Categorys
Pages
Linkpartner

    Home Builder Developer - Interior Renovation and Design



    Page 10,382«..1020..10,38110,38210,38310,384..10,39010,400..»



    Caledonia – (Foreign Architects Cover) – Video

    - January 17, 2014 by Mr HomeBuilder


    Caledonia - (Foreign Architects Cover)
    Matt Burke from Foreign Architects performs #39;Caledonia #39;.

    By: Foreign Architects

    Read more:
    Caledonia - (Foreign Architects Cover) - Video

    HVAC Contractors Increase Profits with Rotobrush Air Duct Cleaning Services – Video

    - January 17, 2014 by Mr HomeBuilder


    HVAC Contractors Increase Profits with Rotobrush Air Duct Cleaning Services
    http://www.Rotobrush.com - Throughout the industry, HVAC professionals are now offering Air Duct Cleaning services to their clients. Don #39;t get left behind! L...

    By: Rotobrush

    Link:
    HVAC Contractors Increase Profits with Rotobrush Air Duct Cleaning Services - Video

    Residential Air Duct Cleaning – Video

    - January 17, 2014 by Mr HomeBuilder


    Residential Air Duct Cleaning

    By: kobonaty .com

    Read more:
    Residential Air Duct Cleaning - Video

    Howard Services Inc| Air Conditioning and Heating Service – Video

    - January 17, 2014 by Mr HomeBuilder


    Howard Services Inc| Air Conditioning and Heating Service
    Howard Services Inc., Has been serving Jacksonville FL and surrounding areas sense 1968. We are the air conditioning pro #39;s you can trust. AC Repair, Heating ...

    By: Howard Services Inc

    See the original post:
    Howard Services Inc| Air Conditioning and Heating Service - Video

    Teachers’ union still concerned over air quality at Lindsay school

    - January 17, 2014 by Mr HomeBuilder

    Kawartha Lakes This Week

    (LINDSAY) Despite improvements made in several areas at Leslie Frost Public School, the local teachers union continues to be concerned over air quality at the Lindsay facility.

    On Sept. 26, an independent environmental consultant tested three classrooms and an Oct. 9 report indicated elevated carbon dioxide levels in one room. An air handling unit problem was found and fixed, but retesting on Nov. 13, showed levels remained elevated.

    More work and testing followed. Parents were informed that results fell outside of provincially legislated, allowable levels. As a precaution, staff were asked to open windows and doors.

    Still concerned over conflicting reports - documents showed CO2 levels were above American Society of Heating, Refrigerating and Air Conditioning Engineers (ASHRAE) standards - and after complaints from members, local Elementary Teachers Federation (ETFO) president Steve Colliver pushed the Trillium Lakelands District School Board for further action.

    The Ministry of Labour was contacted and further testing, this time on all classrooms and portables, took place Dec. 6.

    The Board has always believed it has been following the Health and Safety Act, said board human resources administrator Earl Manners, citing union referenced standards were not the proper ones.

    A report filed by the Ministry indicated the Boards action meet the Act. No orders were issued for the Board.

    Further work was done, including minor repairs to individual air units in portables as well as duct work and cleaning inside the school.

    However, the union is still not overly pleased.

    Read the original:
    Teachers’ union still concerned over air quality at Lindsay school

    Retaining Walls|Moundsville WV|26041|Retaining Wall Contractors|Landscaping – Video

    - January 17, 2014 by Mr HomeBuilder


    Retaining Walls|Moundsville WV|26041|Retaining Wall Contractors|Landscaping
    Retaining Walls|Moundsville WV|26041|Retaining Wall Contractors|Landscaping (304) 547-9426 Allstate Construction specializes in retaining walls. We have buil...

    By: GoProtos Media

    Originally posted here:
    Retaining Walls|Moundsville WV|26041|Retaining Wall Contractors|Landscaping - Video

    City retaining wall loses several boulders – Video

    - January 17, 2014 by Mr HomeBuilder


    City retaining wall loses several boulders
    Retaining wall loses several boulders in Boston.

    By: WCVB Channel 5 Boston

    Continue reading here:
    City retaining wall loses several boulders - Video

    Company in W.Va. chemical spill cited at 2nd site

    - January 17, 2014 by Mr HomeBuilder

    The company responsible for the chemical spill in West Virginia moved its chemicals to a nearby plant that has already been cited for safety violations, including a backup containment wall with holes in it.

    As a result, state officials may force the company to move the chemicals to a third site.

    Inspectors on Monday found five safety violations at Freedom Industries' storage facility in Nitro, about 10 miles from the spill site in Charleston. The spill contaminated the drinking water for 300,000 people, and about half of them were still waiting for officials to lift the ban on tap water.

    The West Virginia Bureau for Public Health issued a statement Wednesday evening advising pregnant women not to drink the water "until there are no longer detectable levels" of 4-methylcyclohexane methanol, a chemical used in coal processing. The statement said it was making the recommendation "out of an abundance of caution" after consulting with the U.S. Centers for Disease Control and Prevention.

    The Department of Environmental Protection on Friday ordered Freedom Industries to move all of its chemicals to the Nitro site.

    According to a report from the department, inspectors found that, like the Charleston facility, the Nitro site's last-resort containment wall had holes in it. The report described the site's wall as "deteriorated or nonexistent."

    Freedom Industries said the building's walls acted as a secondary containment dike, but state inspectors disagreed. The walls had holes in them near the ground level, and they led out to a stormwater trench surrounding the structure's exterior, the report said.

    Department spokesman Tom Aluise said the ditch eventually drains into the Kanawha River. The Nitro facility isn't on a riverbank, like the other facility.

    The facility had no documentation of inspections of the Nitro site. Nor did it have proof of employee training in the past 10 years, the report said.

    Aluise said the state could force Freedom to move the chemicals to a third site, or build secondary containment structures at the Nitro facility. He said the department would issue an administrative order Thursday morning detailing what corrective action will be required. Asked what possible penalties would be brought against the company, Aluise responded in an email: "Yet to be determined."

    Read the original post:
    Company in W.Va. chemical spill cited at 2nd site

    Collapsed retaining wall leads to questions about $320,000 football field

    - January 17, 2014 by Mr HomeBuilder

    FAIRFIELD COUNTY, SC (WIS) -

    Fairfield County taxpayers are demanding answers after finding out the county spent more than $300,000 on a football field. Over the weekend, a $40,000 retaining wall at the field crumbled to the ground.

    The county finished construction four months ago, but the field still isn't finished.

    The people we spoke with say they don't want another dime spent on this project and want those responsible for spending the money on the field to explain why Fairfield County needed it.

    "I bet I told 50 people that wall was coming down," said former Fairfield County Councilman William Turner.

    "What just ticks me off, I'm a taxpayer in this county and I just see y'all wave your arms and just -- I'm taking a $4,000 check down there today to pay taxes and see it wasted like this? That's what just disturbs me," said Fairfield County citizen Clyde Wade.

    Fairfield County Administrator Milton Pope got a dressing down when he showed up to inspect the wall collapse at the county park Monday morning.

    A huge section of a cinder block retaining wall fell over and took with it a fence taxpayers spent more than $40,000 to put up.

    Pope gave his workers his initial assessment as soon as he walked up:

    "Unless they didn't follow the plans right, it's built right," said Pope. "It just didn't give it, the wall, the time to pack before it got all that water in it.

    Original post:
    Collapsed retaining wall leads to questions about $320,000 football field

    Caltrans’ tar tale

    - January 17, 2014 by Mr HomeBuilder

    After more than two years of news stories and paying for two cleanups, Caltrans has finally removed the black tar ooze from a pre-modern era concrete retaining wall along Highway 128 just 40 feet from the Navarro River.

    This newspaper literally exposed the mess attached to the front of the old concrete structure in our first story printed in summer 2012.

    State regulators, responding to California Public Records Act requests for comment from this newspaper, had to use GPS devices to find the wall among dense brush back then. The low, west end of it is just 10 feet from the roadway, about 100 yards east of the intersection of Highway 1 and Highway 128, on the east (mountain) side of the road.

    A huge tank dispensed tar for blacktopping from atop the wall from the 1950s to 1970s. This kind of practice was common at the time but became strictly illegal due to emerging environmental regulations and concerns.

    This newspaper's investigation printed in a half dozen stories over the past two years, exposed (after initial denial) that Caltrans had originally proposed to remove the entire wall structure as part of a $1.5 million guardrail replacing and enhancing project for a still planned nearby upgrade on Highway 128 but pulled the cleanup out of the project, baffling regulators at the North Coast Regional Water Quality Control Board. The two projects are now separate.

    Phil Frisbie Jr.

    "Just to be clear, this cleanup work was never part of, or within the project area, of the guardrail project. The guardrail project is scheduled to go out to bid this spring and to construction this summer," said Frisbie.

    Second cleanup seems to be working

    A three-day cleanup in November, a year after the first, botched cleanup, filled three 20-cubic-yard disposal bins (about 26 tons of waste). Cleaned up by workers wearing protective and hazmat suits, it was transported under a non-hazardous waste manifest to the Potrero Hill Class II Landfill facility located in Suisun.

    "The asphalt emulsion oil (tar) ranging in thickness from 1 to 4 feet was removed from behind the retaining wall using a 60-pound electric jack hammer and hand tools. The asphalt emulsion oil was removed to exposed native soil. The removed asphalt emulsion oil and associated soil and debris was then placed in the Bobcat bucket and transferred to the disposal bins," Geocon Consultants, the company that did both cleanups, wrote to Caltrans.

    View original post here:
    Caltrans' tar tale

    « old Postsnew Posts »ogtzuq

    Page 10,382«..1020..10,38110,38210,38310,384..10,39010,400..»


    Recent Posts