Categorys
Pages
Linkpartner


    Page 22«..10..21222324..3040..»



    3 Phase Electrical wiring installation in buliding 15 – Video - December 26, 2014 by Mr HomeBuilder


    3 Phase Electrical wiring installation in buliding 15

    By: suhair mohamed

    Read the original:
    3 Phase Electrical wiring installation in buliding 15 - Video

    3 Phase Electrical wiring installation in buliding 18 – Video - December 26, 2014 by Mr HomeBuilder


    3 Phase Electrical wiring installation in buliding 18
    0774010947.

    By: suhair mohamed

    Read the original post:
    3 Phase Electrical wiring installation in buliding 18 - Video

    3 Phase Electrical wiring installation in buliding 10 – Video - December 25, 2014 by Mr HomeBuilder


    3 Phase Electrical wiring installation in buliding 10
    0774010947 suhair.

    By: suhair mohamed

    Continued here:
    3 Phase Electrical wiring installation in buliding 10 - Video

    3 Phase Electrical wiring installation in buliding 11 – Video - December 25, 2014 by Mr HomeBuilder


    3 Phase Electrical wiring installation in buliding 11
    MJM Suhair No 71/B mosque Road Beruwala mobile 0774010947.

    By: suhair mohamed

    Continue reading here:
    3 Phase Electrical wiring installation in buliding 11 - Video

    3 Phase Electrical wiring installation in buliding 14 – Video - December 25, 2014 by Mr HomeBuilder


    3 Phase Electrical wiring installation in buliding 14
    MJM suhair No 71/b Mosque Road Beruwala 0774010947.

    By: suhair mohamed

    Read the original:
    3 Phase Electrical wiring installation in buliding 14 - Video

    3 Phase Electrical wiring installation in buliding 16 – Video - December 25, 2014 by Mr HomeBuilder


    3 Phase Electrical wiring installation in buliding 16

    By: suhair mohamed

    More here:
    3 Phase Electrical wiring installation in buliding 16 - Video

    3 Phase Electrical wiring installation in buliding 17 – Video - December 25, 2014 by Mr HomeBuilder


    3 Phase Electrical wiring installation in buliding 17

    By: suhair mohamed

    Read more:
    3 Phase Electrical wiring installation in buliding 17 - Video

    Gulf Coast Avionics Completes Panamanian Bell 412EP Panel Upgrade - December 25, 2014 by Mr HomeBuilder

    Lakeland, FL, December 23, 2014 Rick Garcia, President and CEO, Gulf Coast Avionics announced that the company recently completed a full digital upgrade on a Bell 412EP helicopter operated by the Panamanian Servicio Nacional Aeronaval.

    When this 412 arrived in our shop last August it looked every bit like a helicopter that had worked long and hard. As you can imagine, its original analog avionics and instruments were becoming unreliable and difficult to repair, Garcia said. The state-of-the-art digital avionics package including Garmin Helicopter Synthetic Vision (HSVT) gives Panamanian Public Forces pilots the highest levels of system reliability, safety and situational awareness.

    Andy Smith, GCAs Installation Sales Representative explained that the project began with the removal of all of the helicopters original analog avionics, mechanical flight and engine instruments, wiring harnesses, and mounting hardware.

    To accommodate the new Garmin EFDs, GTN radios and Electronics International digital engine displays we had to design and fabricate a new, custom metal instrument panel and center pedestal for the 412, he said. We also had to build-up new wiring harnesses that would integrate all the new digital avionics with the original autopilot, weather radar and other instruments that were staying in the aircraft."

    One of the major challenges with this upgrade was integrating the analog units the operator wanted to keep in the aircraft. It took a lot of effort and planning to get the autopilot, radar, engine instruments, TCAS and other systems to work seamlessly with the new digital displays, Smith said. We couldnt have done it all without a tremendous amount of help from the support teams at Garmin and Electronics International. Their cooperation was invaluable.

    Smith explained that the upgraded Bell 412EP panel now features:

    Dual Garmin G500H dual-screen electronic flight displays with HSVT

    Dual Garmin GTN 650H touchscreen GPS/NAV/COMs

    Dual Garmin GTX 33 remote Mode S transponders

    Garmin GMA 340 digital audio panel

    Original post:
    Gulf Coast Avionics Completes Panamanian Bell 412EP Panel Upgrade

    Manufacturing/CNC Maintenance - December 25, 2014 by Mr HomeBuilder

    Employer:

    Packers Plus Energy Services

    Updated: Dec232014

    Job posting bookmarked!

    Packers Plus is the innovator of open hole, multi-stage horizontal fracturing and we provide technology-based solutions to the oil and gas industry around the world. We are looking for a Manufacturing/CNC Maintenance Mechanic in our northwest Houston office.

    Key Tasks and Responsibilities

    Responsible for the maintenance and repair of all equipment and computer numerical control systems including axis/spindle drive systems. Performs tests and repair of Robotic, CNC and PLC systems. Repairs and calibrates instrumentation/ process controls in compliance with API and ISO quality specifications and/or safety systems requirements. Read and interpret electrical drawings and schematics Installing electrical wiring. Maintaining an accurate and detailed record of repairs done to all equipment. Performing preventative maintenance on production equipment as required Installation of conduit and wiring for new equipment, or repairs as required Install piping, hoses and tubing for air, hydraulics and water as required. May be responsible for training other team members and facilitating team activities and any special projects as needed.

    Educational Requirements

    High School Diploma or GED. Associates or Bachelor's degree in Electrical/Electronics preferred

    Original post:
    Manufacturing/CNC Maintenance

    3 Phase Electrical wiring installation in buliding 2 – Video - December 22, 2014 by Mr HomeBuilder


    3 Phase Electrical wiring installation in buliding 2
    M.J.M suhair No 71/B mosque road Beruwala mobile 0774010947.

    By: suhair mohamed

    Read more from the original source:
    3 Phase Electrical wiring installation in buliding 2 - Video

    « old entrysnew entrys »



    Page 22«..10..21222324..3040..»


    Recent Posts