a little above the budget we got from http://www.remodelormove.com cost calculators but hope this bathroom lasts 20 years..that is only $175 or so a year..not too bad 🙂

    Gutted 1956 Bathroom and did considerable structural repair from water damage. Rearranged room for more efficient layout. $3400 in materials and $4300 in labor. Rewired, redid hvac, new plumbing (old cast iron removed), travertine on floor, mid-grade faucets (moen), dual floating vanity, new glass door into bathroom, new window, tile around soaking tub/shower and travertine floor. We also spent extra on epoxy grout...your spouse will love you forever knowing they never need to clean grout ever again. It's pricey, but definitely consider it. Best money I've every spent...project took 10 days exactly and ZERO stress.

    A half bath remodel including all materials ($750+) and labor ($500+) but wall paint (done by myself). New toilet, 26"W dark wood cabinet, sink, faucet, wood-framed mirror, ceramic tiles (floor and baseboard), threshold, lighting, switches, towel hanger, toilet paper holder installed. I did not compromise with cheap materials, and still the total cost was much cheaper than I expected. Since half baths are often on the 1st floor and guests frequently use it, it is a good investment!

    gutted, and installed granite on floors, 5 feet up walls, in shower and tub. platinum fixtures, hand thrown, fully functional toilet and double sink.

    We spent $3,385.00 on labor for total gut and some drywall, this also includes tile work, plumbing and electrical work. We spent $3,055.14 total on materials which include a deep soaking bathtub, with wall surround, new Kohler toilet, beautiful tile for the floor and tall vanity which we got at Lowes. We splurged on Pottery Barn Mirror and certain fixtures, curved shower curtain which we love. Some replumbing had to happen, also some electrical work had to be done. We are happy with the results.

    I took thiis job on myself. Framed out a section of room, corner shower, tile surround and floor, electrical, window install, exhaust fan/heat unit install, sheetrock and paint, copper plumbing (quick connects and solder), install all hardware- 150-160 hrs not inluding shopping trips.

    I have a very very very small bathroom, 5x6 wall to wall, with a shorty tub and shower. I went out and got quote after quote after quote. all in different ball parks, one guy said $9,000, another $7,000, one $5900. the prices were all over the place and for such a small bathroom and for economy tile and fixtures was way to high for my budget. I ended up having a friend do it on the weekends for $2000 and i bought all the material. In the end it cost me $4,300 but with all high end fixtures, tile, and sink. It pays to get more than 3 estimates!

    Link:
    Cost of a Bathroom Remodeling - Estimates and Prices Paid

    « old entrysnew entrys »



    Page 173«..1020..172173174175..180190..»


    Recent Posts