Categorys
Pages
Linkpartner


    Page 368«..1020..367368369370..380390..»



    Window Replacement High Ridge MO | (314) 690-9900 – Video - January 19, 2014 by Mr HomeBuilder


    Window Replacement High Ridge MO | (314) 690-9900
    Window Replacement High Ridge MO | (314) 690-9900 http://zenwindows.com/locations/window-replacement-st-louis-mo/ Zen Windows is a Replacement Window Company...

    By: Zen Windows St. Louis

    Link:
    Window Replacement High Ridge MO | (314) 690-9900 - Video

    Window Replacement House Springs MO | (314) 690-9900 – Video - January 19, 2014 by Mr HomeBuilder


    Window Replacement House Springs MO | (314) 690-9900
    Window Replacement House Springs MO | (314) 690-9900 http://zenwindows.com/locations/window-replacement-st-louis-mo/ Zen Windows is a Replacement Window Comp...

    By: Zen Windows St. Louis

    Read the original post:
    Window Replacement House Springs MO | (314) 690-9900 - Video

    Window Replacement Imperial MO | (314) 690-9900 – Video - January 19, 2014 by Mr HomeBuilder


    Window Replacement Imperial MO | (314) 690-9900
    Window Replacement Imperial MO | (314) 690-9900 http://zenwindows.com/locations/window-replacement-st-louis-mo/ Zen Windows is a Replacement Window Company l...

    By: Zen Windows St. Louis

    Originally posted here:
    Window Replacement Imperial MO | (314) 690-9900 - Video

    DLNR plans Wailuku building - January 19, 2014 by Mr HomeBuilder

    The state Department of Land and Natural Resources is planning to build a new, nearly $5.7 million replacement administration building on an acre in Wailuku and next to The Maui News offices.

    According to a draft environmental assessment preparation notice from consultant Limtiaco Consulting Group, the department's current Maui administration building at 120 Mahalani St. was built in 1959 and "has approached the end of its useful life."

    "There are observable structural deficiencies in exposed interior and exterior building elements, including severe termite and wood moisture damage . . . vertical cracks and spalls on masonry walls and corroded steel support beams," the notice says. "Sewer, water, electrical and telecommunication components are outdated and do not meet current building code requirements."

    Originally built in 1959 as a juvenile detention center, the Department of Land and Natural Resources Maui office in Wailuku has suffered from severe cracks and damage to its structure over the years. The state department plans to replace the office with a nearly $5.7 million administration building, according to notice for the preparation of a draft environmental assessment. The Maui News / CHRIS SUGIDONO photo

    Kristy Stone, Division of Aquatic Resources monitoring coordinator, works inside her office, which she shares with two other people, Wednesday afternoon at the Department of Land and Natural Resources Wailuku building. The Maui News / CHRIS SUGIDONO photo

    It also notes inadequate space in the building occupied by personnel from the department's divisions of Aquatic Resources, State Historic Preservation and Engineering.

    "Construction of a new facility would allow DLNR to provide adequate space for its current operations and improved site security and infrastructure," the notice says. "A new facility also affords the opportunity to relocate (the department's) Land Division from its deficient office in the State Building and provide them ample office and document storage space."

    Aside from The Maui News, other neighbors include the Maui Community Mental Health Center, the Cameron Center and Maui Memorial Medical Center.

    The project is at the beginning of its environmental review process, which will address environmental, social and economic impacts of the proposed new building. The project's timeline calls for completing the draft environmental assessment in March, with completion of the environmental review process in July. Construction may begin as early as the spring of 2016.

    The new building would be energy efficient and fully accessible to people with disabilities, the preparation notice says.

    View post:
    DLNR plans Wailuku building

    Lepage Window Balance Tube Replacement – Video - January 17, 2014 by Mr HomeBuilder


    Lepage Window Balance Tube Replacement
    How to Replace a balance tube on Lepage window.

    By: Matt Schardan

    More:
    Lepage Window Balance Tube Replacement - Video

    Best Rated Replacement Window Companies Aurora CO | (303) 625-6595 – Video - January 17, 2014 by Mr HomeBuilder


    Best Rated Replacement Window Companies Aurora CO | (303) 625-6595
    Best Rated Replacement Window Companies Aurora CO | (303) 625-6595 http://www.zenwindows.com/denver No Salesman in your home. Window Quotes in 5 Minutes. Zen...

    By: ZenWindowsDenver

    View post:
    Best Rated Replacement Window Companies Aurora CO | (303) 625-6595 - Video

    Patio Doors Northglenn CO | (303) 625-6595 – Video - January 17, 2014 by Mr HomeBuilder


    Patio Doors Northglenn CO | (303) 625-6595
    Patio Doors Northglenn CO | (303) 625-6595 http://www.zenwindows.com/denver No Salesman in your home. Window Quotes in 5 Minutes. Zen Windows is a Replacemen...

    By: ZenWindowsDenver

    Read the original post:
    Patio Doors Northglenn CO | (303) 625-6595 - Video

    Vinyl Window Co Austin Texas – Video - January 17, 2014 by Mr HomeBuilder


    Vinyl Window Co Austin Texas
    http://vinylbuildingproducts.net/replacement-windows-austin-texas/ Make certain you are happy with results of your replacement windows Austin job. The homeow...

    By: MyMcho

    Read more from the original source:
    Vinyl Window Co Austin Texas - Video

    Replacing Rusty, Leaky Basement Windows | Ask the Expert | Leader Basement Systems – Video - January 17, 2014 by Mr HomeBuilder


    Replacing Rusty, Leaky Basement Windows | Ask the Expert | Leader Basement Systems
    http://www.leaderbasementsystems.com | 1-800-680-5931 Meet Craig Leader, owner of Leader Basement Systems. Craig Leader has been helping residential and comm...

    By: Leader Basement Systems

    Visit link:
    Replacing Rusty, Leaky Basement Windows | Ask the Expert | Leader Basement Systems - Video

    Bradford Council planning applications - January 17, 2014 by Mr HomeBuilder

    Bradford Council planning applications

    3:16pm Friday 17th January 2014 in News

    The following planning applications have been lodged with Bradford Council: Heaton: construction of single- storey extension to rear, 19 Saltburn Place. Heaton: conversion of garage to gym with first floor extension above, 7 Wharfedale Rise. Heaton: dormer window to front elevation, 54 Duckworth Terrace. Heaton: hip to gable conversion, rear conservatory and replacement garage, 5 Highfield Crescent. Heaton: rear extension to planning permission 13/01955/FUL dated 19.09.2013: rear first floor extension to restaurant, 135-137 Toller Lane. Heaton: single-storey side extension and dormer windows, 28 Coniston Grove. Heaton: two-storey side and rear extensions, 17 Branksome Crescent.

    Idle: convert six-bedroomed dwelling to three one-bedroom flats, 4 Croft Street. Idle: retrospective application for siting of glass greenhouse, land adjacent to 13 Greenfield Lane.

    Ilkley: extension and conversion of existing garage to form office space, 97 Bolling Road. Ilkley: extensions and alterations to existing building, 59-61 East Parade. Ilkley: non-material amendment to permission 13/03497/FUL dated 23.10.13: conversion of existing ground and lower ground floor flat into two flats, resubmission of refused application 13/01457/FUL, Nesham House, 7 Wilton Road. Ilkley: non-material amendment to planning permission 12/04644/REM dated 14.02.2013: (adjustment of the plot locations away from the northern and western boundaries) residential development of six detached dwellings Reserved Matters relating to approved outline planning permission 10/03956/OUT, land east of 20 Cheltenham Avenue. Ilkley: replacement of existing external timber glazed doors with polyester powder coated aluminium glazed doors, apartment 27 Wells House, 10 Brodrick Drive. Ilkley: replacement of existing external timber glazed doors with polyester powder coated aluminium glazed doors, apartment 3 Wells House, 10 Brodrick Drive.

    Ilkley: replacement of existing rear extension and garage roof with roof terrace, conversion of lower ground floor store rooms to habitable accommodation and various internal alterations at ground floor level, 21 Wheatley Grove. Ilkley: replacement of external timber glazed doors with aluminium glazed doors, apartment 27 Wells House, 10 Brodrick Drive. Ilkley: roof alterations and rear extension to form rooms in loft, Lingmoor, 56 Kings Road. Ilkley: single-storey extension to existing snack kiosk and refurbishment of below-ground tank, Cow and Calf Cafe, Cow and Calf Rocks, Hangingstone Road. Ilkley: single- storey rear extension and new side windows, 6 Ashburn Place. Ilkley: two-storey side extensions, single- storey rear extension and new driveway with altered access, 10 Southway, Manor Park.

    Keighley: construction of an external boiler house and associated biomass pellet store to the rear, Keighley Golf Club, Keelham Lane. Keighley: re-cladding of existing main stand and single storey gymnasium building, existing timber terrace seating to be removed and replaced by new seated terracing, Keighley Cougars Rugby League Football Club, Hard Ings Road. Keighley: restoration work to shop front including replacement of glazing door, timber panelling and existing ventilation on window head, 28-34 Church Street.

    Originally posted here:
    Bradford Council planning applications

    « old entrysnew entrys »



    Page 368«..1020..367368369370..380390..»


    Recent Posts