Home » Archives for November 2019 » Page 23
Page 23«..1020..22232425..3040..»
Buy Photo
John Mueller is all smiles as he carries a stack of couch cushions to his newly rebuilt home on Tiburon Court in Port Orchard on Saturday. The Muellers' home was destroyed during the Dec. 18, 2018, tornado, which ripped the entire roof off of the home.(Photo: MEEGAN M. REID / KITSAP SUN)
PORT ORCHARD Beth Mueller learned that the roof had been blown off her home when a neighbor texted her a pictureon the TV news.
"It was just insane," she said. "To see it completely mangled, it was just heartbreaking."
The image of "the red house with no roof" went viral, becoming an icon for the freak tornado that struck Port Orchard on Dec. 18, 2018. The tornado plowed a 1.4-mile path of wreckage and causeda total of$1.81 million in damage to homes and businesses. No people were seriously injured or killed.
The tornado's power, EF-2on a scale of zeroto 5, was such that corners of the Mueller's home were torqued. Remains of the roof were never found.
Exactly 11months to the day, on Nov. 18, the Muellers passed inspection on their rebuilt home. They moved in Saturday.
"It's not moving day. It's coming home day," Beth's husband, John Mueller, said.
And, yes, the new house is painted red.
Beth Mueller and her ex-husband bought the house on Tiburon Court in 2003. "It's literally the only home my kids have known," she said.
John and Beth married in 2015, blending a family of his two girls Hannah andJasmin and her two kids Amber and Nick. Jasmin Mueller, now 17, and Nick Watson, now 18, were the only two still living at home last fall, both attending South Kitsap High School.
The tornado hit just as school was letting out, so Beth, at work in Puget Sound Naval Shipyard, knew they hadn't been at the house during the storm. She and John, also a PSNS employee, took a back routehome to avoid "insane" traffic on the main roads.
Hannah Mueller carries Christmas presents to the driveway of her parent's home as she helps salvage what they can from their now roofless structure on Tiburon Court in Port Orchard on Dec. 19, 2018.(Photo: MEEGAN M. REID)
Their first thought was for the pets.
The neighborhood was blocked off, but firefighters allowed them to walk in. John, with help from two firefighters, located the Muellers' two dogs, Cinder, a chocolate lab, and Merida, a corgi mix, safe in their kennels in the downstairs den.
Hannah's dog Lyla also was at the house that day and had found refuge under a fallen china hutch. Nick's elderly cat Summer was hiding unscathed under Nick's bed. Even Jasmin's rabbit Gandalf the Grey made it throughalthoughcovered in shreds of insulation.
John Mueller and the firefighters evacuated the menagerie to where Beth waitedanxiously. "So I have the rabbit in my jacket, the cat in a carrier and a dog in one hand," John said. "All our animals survived, which was beautiful."
John believes his Army infantry training kicked in that day. "In the infantry, you are mission-centered," he said. "You take all the emotions out and you do what needs to be done."
A large red family house known locally as the 'red home' lost its roof when a tornado hit Port Orchard. Joe Jacquez, wochit
The next day, they had just a short window of time to salvage what they could from the house before it was red-tagged. Among the things they saved: Beth'spiano, Jasmin's vanity andthe rocking chair from when John's girls were babies.
The Muellers have nothing but praise for their insurance company (Allstate), which sent a "catastrophe team" to assess their loss and quickly cut a check for reconstruction. Some of their neighbors have struggled with getting settlements and at least one has yet to move back in, according to the Muellers.
Their coverage for a temporary rentalwas for one year, so the rebuild needed to move quickly.
The first roadblock: their foundation was cracked. The whole house would have to go.
Demolition was Jan. 29. John Mueller still has the video on his phone ofwhen the two-story machinebegan clawing at the house, crunching an upstairs window.
"Absolutely surreal," he said "This was kind of a hard day ... when we had to say goodbye to the old red house."
The Muellers were their own contractors and have learned a ton about permitting and local building codes. They went with Coval, a local construction company. The split level is gone, the layout is flipped, the garage now on the left. But they've replaced their four-bedroom andincreased their square footage from 1,822 to 1,910.
John Mueller documented their construction progress on Facebook. They hit another snag in September, when there was a delay in the electrical hook-up on which other steps of the rebuild depended. Coval found a workaround, and interior work continued. John applied pressure to Puget Sound Energy, and the hookup took place near the end of September.
Exterior painting was done by early October. The interior was painted and appliances installed in mid-October.
There was a recent scramble to spread topsoil and hydroseed before the inspection, but they pulled it off.
Beth Mueller unloads a bed frame from the U-Haul as she and her family move into their newly rebuilt home on Tiburon Court in Port Orchard on Saturday.(Photo: MEEGAN M. REID / KITSAP SUN)
Beth says the rebuild was "super-stressful." She jokes since their marriage has survived this, it can survive anything. She can't wait to cook Thanksgiving dinner for the whole family back in her own home.
John, walking with his wife throughempty rooms two days before move-in,displayed his ever-ready optimism.
"This has been a long road, but it's been a good road, hasn't it?" he said. "What's the biggest thing? Always keep a smile.You know what? This house, it was just stuff. Everybody was OK. I knew we'd be OK. With faith, all things are possible."
Beth got a tattoo on her right leg. It shows a tornado, ruby slippers and a rainbow.
"God's promise, right?" she said.
John commissioned from a woodworker in Bonney Lake a plaque that hangs outside their front door. It shows the old house in the background being carried away by the tornado. In the foreground is the new house, study and bright, with a yellow brick road out front.
"Let me just say,home ... there's no place like home," Johnsaid. " We have our old house that's going away. It's in the past. This is new. This is us. Everything ...everything leads home."
John Mueller shows off the artwork that features the old house in the background being carried away by the tornado. In the foreground is the new house, study and bright, with a yellow brick road out front. The woodworking piece hangs next to the family's front door of their new home on Tiburon Court in Port Orchard.(Photo: MEEGAN M. REID / KITSAP SUN)
Read or Share this story: https://www.kitsapsun.com/story/news/local/2019/11/25/port-orchard-tornado-blasted-red-house-family-everything-leads-home/4272526002/
Read the original post:
For tornado-blasted red house family, 'everything leads home' - Kitsap Sun
Category
Painting Contractors | Comments Off on For tornado-blasted red house family, ‘everything leads home’ – Kitsap Sun
Watercolor illustration by Peili Wang of Chelsea development 246 West 16th Street, where broker Doug Bowen is an advocate for the use of art in real estate marketing
With the residential sales market in New York struggling from declining overseas interest and a multitude of political factors, owners and their brokers marketing higher-end properties have had to get creative about standing out from the rest of the gleaming and amenity-laden pack.
And some are choosing old-fashioned illustration as a marketing tool.
Traditionally, the promotional images shown to potential buyers, especially when a property is still in development, are polished looking renderings. For existing properties, there are slick brochures packed with photos of the interiors and outdoor space. And while this is still very much the norm, a handful of owners and their agents have begun utilizing more traditional art and illustration to attract a buyers eye.
Recently, developer Lightstone commissioned an illustrator called Kneeslappa to create a a drawing of Lightstones 130 William in the Financial District. The drawing process was made into a video that was posted on social media to celebrate the buildings 10,000th Instagram follower. Illustrator Josiah Hanchett was also recently tapped for a similar project to sketch the views from L&M Development Partners and the family behind J&R Musics 25 Park Row in Lower Manhattan as theyd appear from a penthouse once its completed. Additionally, a four-unit luxury building owned by Grid Group, 246 West 16th Street in Chelsea, will soon launch sales using watercolor illustrations of the propertys faade and interiors by artist and interior design professor Peili Wang.
That said, no one should mistake the interest of the aforementioned developers as a trend.
Wang, who has illustrated professionally for 20 years and taught design and illustration for nearly that long, has always seen a steady amount of interest from real estate professionals. But never a sudden spike that might indicate a fad, even as commercial illustration has made a comeback in recent years. He believes its just a matter of preference, and during this time, Wang been called on to create plenty of computer-generated renderings as well as what he refers to as freehand versions with watercolor. He recently did one for the Library of Congress in promotion of a massive renovation project announced last spring.
What Wang has seen however is that watercolors are requested far more for residential properties than for commercial ones.
Residential projects are special; theyre interested in traditional, he said.
As for Wangs work for the new Chelsea development, one of the brokers representing the property, Doug Bowen of Douglas Elliman, concurred that illustration isnt particularly on the rise but Bowen is already a believer in it, having always incorporated art in some form when promoting his listings.
For over a decade, hes organized or helped put together art exhibitions at homes and spaces hes shown and has found doing so to be consistently effective. He and his team have also had art made by artists who are local to properties theyre marketing blown up and displayed on wheatpaste on construction walls. Additionally, as an art lover and avid collector himself, Bowen finds it important to make sure homes hes selling come properly move-in ready with lighting that would highlight art on the walls.
I believe art is extremely important in real estate, said Bowen. Were selling a lifestyle when were selling a property like 246.
Although its impossible to pinpoint exactly how many sales, potentially interested buyers or listing clicks have been triggered by a particular marketing campaign, Bowen said he wouldnt be surprised if traditional illustration takes off in the industry based on the positive feedback hes gotten from it so far.
I think people are appreciative of thoughtful approaches to marketing, he said. I still do traditional mailers, but how do you make the mailer different from the next mailer and not get thrown into the pile that gets thrown into the garbage?
This is of course the big question P.R. professionals ask themselves every day. Alex Corda, the managing director of the P.R. firm whos involved in the marketing of 246 and the other aforementioned developments, Optimist Consulting, said ultimately it boils down to staying away from the hard sell.
While social media engagement is hugely important for properties and agents, Corda cautions the real estate professionals he represents to avoid trying to sell directly on their properties accounts and stick to making updates that will make buyers and agents want to revisit the accounts. For celebratory moments, like hitting sales goals, illustration and in particular their progress videos, have been a kind of content hes encouraged. And these days, its easy to find artists and other content creators who have an interest in real estate and architecture because they post about it. Once theyre found, Corda said hell ask them to create something that would tell our story in a different manner.
We need to continuously find ways to spark conversation, he added. I dont send people to (a propertys) website because its updated once or twice in its development, but I send them to Instagram because its fun and it has neighborhood tips and its a playful way to talk about a building as its being built.
In the case of 130 William, which was illustrated as it appeared nestled in the skyline, the goal was to depict a property that the owners envision as becoming a landmark. In the case of 25 Park, it was to give a sense of the future experience of the unfinished apartment through its views.
Not surprisingly, Corda said, the illustration posts are a lot more work than a typical social media update. The 130 William video was done after scouting many spots before finding the best perspective with which to capture the building. So he suspects even if building illustration gets more popular, itll mainly be to highlight milestone moments.
Meanwhile, some New York City properties currently under development have also been getting a boost in branding from a local artist whose work has made her a darling of the construction industry.
For years now, Gwyneth Leechs colorful paintings in acrylic and oils have depicted major Manhattan properties as theyre being built from the ground up, from the Hudson Yards shed to One Vanderbilt to the MoMA Expansion Tower.
Ironically, Leech created her first building painting as a form of personal protest when a skyscraper began to rise up across the street from her Garment District studio, obstructing her light and views. Dubbing it The Monolith, her painting process ended up being immortalized in an award-winning documentary of the same name. It was then that Leech found that she enjoyed painting real estate or more specifically the process of it being created. She soon found herself in the street with an easel, using brushstrokes to chronicle the construction process at different sites. She especially liked capturing buildings in their skeletal steel beam phase.
When showing some of these works at an exhibition, a friend mentioned he knew someone whod appreciate the subject matter and that person turned out to be the president of a construction company who collected art. He later invited Leech to hold an exhibition in his office, and through that connection, Leech also met an art buyer for Brookfield. Over time she was approached by other real estate professionals, in particular those involved in construction and steel contractors, who were looking to memorialize their own work.
It was a very organic kind of thing, word of mouth and posting my art on Instagram, said Leech.
In recent weeks, her painted properties were also on view on the streets of New York City as they glowed from the sides of LinkNYC kiosks. This was after having pieces she submitted get accepted for a public art program run by the public Wi-Fi service. She also had a recent exhibition, done in collaboration with Clinton Housing Development Company, a nonprofit aimed at creating more affordable housing in the Hells Kitchen area.
While most of her works are buildings she chooses to paint, she does take commissions and if an owner or broker wanted her to create a specific property, Leech said shed consider it.
However, she noted, It would depend on the project and whether its in my area of interest.
She recently turned down an offer to paint a hotel after learning construction had already finished. I said no, I cant really help you. My work is definitely about the process.
(Visited 1 times, 82 visits today)
View post:
You should be in pictures: Developers turning to illustrators to showcase properties - Real Estate Weekly
Category
Painting Contractors | Comments Off on You should be in pictures: Developers turning to illustrators to showcase properties – Real Estate Weekly
The construction of the Out Patient Department (OPD) ward at Eria Health Centre IV in Moyo Sub-county, Moyo District, in Uganda has stalled for seven months over lack of funds. Construction commenced in November 2018.
The project that was awarded to Iron Investment and Construction Ltd, a construction firm based in Arua District, was supposed to end in March this year. District officials have revealed that they have so far released US $3.4m out of the US $4m needed for the completion of the project.
Mr Alex Chelimo, the Moyo District chief administrative officer, stated that it is true the work has stalled for over seven months and they have written warning letters to the contractor twice but he did not respond. We may be forced to seek the advice of the Solicitor General, he said.
What is now remaining is grinding the stones, putting bulbs, painting and working on some of the cracks in some of the rooms, he added.
Also Read:Rwanda to upgrade Nyamata hospital in Bugesera
Mr Daniel Buni, the Moyo Sub-county chairperson, advised the district leaders to take serious action against errant contractors. The way some of the contractors are doing their work is sometimes uncalled for and something has to be done so that we have the value for money, Mr Buni said.
Mr Williams Anyama, the Moyo District chairperson, said the contractor has deprived the locals of service delivery. How can government entertain this kind of people? The contractor cannot do this at the expense of ordinary people. We care about the people and the project must be completed, he said.
Read the original:
Construction of US $4m health centre ward in Uganda stalls - Construction Review
Category
Painting Contractors | Comments Off on Construction of US $4m health centre ward in Uganda stalls – Construction Review
The gateway to Opotiki has been restored to its former glory, with the cleaning and painting of Waioeka Bridge now complete.
Waka Kotahi NZ Transport Agency is pleased to announce the scaffolding surrounding the iconic 92-year-old bridge has come down, and the refurbishment is finished.
Bay of Plenty Transport Systems Manager, Rob Campbell, says it is fantastic to see the Waioeka Bridge cleaned, painted and looking great in time for summer.
We know that this was a significant and long-awaited project for the community, and we are thrilled to have been able to deliver this for them.
The bridge is looking almost brand new and will make a real difference to Opotikis gateway.
We hope the community and those visiting the area will really enjoy the finished product.
Cleaning, treating and painting the large and challenging structure presented a complicated task for the Transport Agency and its contractors.
A lot of time was spent finding a method that would allow the bridge to be cleaned to a high standard, while ensuring the preservation of the surrounding environment.
Rob says despite these challenges, the project has been a huge success.
Higgins Project Manager Roger Greaves says protecting the waterway beneath the bridge was a top priority.
We made sure there was a thorough environmental management plan in place to ensure no contaminants entered the Waioeka river or the stormwater system which feeds into it.
Rogersays contractors were also able to identify and complete several concrete repairs on both sides of the bridge during the process.
With the cleaning now finished, the Transport Agency is investigating methods to refurbish the historical plaque on the inside of the bridge.
Plan ahead for a safe, enjoyable journey this summer. Keep up to date with:
Phone: 0800 4 HIGHWAYS (0800 44 44 49)
Visit link:
Fresh face for gateway to Opotiki - The Bay's News First - SunLive
Category
Painting Contractors | Comments Off on Fresh face for gateway to Opotiki – The Bay’s News First – SunLive
Tertiary Education Trust Fund (TETFund) is the backbone of infrastructural development, training and equipment procurement in public tertiary institutions. However, JUSTINA ASISHANA reports that contractors failings, poor project implementation and opaqueness of project procedures are undermining the impact of the fund.
IN 2010, the Federal University of Technology (FUT) Minna had only one capital project construction of Cyber Security Science Department funded by the Federal Ministry of Education. Nine years later, the project has not been completed because of inadequate funding. However, between 2010 and 2018, over 10 projects, embarked upon and funded by the Tertiary Education Trust Fund (TETFund) in the university, have been completed.
Juxtaposing these situations, it is not surprising that most tertiary institutions execute projects through TETFund. They have come to rely heavily on this fund for the structural, physical and academic development of their institutions.
The 2011 TETFund Act established the intervention agency, with specific responsibility for managing, disbursing and monitoring the proceeds of the two percent education tax onassessable profits of registered companies. It is for public tertiary institutions.
Section 7(i) to (e) of the TETFund Act 2011 provides, among others, for the provision and maintenance of essential physical infrastructure for teaching and learning, instructional materials and equipment, research and publications, academic staff training and development and any other need, which in the opinion of the Board of Trustees is critical and essential for the improvement of quality and maintenance of standards in higher educational institutions.
The Director, Central Research Laboratories of the University of Ilorin (UNILORIN), Prof. Musa Toyin Yakubu, said: If there was no TETfund, our universities will not survive. In this university, we live and breathe TETfund. Our buildings, most researches and staff development are always done under the auspices of TETfund. I think they should just name all universities, Universities of TETfund.
This observation may not be far-fetched, especially as an investigation conducted on some federal tertiary institutions in the North-Central confirmed that TETFund has been crucial to capital development in universities, polytechnics and colleges of education.
However, even with the impact TETFund is making, it is not all smooth sailing. On the surface, it seems institutions have done well with the intervention funds. However, some of the funds are not being accessed because of sharp practices by contractors who may be conniving with the departments saddled with the responsibility of assigning projects to contractors.
Investigation showed that most of the funds allocated to universities were not being accessed as allocated yearly, because of the inability of contractors to meet the deadlines given to them. As a result, approved funds are not usually accessed until years later.
How contractors delay work
The contract awarding process involves biddings, and institutions usually give preference to the lowest responsible bid. However,The Nationlearnt that some of the contractors do not provide accurate information about their capabilities.
Such was the case of the contractor who was first awarded the contract for the construction of the School of Engineering and Engineering Technology Phase II at FUTMinna.
It was gathered that the contractor was given the contract on July 7, 2015 same day the construction of the School of Agriculture and Agricultural Technology Phase II was given to another contractor. The contracts were supposed to be completed on July 19, 2016.
An investigation byThe Nationrevealed that while the contractor in charge of the School of Agricultural Technology delivered on time, the contractor handling the School of Engineering dilly-dallied until the contract was revoked.
When questioned over the delay in the project, FUT Minna Vice-Chancellor Prof. Abdullahi Bala said the contractor diverted the funds to another project. He added that during recession, in early 2016, prices rose and the contractor could not meet up.
He said: The contractor handling the School of Engineering project, instead of putting efforts in making sure that he goes by the terms of the agreement, he mobilised his resources elsewhere to some other projects, so the project in FUT Minna suffered. When the recession came in late 2015 and 2016, the prices doubled, and he came back asking for variations. He told us that he was being affected by the depreciation of the naira.
However, if he had done his work within the specified period, the depreciation of naira would not have affected him. Therefore, a project that would have been completed in 2015, we are still struggling with it, and this is 2019. It is just about now that we had to get another contractor to come in for us to complete it.
In a document obtained by the reporter, the contractor of the contract was stated as Messrs Gridtech Construction. The total sum of the contract is N176,165,959.
A similar issue of incompetence or clear fraud may have been suspected in a contractors handling of the construction and furnishing of a lecture theatre for the Institute of Education Phase II, at the permanent site of the University of Abuja (UNIABUJA).
The contract, awarded to CF Cofel International Ltd Suleja, Niger State, was terminated while it was only 10 per cent complete. The contract sum was N410,877,888 and the contract was awarded in September 2015 and expected to be completed in February 2016.
Documents obtained revealed that N230,091,617 was released. However, the reporter could not get any information on whether this amount was given to the contractor. No member of the university management was willing to cite the reason the contract was terminated. It is also not clear if the contract has been re-awarded to another contractor.
This reporter could not reach the contractor to get his side of the story.
When contractors delay execution of projects, institutions experience delays in accessing TETFund grants.The Nationdiscovered that just as contractors do not provide adequate information about their capacity to do a job, they do not disclose their ability to assess funds to implement the project or provide the necessary equipment.
Therefore, while the monies wait for disbursement, there are delays in the project as most institutions like the FUT Minna and UNILORIN claimed they would not release any fund unless the project followed due process.
FUT Minna VC said: The delay in projects is not because of non-payment because the monies are already there waiting as TETFund releases money to the institution who will in turn release to the contractors according to the work done. So you see, some contractors, they will delay and delay because of inadequate capacity.
TETFund projects (2015-2019)
Between 2015 and 2019, at UNIABUJA, of 11 projects awarded under TETFund, only one, the construction and furnishing of library/resource centre building for the Institute of Education Phase I, at the permanent site, has been completed.
Other projects such as the supply and installation of two generators, construction of power equipment house and entrance gate for the Institute of Education Phase I, construction and furnishing of an administrative building for Phase I and II, construction of entrepreneurship centre some of which were awarded in 2015 are still ongoing and are at different stages (40-80 percent) of completion.
At the FUT Minna, within the period under review, 25 projects were awarded of which 16 have been completed while nine are still at various stages of completion. The FederalUniversity, Lafia, has had 26 projects with 17 completed and at in various stages of completion.
At the Federal University, Lokoja, majority of the 28 projects initiated had been completed when our reporter visited in August.
One of the students said the multipurpose complex was inaugurated earlier in the year while the other projects were being used. Going round the institution, to the block of laboratories and classrooms complex, it was observed that the laboratories were equipped and had some students were carrying out practical sessions.
At the University of Jos (UNIJOS), out of 10 TETFund projects (2015-2018), seven have been completed and handed over to the institution. The projects remaining include the construction of the Faculty of Management Sciences, Faculty of Engineering, and the rehabilitation of the burnt Library all at the Naraguta campus, Jos.
At UNILORIN, none of the building projects under 2013 to 2016 merged TETFund annual interventions have been fully completed.
The construction of the extension of the main library has already been roofed and awaiting finishing touches and fixing of the windows, doors, and others; construction of the administrative block for Environmental Sciences, Department of Quantity Survey, Estate Management, Surveying, and Geo-informatics are still underway.
Workers were seen on site in the proposed departments of Estate Management, Surveying, and Geo-informatics. However, they were jittery upon sighting this reporter and disallowed her from taking pictures. They also refused to answer questions on the project and threatened to beat her up.
Shoddy Work or Poor Maintenance?
In some of the institutions visited, it was discovered that the walls of recently completed projects were already cracking and the paint peeling off while some of the infrastructures, especially the chairs brought with TETFund grants for the lecture rooms had already broken down.
At the Federal University, Lafia, the collapsible chairs in the Department of Computer Sciences, tagged TETFund 2013, had broken down in some of the lecture rooms.
At UNIJOS, some of the projects like the proposed Faculty of Management Sciences, and the proposed centre for film and communication arts, as well as the faculty of engineering, despite having been completed still needed painting or furniture.
At the Federal University, Lokoja, a visitor is greeted with rows of blocks of classrooms and laboratories that already have their paints peeling and walls cracking. Although the new structures constructed from 2018 are still standing, other structures with inscriptions of 2011-2013 already show signs of wear and tear.
At UNILORIN, it was also observed that TETfund projects, which are not up to 10 years, had cracks appearing on most of the buildings. Part of the block in the Faculty of Life Sciences showed serious signs of decay while the Center for Laboratory Research had cracks and peelings.
However, this reporter was unable to ascertain if the decay was a result of poor maintenance or shoddy work by the contractors.
Some of the workers said that not all the projects were given to experts. One, who preferred not to be named, said increased supervision of project implementation was necessary.
One question the school needs to ask itself is if these buildings constructed stand the test of time and do the contractors do what they are meant to do?
On my part, I think they need more supervision both from TETFund and the institution. If this is done, I am sure the contractors would do the right thing and not cut corners unnecessarily.
Pointing to one of the TETFund buildings already peeling, he said, Look at that building, the plaster is already peeling off. This project was done under 2009 intervention which means the project was completed sometime in 2010 or 2011. The right contractors should be given the job, those who know the job, give it to someone who knows his onions and they will do the job better.
If you go round the university, you will see buildings with cracks all over, these are buildings that are not more than 10 years. I built my own house earlier than that and there havent been any cracks.
A CAC search revealed that some of the contracts were not given to experts. An example is Elnita Nigeria Limited whose objectives, according to a CAC search, include to carry on the business of hotel, restaurant, tavern, beerhouse, and lodging, housekeepers, licensed wine, beer, and spirit merchant and to run amusement and gambling, casino and to do all things incidental thereof and holiday camps and to organise, promote and carry on all amusement businesses.
However, Elnita Nigeria Limited won the contract for the electrical installation of the School of Agriculture and Agricultural Technology Phase 2 at the FUT Minna. Though the project has been completed and students are using the facilities, time will tell if the work will stand the test of time.
Help in time of need
In October 2016, the three-storey building housing the UNIJOS Library, the faculty of social sciences and management sciences was gutted by fire.
In a bid to provide relief to the institution, TETFund intervened and the award for the rehabilitation of the central library was given to Amber Blaze Limited in March 2018. The library building at the time when the reporter visited the institution in July was about 85 percent complete.
While the previous library complex housed some faculties, the new library complex is being entirely used for library activities.
A source told this reporter that in addition, some equipment was bought for the library but not currently in use.
It is looking nice now. Everything brought in the library is brand new. There are also ICT machines in here and servers. We were told that this whole building will be used for the library now. We do not know what will be put downstairs but upstairs, which is currently locked, have all the furniture and other infrastructures, a student told the reporter.
The rehabilitation of the burnt library is to gulp the sum of N701,203,727 but, according to one of the Staff, only N485,011,887 has been received while the balance is being awaited to complete the rehabilitation.
Secrecy over disclosure of process
The procurement process for the TETFund projects are usually handled by the Department of Physical Planning or the TETfund Desk officers in the institutions, however, the officials in charge of these departments do not easily give information about projects.
At the Federal University Lokoja in Kogi State as the Vice-Chancellor, Prof. Angela Freeman Miri was not around and did not respond to calls and messages to her phone. The meeting with the Registrar, Mr. Usman Suleman Obansa did not yield any result as he said, it is only the VC that can give you such information or give theTETfund desk officer the go-ahead to give you information. You know it is the office of the Vice-Chancellor that handles the TETfund issue.
When approached, the TETFund Desk Office said he could not share information without the VCs permission.
Officers at the Federal University, Lafia diplomatically avoided setting up a meeting despite assurances following the submission of an FOI request.
The Vice-Chancellor was said to have traveled on an impromptu trip. All promises that all information will be mailed to this reporter were not fulfilled.
At UNILORIN, efforts to get information on the procedural process in the award of the projects led nowhere as the office of the Vice-Chancellor, when contacted, directed the Reporter to two Professors, Adeola Abdullah Adedeji of the Department of Civil Engineer and the representative of the Faculty of Engineering and Technology in the institutions TETFund Committee and Musa Toyin Yakubu, the Director of the Central Research Laboratories.
However, the two Professors could not provide the details and directed the Reporter to the Department of Physical Planning. There, the Director of Physical Planning, Dr. Adams Bashir Olajide said he would not attend to the Reporter unless with express permission from the Vice-Chancellor, Prof. Sulyman Age Abdulkareem. All efforts to get the Vice-Chancellor to speak on the projects proved abortive as his Secretary said he was out of the office.
It was the same scenario at UNIJOS. The institutions Public Relations Officer, Abdullahi Abdullahi who readily gave out information about TETFund projects, could however not give details of how the projects were awarded. This Reporter could not meet with the VC, Prof. Seddi Sabastian Maimako because he was out of town when the Reporter visited.
However, at FUTMinna, the VC, Prof. Bala explained that the award of contracts must follow due process, especially as VCs are the ones to answer queries regarding the projects.
I have told the Department of Physical Planning and Bursary to keep me informed of everything that has to do with TETfund. There is nothing unusual there. I am in charge of the institution and should know what is happening to our projects.
However, many workers were of the opinion that the procurement process was skewed in favor of those who are known by the Departments of Physical planning in the institutions.
The VC of FUT Minna said that some of the officials in charge of this task do not carry out their duties judiciously while he stressed the need for adequate technical evaluation before a project is awarded to a contractor.
There is also, the problem of capacity of the contractors, some of them could not do the kind of work but again, I blame it on the institution because of the procurement law demands that you must do a technical evaluation, in doing the technical evaluation, you pay due diligence to what you are doing, sometimes, you should be able to identify such problems.
Our university sometimes sends our staff to confirm some of the projects claimed to have been done by the contractor; they will need to have the physical evaluation to confirm the claim. These are some of the little things and the problem that comes in to delay the projects but the problem itself is not from TETFund, it has to do with the procurement process, some of the capacity within the university, some of the capacity with respect to the contractors but TETFund has been very supportive in many of these cases. Sometimes, even when the university has not done its bit, TETFund tries to see how they can help in making sure that we make progress on these projects.
Consultancy Services
This Reporters discovered that the Federal University Lokoja awarded huge amounts for consultancy services. In the 2014 normal intervention project, N52 million out of N53 million allocated to Mevic Consultancy limited for consultancy services; while in the 2013 special intervention projects, Mevic consultancy was paid N77.2 million out of N90.8 million allocated for consultancy service. The nature of the consultancy remains opaque like every other procurement process of Nigerian universities.
Related
Follow this link:
Varsities and TETFund contractors in unholy alliance - Internatinal Centre For Investigative Reporting
Category
Painting Contractors | Comments Off on Varsities and TETFund contractors in unholy alliance – Internatinal Centre For Investigative Reporting
HOUSTON - November 25, 2019 - ( Newswire.com )
Clean Air Houston Pro stands out as one of the best professional cleaners in the whole of the Houston region, owing to the high-quality services it is known to provide. With a host of offerings at the disposal of the store, the cleaners ensure they are updated about the latest technical know-how to incorporate the same, and stand ahead of the rest of their counterparts. The owners attended a recent press conference to announce that the Houstonair duct cleaning business has gradually moved up the ranks since its humble inception.
With time, the Houston air duct cleaningbusiness expanded and shaped up as one of the major dryer vent cleaning units that looked into residential and commercial requirements. The services dispensed here happen round the clock. Upon seeing the wide-ranging work over the years and increasing number of customers making a beeline for the same, the company hence decided to operate on a 24/7 basis. In addition to the availability factor, we also resort to the latest equipment, so as to clean in the most specialized manner, said Ben Shalom, the executive head of the R&D team at Clean Air Houston Pro.
Considering the requirement of having a clean environment for a sustainable living, the air duct cleaning company ownersfrom Houston TX do everything possible to providesupport to customers around the globe. Just because we provide services everywhere, we do not charge heftily. The rates are affordable and apply as per the type of professional cleaning that is derived from us, assured the executive member.
In a meeting held recently with Ben Shalom, he said, Our motto is to see that the lungs are clean and the AC or HVAC systems customers use are also consuming less energy. The heating and cooling systems frequently accumulate dirt, dust and grime owing to greater usage. Hence, we recommend periodic cleaning.In getting the systems clean, less energy would be taken up and that would eventually lead to cost-effectiveness; something that most customers are unaware of.
About the Company
Clean Air Houston Pro is a leading professional cleaning firm in Houston.
To know more, visit https://cleanairhoustonpro.com
Phone: (832) 368-9937
Full Address: 3306 Inverness Path Lane, Houston, TX 77053
Press Release Service by Newswire.com
Original Source: Clean Air Houston Pro Retains Its Position as the Top Professional Cleaners in Houston
The rest is here:
Clean Air Houston Pro Retains Its Position as the Top Professional Cleaners in Houston - Valdosta Daily Times
Category
Air Duct Cleaning | Comments Off on Clean Air Houston Pro Retains Its Position as the Top Professional Cleaners in Houston – Valdosta Daily Times
One day in 1980, as it sat perched atop the bed of a tractor-trailer, the historic Felts Log House made a sluggish but steady trip from Logan County to its new home at Western Kentucky University.
The journey is documented in an archived black-and-white photograph, where the log structure can be seen plodding its way up what is now WKUs Avenue of Champions, flanked by several vehicles.
Since its construction in Logan County in 1810 and for 150 years afterward the Felts Log House was home to the descendants of Archibald Felts, a Revolutionary War veteran and early settler of Kentucky back when it was considered a frontier.
Felts descendants continued living in the house until the 1960s. In 1978, it was donated to WKU, where it was relocated just outside the Kentucky Museum on campus.
Today, the house is in need of restoration, which will be made possible thanks in part to a new $36,000 grant from the E. Rhodes and Leona B. Carpenter Foundation.
Its become an icon for WKU, and we want to preserve that, said Brent Bjorkman, director of the Kentucky Museum. We just cant be more grateful.
Standing in the cabin Monday, Bjorkman noted some deterioration, which he expects will be addressed by a restoration project that will begin in the spring.
It does need a lot of help, he said.
Built from poplar, oak and walnut trees, the two-story cabin is divided by a dogtrot, which is a roofed passage similar to a breezeway. On summer days, Bjorkman said, residents could have used it to flow air through the homes rooms. On one side lies a kitchen and dining area, and on the other, what could have been the Felts bedroom. Two childrens rooms are upstairs, past a steep staircase that twists around a corner.
The cabins living quarters are filled with simple wooden furniture and tools meant to mimic the age, including a sugar chest that a 19th century family could have used to keep supplies.
Its been such a teaching tool here on campus, Bjorkman said, adding that history and architecture have used it in their studies.
Its also become a point of pride on campus, he said. Its not uncommon for people to approach him and identify themselves as descendants of the Felts family, Bjorkman said.
Theres a lot of pride in that, he said.
WKU said the American Antique Cabin Co. described as one of the top consultants nationwide in antique log restoration developed a restoration plan for the house beginning early next year.
It will be restored using period-appropriate materials. Bjorkman said the project will focus on areas near the homes entryway and doors, along with improvements to its chinking, meaning the material between each log that helps insulate the cabin.
The project will offer opportunities for WKU students to view and engage with historic preservation in action, a university news release said.
The Felts Log House has a lot to offer students and visitors to campus, Bjorkman said.
Everyone is drawn to it in a certain way, he said.
Follow education reporter Aaron Mudd on Twitter @BGDN_edbeat or visit bgdailynews.com.
Here is the original post:
Felts Log House at WKU to receive restoration - Bowling Green Daily News
Category
Home Restoration | Comments Off on Felts Log House at WKU to receive restoration – Bowling Green Daily News
Restoration project is under way at the John Adams birthplace in Quincy.
QUINCY It's set to be a busy off season at the John Adams Birthplace.
The national park has only been closed for a few weeks, but the small historic home on Franklin Street is already shrouded in scaffolding as workers prepare to replace the south and west-facing sides of the house. The siding hasn't been replaced since 1984, facilities manager Kevin Kelly said, and the restoration work "is greatly needed."
"The exterior has really deteriorated," Kelly said. "But it gets tricky to find the talent and materials necessary to do restoration projects like this There's not a lot we can just pick up at Home Depot."
The John Adams Birthplace is a two-story wooden house at the corner of Franklin Street and Presidents Avenue. It was built in 1722 by Deacon John Adams, father to the second president of the United States. John Adams was born there in 1735.
Pine clapboards make up the current siding of the house, and the wood isn't treated or finished in anyway to preserve the historic feel. Kelly said pine isn't rot resistant at all, so this time around builders are going to replace the current wood with boards of Sitka spruce sourced from Alaska in hopes the similar-looking material will hold up better in winter weather.
Wood was replaced on a non-historic addition to the home two years ago and builders took the opportunity to try out another type of wood - ponderosa pine that had been treated with ammonia and quartz. But Kelly said that type of wood ended up with a greenish tint to it and "wouldn't be appropriate" for the historic parts of the house.
And it's not just sourcing material that makes the project hard. Kelly says the way the boards are laid is very particular and hard-to replicate, making the restoration a time-consuming endeavor.
"Each clapboard laps 2 inches and it's an angled, tapered cut that we've tried many times to do with modern machinery," Kelly said. "But it always proves faster and more efficient by hand."
Kelly said the south-facing side the front of the house is expected to be completed by mid-January and the west-facing side by March. If they have extra time before the park reopens in May, they'll start working on the other sides as well.
"We really just thought we were going to replace the bottom 10 boards because those are in the worst shape and have deteriorated the most, but it turns out that we have the talent and it's worthwhile to try to do what we can now," Kelly said.
Last year, the exterior of the Adams Carriage House on Adams Street was replaced.
The birthplace project also includes the replacement of window glass and sashes the part of the window that holds the glass and framework in place.
The restoration is expected to cost $100,000 and will be paid for by visitor fees.
See original here:
Two sides of Adams birthplace to be replaced this winter - The Patriot Ledger
Category
Home Restoration | Comments Off on Two sides of Adams birthplace to be replaced this winter – The Patriot Ledger
Kris Kringle The Musical has announced the full cast for its upstate New York production in Schenectady next month featuring celebrity narrator Eve Plumb. Kris Kringle The Musical is created by Maria Ciampi (original story, book and additional lyrics), Tim Janis (music, lyrics and original orchestrations), Angelo Natalie (music and lyrics), and Frank Galgano and Matt Castle (orchestrations). The Schenectady production is directed by Frank Galgano and choreographed by Jaimie Selke, with Matt Castle serving as music director. Kris Kringle The Musical will be performed December 14-15 at Proctors (432 State Street) in Schenectady, NY; Proctors.org.
In addition to Eve Plumb ("The Brady Bunch") as Aunty Sugarplum, the show will feature a standout cast of Broadway regulars and industry veterans, including Ashley Chiu (Off-Broadway's KPOP) as Garland Pie, Vivienne Cleary (Off Bway's Once Upon a Mattress) as Ms. Horn, Ron DeStefano (Lincoln Center) as Sky Banner, Elizabeth Ward Land (Broadway's Memphis) as Grandma Kringle, Aveena Sawyer (National Tour of Something Rotten!) as Tinselle Splade, Kyle Sherman (Off-Broadway's Ordinary Days) as Kris Kringle, Christopher Shyer (Broadway's Mamma Mia) as Roy G. Reedy, Jason Simon (Lincoln Center's Show Boat) as Santa Claus, Gerianne Prez (Broadway's In Transit) as Evelyn Nol, Nick Varricchino (Atlantis Theatrical's Beautiful: The Carole King Musical) as Elmer Elf, and Rema Webb (Broadway's The Color Purple, The Lion King) as Mrs. Claus.
The ensemble features Quentin Avery Brown, Marjorie Failoni (Broadway's Escape to Margaritaville), Melissa Jones (Beauty and the Beast National Tour), and Jose Luaces (Broadway's A Christmas Story).
In addition, Kris Kringle The Musical will boast an all-star creative team, including puppetry by Rick Lyon, who created puppets for the Tony Award winning "Best Musical" Avenue Q; lighting design by Tony Award-winner Jeff Croiter; sound design by Emmy Award-winner Matt Kraus; and projections by Drama Desk nominee John Narun.
Kris Kringle The Musical is a brand-new, wholly original Christmas musical for the whole family that reveals the untold story of Kris Kringle. Discover what happens when an evil toy company CEO crosses paths with a young, jobless toymaker whose family name carries a curse with the power to destroy Christmas. From the top of the world in the North Pole, Kris Kringle teams up with Santa and Mrs. Claus, the beautiful Evelyn Nol, a band of hilarious Apprentices and Elves, and magical Toys to remind us what Christmas is really all about - love, hope, and finding a family in the most unlikely of places.
Kris Kringle The Musical has a magnificent score and memorable songs (including "Unwrap the Christmas Magic," "Beautiful," "My North Star," "Something Wonderful in You" and "Green Suede Shoes"), destined to become holiday classics. In February 2018, a Studio Cast Recording was released, starring Andrew Keenan-Bolger (Newsies) and Nikki Rene Daniels (Porgy and Bess; The Book of Mormon), with Janine La Manna (Seussical), Kim Crosby (Into the Woods) and Mary Stout (Beauty and the Beast).
Kris Kringle The Musical made its New York City debut at The Town Hall in November 2017, and was originally narrated by Tony Award nominee, Cathy Rigby.
Eve Plumb started her acting career at age 6, performing in many commercials en route to epic stardom in the 1970s. She is most known for television roles including recent appearances on Crashing, Blue Bloods, The Path, Grease Live, Army Wives and, of course, as the iconic middle sister, Jan Brady, on The Brady Bunch. Plumb has also had key roles in TV movies such as Dawn: Portrait of A Teenage Runaway and Little Women.
Also an accomplished painter, Plumb's stage credits include off-Broadway appearances in Nora and Delia Ephron's Love, Loss, And What I Wore, Unbroken Circle and Miss Abigail's Guide to Dating, Mating & Marriage as well as regional theatre work throughout the United States. Recent film appearances include Blue Ruin (Winner Cannes Directors' Fortnight, Sundance Spotlight Festival, Independent Spirit nominee) and Monsoon. TV audiences saw a new side of Plumb - who studied improv comedy at The Groundlings School in Los Angeles - when she shared her love for home renovation and restoration on A Very Brady Renovation on HGTV.
Keenan-Bolger called Kris Kringle The Musical "[a] holiday musical for a new generation-a gorgeous score paired with a heartwarming tale of family and forgiveness." During the 2019 holiday season at Proctors, Kris Kringle will further attest that it is indeed a holiday treat for a new generation by the use, for the first time, of enchanting projections to heighten the storytelling experience.
Tickets for Kris Kringle The Musical range from $20-$60 for Saturday, December 14 at 2:00 PM and 8:00 PM, and Sunday, December 15 at 2:00 PM. Tickets are available at the Box Office at Proctors, 432 State Street, Schenectady; by phone at (518) 346-6204; and online at proctors.org.
Read the original post:
Eve Plumb to Star in KRIS KRINGLE THE MUSICAL at Proctors Theater - Broadway World
Category
Home Restoration | Comments Off on Eve Plumb to Star in KRIS KRINGLE THE MUSICAL at Proctors Theater – Broadway World
It started with a couple of spots on the ceiling.
Just dirt, they thought, dust collecting near a couple of air ducts on the ceiling of the sanctuary.
But it proved more insidious than that: mold, black mold the visible sign of a disease that had invisibly infected the historic Greene Memorial United Methodist Church for years. The 130-year-old Roanoke church was slowly rotting.
By the time all of the problems were identified and solutions planned, the price tag for treatment reached $1.3 million a dangerous amount for a small congregation, but one the church decided was worth it.
The problems are just about all cleared up now. The sanctuary is spot-free and gleaming under new LED lights.
On Sunday, congregants will return to their old wood pews beneath soaring vaulted ceilings for the first time in a year. Services had been held in the church social hall and even in a large lobby in the meantime.
But the cost of saving the church has strained Greene Memorials coffers. Church leaders decided that preserving the historic building was important in itself, but also crucial to maintaining the congregations mission work, much of which focuses on downtown issues and organizations.
I think were on the edge financially, said Debbie Brown, director of programs and outreach ministries for Greene Memorial.
The church dipped into its endowment to pay the growing bill for the repairs. That means its on the brink of being unable to maintain support for all of its mission programs.
We know that in order to do any more repairs, that is definitely going to cut into anything we can do for the community, Brown said.
So theyve launched a Go Fund Me campaign that aims to raise $300,000.
The hope is that the community the church serves will help revive it financially.
It kind of escalated
Once a closer look revealed in October 2018 that the spots on the sanctuary ceiling were mold, the bad news kept coming.
The more they looked, the worse it got, Brown said.
Mold experts found the stuff not just in the sanctuary but all over the building.
Cracking and peeling wallpaper in the sanctuary indicated water was coming in. Water damage was found in the churchs educational wing.
Experts took two passes to identify and remove all the mold, Brown said. Then it was time to address the root causes.
Death by a thousand cuts, restoration contractor Colin Waters said. His company, Huntly-based Waters Craftsman, which works almost exclusively on historic churches, was brought in to assess the problems.
They were many, and typical.
Over the sanctuary, for example, a previous contractor had installed new modern guttering over the top of the original built-in gutters. It leaked and destroyed the wood structure beneath.
You get some guys who mean well but a lot of those times those modern techniques dont really mesh with a historic building, Waters said. You need a real craftsman to do that metal work. Otherwise youre just doing more harm than good.
Roof flashing was beyond its useful life all over the slate roof, and over the educational wing, faulty original construction and multiple past repairs allowed water to infiltrate the churchs exterior walls. That meant disassembling the walls to put in a functioning barrier to keep water out in the future. Subcontractor Blue Ridge Restoration of Lexington is handling the roof repairs.
Greene Memorials problems are a familiar story for Waters: Theyre common to historic churches.
Unfortunately, a lot of these churches are up against a pretty steep maintenance curve, he said. Youve got a building thats a real monster to maintain, and if you let it get away from you, you can really lose your butt.
Brown said church leaders were glad to identify the problems.
However, that came with a price tag, she said, and it kind of escalated.
As the list of problems grew, the churchs governing council and building trustees were faced with a decision: Should they spend the money to fix the building, or move?
Brown said church leaders had set a cost they could tolerate for the building repairs. But then the actual costs blew right past that limit by hundreds of thousands of dollars.
Church leaders asked themselves what the corner of Second Street and Church Avenue would be like without the church.
No one liked the answers they envisioned. Leaving downtown never got much consideration, Brown said.
The thinking went well beyond the building itself and landed on how strongly the churchs downtown location was connected to its mission.
Greene Memorials outreach programs often focus on issues connected to the citys center, such as homelessness, and it partners with other nonprofits nearby. The church renovated the buildings educational wing about 10 years ago to enhance those partnerships.
Dozens of organizations use the church for meetings, and some city staff who serve the homeless have their offices there.
The citys annual point-in-time count of the homeless population is headquartered at the church.
Theyve kind of been the hub of a lot of the social change and a lot of the dynamics that have taken place in downtown, said Vice Mayor Joe Cobb. Theyre very mission-minded, and to me the mission is not other places its really focused in the heart of downtown.
Greene Memorial was a founding member of Congregations in Action, a group of churches that stepped in to support Highland Park Elementary School when it had no PTA.
The churches provide snacks and meals for students in poverty, hold clothing and school supply drives, and host the schools annual Fun Day, Principal Mark Crummy said.
That relationship happened because the school is so near downtown.
Theyre all great churches, Crummy said of the CIA members, but Greene has really been the touchstone for us.
The church was a charter member of Family Promise of the Greater Roanoke Valley, through which congregations use church facilities to provide housing and meals for homeless families, while the organization helps them find jobs and permanent housing.
Marie Muddiman, executive director of Family Promise, noted that the church also hosts the annual memorial service for the homeless people who died during the year.
And congregants knit hats and scarves that they leave in bags on the fence around the church for those in need.
If youre cold and walking by, theres a hat for you. Thats a small ministry but an important one, Muddiman said.
And then there are the bells that toll the hour, which can be heard across a large swath of downtown.
Who doesnt recognize the chimes? Cobb asked. They may not know where they come from, but they come from Greene Memorial.
The thought of not having Greene Memorial in downtown Roanoke is devastating, said Laura Stockstill, a second-generation member there.
She was married in the church and her three children were baptized there. One son, John, built the platform where musicians set up during services as his Eagle Scout project. She remains friends with people she met in church youth group decades ago.
But the congregation, like many older churches, is shrinking and aging. Its collection plate is not deep.
Members gave generously for the educational wing renovation just a decade ago. Many dont have the wherewithal to give so much again.
The hope is that the larger community will fill the gap.
Its a historical building and it means a lot to not only members of our congregation but so many people in the community, Brown said.
While the fundraising campaign continues, so does the work on the roof. Other jobs, such as repairs to the steeple, will be left undone for the near future.
But at least the congregation will return to its grand sanctuary on Sunday.
Since the mold was discovered, services were held in the basement social hall. A few weeks ago, an exterior drainage problem forced another move into the welcome center a large lobby.
Congregants have tired of the makeshift settings.
Its hard when somebody comes, who is a visitor, Stockstill said. You want to say, this is not what we normally do.
But, she said, holding a single Sunday morning service instead of two and cramming the congregation into smaller spaces has brought members closer.
Still, getting back to their old Sunday morning digs is much anticipated. Last week, musical equipment was moved back in, and hymnals and Bibles were returned to pews.
After the Sunday services, members will decorate for Advent.
Last week, Brown grinned at the thought of members finding their old pews Sunday morning.
I think everybodys going to be blown away when they go in.
More here:
After a year of prayers and repairs, downtown Roanoke church returns home - Roanoke Times
Category
Home Restoration | Comments Off on After a year of prayers and repairs, downtown Roanoke church returns home – Roanoke Times
« old entrysnew entrys »
Page 23«..1020..22232425..3040..»