Steven Spearie The State Journal-Register @stevenspearie

SundayOct4,2020at8:01AM

City of Springfield Public Works will begin a number of projects beginning Monday weather permitting.

Drainage correction and surface restoration will begin on Harbauer Lane with gutter repairs slated for the 200 block of North Lincoln Avenue; 1500 block of South Lincoln Avenue; 3300 block of Mackinaw Lane; 3800 block of West Bluffs Road and 4300 block of Fielding Drive.

Sidewalk repairs will be addressed in the 100 block of West Lawrence Avenue; 500 block of South New Street; 1300 block of South State Street; 2100 block of North 17th Street and 200 block of North Douglas Avenue.

Utility relocation on the east side of Hilltop Road between Destiny Drive and Lost Bridge Trail continues as part of the Hilltop Road Trail Extension.

Underdrain and curb installation is ongoing at Archer Elevator Road. It is closed from Yucan Drive to Iles Avenue through Nov. 30.

Due to ongoing underpass work, Fifth Street is reduced to three lanes southbound between Broad Place and Iles Avenue and Sixth Street is reduced to two lanes northbound from Wellesley Avenue to Broad Place.

Contact Steven Spearie: 622-1788, sspearie@sj-r.com, twitter.com/stevenspearie.

Follow this link:
Surface restoration begins on Harbauer Lane - The State Journal-Register

Related Posts
October 4, 2020 at 7:55 pm by Mr HomeBuilder
Category: Gutter Installation