Home Builder Developer - Interior Renovation and Design
-
December 10, 2020 by
Mr HomeBuilder
Love it or hate it, Boston City Hall has been saved from the wrecking ball. Now, its younger concrete cousin, the Charles F. Hurley Building, is poised for a similar rescue. As state officials move to redevelop the Hurley site at the edge of the West End and Government Center, they are making it clear that total demolition is unlikely.
The states formal proposal, made public last week, represents a subtle but important shift in thinking since the Baker administration started this process in 2019.
Is it a beauty, or a beast? Depends on whom you ask. Like with City Hall around the corner, preservationists say the Hurley represents a distinct style of architecture that hearkens back to an era when government buildings were meant to be fortresses to endure the vagaries of time. For the haters, a flip side: These edifices recall an era when bureaucrats buried entire city blocks under concrete, all in the name of progress.
A year ago, fans of the Hurley were worried that this six-story fortress would not endure. The Baker administration had just announced it would divest the 327,000-square-foot building off Staniford Street and the 3.25 acres on which it sits, in a long-term lease arrangement for a massive redevelopment. The administration saw dollar signs: a potential windfall that could total in the tens of millions, or maybe in the hundreds of millions.
Developers would line up for this rare opportunity, a prime downtown location. The Hurley needs $200 million-plus in deferred repairs. Let the private sector take care of that by crafting a new, more modern home for the 675 office workers who used to go there every weekday before the COVID-19 pandemic, in return for maximizing the propertys development potential with a high-rise. Enlivening a walled-off, windswept stretch of Cambridge Street would be a bonus.
Sounds simple on paper. But this is Boston. History matters. Even recent history.
The nearly 50-year-old Hurley building arose out of a grand plan, envisioned by famed Brutalist-era architect Paul Rudolph: a Government Service Center complex that would mirror the contemporary concrete City Hall a couple of blocks away, but for state agencies. The Hurley meant to house labor and workforce offices and its twin, the Erich Lindemann Mental Health Center, were linked by a landscaped courtyard. The third piece, a 23-story tower, was never built; that corner of the plaza was eventually claimed for the Edward W. Brooke Courthouse. (The Lindemann is not part of this divestiture.)
Rudolphs disciples have rushed to preserve the Hurley, considered a signature feature of an important phase of institutional architecture one that some advocates prefer to call Heroic or concrete modernist instead of Brutalist. Rudolph was not considered to be the Hurleys lead architect. But as the propertys master planner, his acolytes say, his fingerprints are all over it. Two dueling Rudolph foundations have issued calls to save the building. On this topic, at least, they can agree.
The Paul Rudolph Foundation calls the late architects 1963 plan for the Government Service Center the most ambitious urban project to be realized by Rudolph in the United States. All existing elements should be preserved, the foundation said, but it welcomes a new tower at the site, similar to what Rudolph originally wanted. And the Paul Rudolph Heritage Foundation told state officials that tearing down the Hurley would partially unravel the urban fabric that is now part of Bostons unique history.
Preservation presents challenges to would-be developers: a dearth of windows on the Hurleys top level, a floor plate that does not line up evenly with Cambridge Street, a mental-health hospital next door that needs to share the block.
But because of its architectural significance, the Massachusetts Historical Commission has told the Baker administration that the Hurley building should be retained as the site gets redeveloped.
Its not as if Governor Charlie Bakers Division of Capital Asset Management and Maintenance started out certain that the place should be bulldozed, even if it seemed that way to some. However, a full demolition was once viewed as a more tenable option by the administration than it is today. The commercial real estate market, currently in a bit of an upheaval due to the pandemic, will have much to say about what the site looks like. DCAMM officials now say they no longer believe full demolition is a likely option. In its draft proposal, DCAMM emphasizes pursuing an adaptive reuse approach that respects the significance of the site while allowing for much-needed improvements.
Next up: a virtual public hearing on the plan to divest the Hurley, to be held on Dec. 17. The agency expects to issue a request for proposals to developers early next year, after getting a signoff from the states Asset Management Board, a panel of gubernatorial appointees.
The Baker administration has already heard the full range of opinions, from people who love the Hurley structure, with its corrugated concrete and distinctive terraces and columns, to those who see it as downright ugly, a blight. Kenzie Bok, a city councilor who represents the area, said she is less focused on the preservation debate and more on making sure developers are told to submit concepts that knit together the neighborhood and break up this super block. Her goal: to make it livelier and pedestrian-friendly, perhaps compensating for some of what was lost to urban renewal decades ago.
Greg Galer, executive director of the Boston Preservation Alliance, said he is glad that the Baker administrations stance has evolved over the past year. DCAMM, he said, seems to be trying to strike the right balance.
Historic preservation, Galer said, should not only be about saving structures deemed to be aesthetically pleasant. Its also about the stories these buildings tell about the era in which they were built, and their place in the patchwork quilt of an ever-changing city.
From that perspective, the Hurley will have many more tales to tell by the time this redevelopment saga finally ends.
Jon Chesto can be reached at jon.chesto@globe.com. Follow him on Twitter @jonchesto.
Visit link:
State officials make it clear: Redevelopment shouldnt lead to total demolition of Hurley building - BetaBoston
Category
Demolition | Comments Off on State officials make it clear: Redevelopment shouldnt lead to total demolition of Hurley building – BetaBoston
-
December 10, 2020 by
Mr HomeBuilder
EDIT: The permit in question is for 64 E. Concord Street and accessory structures outside of the main Orlando Sentinel. A permit has not been filed to remove the main building yet, at the time of this post.
An application for a permit has been filed with the City of Orlando to begin demolishing the former Orlando Sentinel campus.
Orlando Sentinel staff vacated the main building, located at 655 N. Orange Avenue[GMap], earlier in the year when its parent company made the announcement that it would abandon the building, along with the buildings that New York Daily News, Allentown Morning Call, and Capital Gazette also called home, forcing their staffs to work remotely in the interim.
The newspaper had been operated out of the building since 1951 but the property wassold to Miami-based developer Midtown Opportunitiesfor roughly $35.1 million. Midtown sued Tribune in June 2020 for three months of unpaid rent in the amount of $370,000, prior to them vacating the building.
An exact date for the demolition of the building has not been given at this time but the application was still open at the time of this posting and under review. Midtown intends to remove all buildings, foundations, dead trees, and shrubs, during the demolition. Parking lots will remain according to the application filed with the City.
The Adult Literacy League (Website) which had moved into the Orlando Sentinel building just months before the announcement was made that they were leaving the property, has since been forced to move to a new home at 2221 Lee Road [GMap] in Winter Park.
Editors Note: The Adult Literacy League is currently looking to onboard more students and has a waiting list of volunteer tutors looking to be matched with adult learners looking to learn how to read, write, and speak English. If youd like to learn or would like some help for yourself or someone you know, click HERE for more information.
More:
Application filed to begin demolition of former Orlando Sentinel buildings - Bungalower
Category
Demolition | Comments Off on Application filed to begin demolition of former Orlando Sentinel buildings – Bungalower
-
December 10, 2020 by
Mr HomeBuilder
GREENWICH Demolition of the Greenwich High School Cardinal Stadium bleachers has officially begun.
The tear down of the bleachers is the first step in a project to revamp the stadium that began with the formation of a feasibility committee in 2017. The scope of the project has been the subject of much debate and change during the time since, but construction is finally underway.
In a tweet on Tuesday, Superintendent of Schools Toni Jones posted a picture of the work and joked that she was doing a happy dance over the news.
Greenwich Public Schools is on our way to an updated Cardinal Stadium, Jones tweeted.
The Board of Estimate and Taxation released $4.6 million, in $1.9 million and $2.7 million blocks, to handle what is known as Phase 1A of what is to be a multi-phase project.
Phase 1A is to include construction of new bleachers on the home field side, a new press box, an elevator, new bathrooms, a new team room that will go underneath the new bleachers and other improvements.
Work on the team room and press box is slated to take place in the spring and summer, according to recent statements made to the BET.
Following this phase, Phase 1B is to include the creation of additional handicap parking spaces, a new entry kiosk and new lights on the existing poles. That work is still awaiting town approval before it can move forward.
Under Phase 2, which also needs town approval, a new access road from East Putnam Avenue has been proposed.
Russell Davidson, managing principal and president of Mount Kisco-based KG&D Architects, which is overseeing the project, told the Board of Education in November the current phase could be mostly complete by the end of the school year.
We should start to see the buildings under construction and foundations in January and February. The bleachers themselves will be erected in March and April, Davidson told the board at its Nov. 18 meeting.
Substantial completion is in the contract for graduation 2021. Were all excited about that, he said.
WGCH Radio Sports Director Rob Adams has logged more than 20 years broadcasting GHS football, Greenwich Youth Football League, lacrosse and soccer games from the press box that came down Tuesday.
It was a bittersweet day for him and other veterans of Greenwich sports coverage.
Im certainly excited for the future at Cardinal Stadium, Adams said on Tuesday. I cant wait to see what the finished new facilities look like and how WGCH and myself fit into that. But as I watched the video of the booth being pulled down this morning I felt a touch of sadness. That booth produced over 20 years of games and memories for me. I came of age as a play by play announcer in the booth at Cardinal Stadium.
But Greenwich deserves a better facility and I look forward to whats next.
Staff reporter Justin Papp contributed to this story.
See original here:
Demolition begins on long-awaited Cardinal Stadium project - CT Insider
Category
Demolition | Comments Off on Demolition begins on long-awaited Cardinal Stadium project – CT Insider
-
December 10, 2020 by
Mr HomeBuilder
LONDON--(BUSINESS WIRE)--The new Demolition market research report from SpendEdge indicates an incremental growth during the forecast period as the business impact of COVID-19 spreads.
As the markets recover, SpendEdge expects the Demolition market size to grow by USD 10 billion during the period 2020-2024.
Get detailed insights on the COVID-19 pandemic crisis and recovery analysis of the Demolition market. Download free report sample
Demolition Market Analysis
Analysis of the cost and volume drivers and supply market forecasts in various regions are offered in this Demolition research report. This market intelligence report also analyzes the top supply markets and the critical cost drivers that can aid buyers and suppliers devise a cost-effective category management strategy.
Insights Delivered into the Demolition Market
This market intelligence report on Demolition answers to all the critical problems faced by investors who seek cost-saving opportunities in a competitive market. It also offers actionable anecdotes on the industry structure and supply market forecasts including highlights of the top vendors in this market. Our procurement experts have determined effective category pricing strategies that are attuned to the dynamics of this market which can be leveraged to maximize revenue generation against minimum investments on the products.
Information on Latest Trends and Supply Chain Market Information Knowledge center on COVID-19 impact assessment
The reports help buyers understand:
This Demolition Market procurement research report offers coverage of:
For more information on the exact spend growth rate and yearly category spend, download a free sample.
This market intelligence report identifies the major costs incurred by suppliers and provides additional information on:
Click here to learn about report detailed analysis and insights on how you can leverage them to grow your business.
Notes:
Get access to regular sourcing and procurement insights to our digital procurement platform- Contact Us.
Table of Content
About SpendEdge:
SpendEdge shares your passion for driving sourcing and procurement excellence. We are the preferred procurement market intelligence partner for 120+ Fortune 500 firms and other leading companies across numerous industries. Our strength lies in delivering robust, real-time procurement market intelligence reports and solutions. To know more https://www.spendedge.com/request-for-demo
See the original post:
Demolition Market Procurement Report | Roadmap to Recovery for Businesses From the Impact of COVID-19 Pandemic | SpendEdge - Business Wire
Category
Demolition | Comments Off on Demolition Market Procurement Report | Roadmap to Recovery for Businesses From the Impact of COVID-19 Pandemic | SpendEdge – Business Wire
-
December 10, 2020 by
Mr HomeBuilder
When we last checked in on demolition at EPCOT, it was clear the old Innoventions West building was almost completely gutted. Meanwhile, refurbishment continues inside the Innoventions East and Electric Umbrella building, which is the future location of Starbucks and a new restaurant.
The interior of Innoventions East has been stripped down to the bare supports.
We can see straight through the Mouse Gear building, which is currently also being refurbished to give the store more windows for an open-air feel.
A contractor on a lift was working on the interior ceiling of the building.
Portions of the roof overhang will need to be fixed before construction is complete.
The walls have been removed from this section of Innoventions West.
We can now see all the way through the gutted building.
This temporary, T-shaped metal structure has been outfitted with lights, to shine on the adjacent Spaceship Earth now that the lights on the Innoventions building are out of commission.
Portions of the roof overhang have also been removed.
Several black tarps, which previously blocked demolition from view, have been removed from this end of Innoventions West.
From this angle, its clear just how many walls have been removed from the building, leaving only support pillars.
Refurbishment of Mouse Gear is largely blocked from view by the construction workers break room tents.
Eventually, thissection of the park will be the World Celebration neighborhood. A Festival Center may no longer be in the works, butEPCOT promises a new festival area.
Though its hard to know how plans have changed due to COVID-19, above is the original concept art for World Celebration, in which the Innoventions West building has been completely removed and replaced with a garden area and the Journey of Water Moana walkthrough attraction.
Are you looking forward to seeing what lies ahead for the historic transformation of EPCOT? Let us know in the comments below.
Related
Go here to see the original:
PHOTOS: Innoventions Demolition Fully Exposed at EPCOT with Even More Walls and Tarps Removed - wdwnt.com
Category
Demolition | Comments Off on PHOTOS: Innoventions Demolition Fully Exposed at EPCOT with Even More Walls and Tarps Removed – wdwnt.com
-
December 10, 2020 by
Mr HomeBuilder
National Review
As Democratic Senate Candidate Raphael Warnock tries to assure Jews that he is a friend, new video has surfaced of the Georgia Baptist preacher again linking Israel to apartheid.In the video, purportedly from a Palm Sunday sermon in 2015, Warnock also likened Israeli Prime Minister Benjamin Netanyahu to former segregationist Alabama governor George Wallace.Warnock made the statements shortly after the 2015 Israeli elections, won by Netanyahus Likud Party. On the final day of the campaign, Netanyahu announced his opposition to a two-state solution between Israel and Palestine, walking back previous support.In his sermon, Warnock described the Israeli and Palestinian region as a land of violence and bloodshed and occupation, and said he heard a very clever politician running for re-election as prime minister suddenly announce No two-state solution, he said.Thats tantamount to saying, occupation today, occupation tomorrow, occupation forever, Warnock said, using phrasing mirroring Wallaces racist call in 1963 for segregation now, segregation tomorrow, segregation forever.> During his 2015 Palm Sunday Sermon, Dem. Raphael Warnock explicitly called Israel an Apartheid State, describing it as a land of violence and bloodshed and occupation and he referred to Israeli leaders as clever politicians, and accusing them of being racist and vicious. pic.twitter.com/jfdkOUzung> > -- Caleb Hull (@CalebJHull) December 10, 2020Warnock urges his parishioners to consider the Middle East demographics. There are more Arabs in the region that Jews, he said. Without a two-state solution, the Jews in the region would need undemocratic apartheid-like policies, or risk being overwhelmed at the polls.The state will either be Jewish, or it will be a democracy, he said. It cant be both if you dont have a Palestinian state. You would have to have apartheid in Israel that denies other citizens, sisters and brothers, citizenship.Warnock also took aim at a statement Netanyahu made in the lead-up to voting when he warned that his right-wing government was in danger, and urged his supporters to vote because Arab voters are heading to polling stations in droves. Warnock described Netanyahus statement as kind of racist and vicious language.Warnock is one of two Democrats in Georgia trying to defeat Republican incumbents in a January runoff election. If both win, Democrats will take over the Senate.This wasnt the first time Warnocks past statements about Israel have come back to haunt him. Last year, Warnock was part of a group of African American church leaders who toured the Middle East and released a statement accusing Israel of engaging in tactics similar to those previously used by apartheid South Africa and communist East Germany patterns that seem to have been borrowed and perfected from other previous repressive regimes.In a 2018 sermon, after a Hamas terrorists stormed the Israeli border, Warnock accused the Israeli government of shooting down unarmed Palestinian sisters and brothers like birds of prey like they dont matter at all.As a Senate candidate, Warnock has attempted to walk back his apartheid allegations, and released a position paper asserting that he is a friend of Israel.I will stand with Israel and the Jewish people to protect their interests, advocate for the human dignity of the Palestinian people and their position in the world, promote peace, and ensure the U.S. remains economically strong, safe, and secure.
Originally posted here:
As efforts continue to find two missing workers, past incident involving demolition company back in focus - Yahoo News
Category
Demolition | Comments Off on As efforts continue to find two missing workers, past incident involving demolition company back in focus – Yahoo News
-
December 10, 2020 by
Mr HomeBuilder
Halifax officials have given notice to a local developer that they intend to revoke the company's demolition permit.
The move follows a stop-work order issued on Dec. 4 to Ardmore Hall Inc., operated by Stavros and George Giannoulis. The parent company is Mosaik Properties.
Crews began tearing down abuilding at the corner of North and Oxford streets, even though a tenant had not moved out of one of the units and was appealing his eviction.
The provincial minister responsible for the Residential Tenancy Board was surprised by the move.
"Honestly this is a very unusual situation," said Patricia Arab."But we have no control or authority over building demolition permits, that's up to HRM."
Coun. Shawn Clearysaid the situation shows more co-ordination is needed between the tenancy board and Halifax's planning and development department.
"We should have assurance from theResidential Tenancy Board that they've gone through an appropriate process before we grant a demolition permit because this kind of eviction by demolition should never, ever happen," said Cleary.
Neither the developers nor the legal aid lawyer for the tenant returned calls made by CBC News. Social media posts saidthe tenantlost all of their belongings due to the demolition.
"Given the housing crisis we are in, I hope this guy can find a new place by the holidays," said Cleary.
MORE TOP STORIES
Continued here:
Company's permit to tear down building to be revoked after 'eviction by demolition' - CBC.ca
Category
Demolition | Comments Off on Company’s permit to tear down building to be revoked after ‘eviction by demolition’ – CBC.ca
-
December 10, 2020 by
Mr HomeBuilder
The Grand Haven Board of Light & Power presented new drone photos of the former J.B. Sims power plant site on Harbor Island, which is currently being demolished, at last weeks meeting of the utilitys Board of Directors.
The photos were provided by the BLPs demolition contractor, who took them in preparation for the demolition of the two largest-standing buildings in the coming months.
Javascript is required for you to be able to read premium content. Please enable it in your browser settings.
kAm%96C6 😀 ?@ @77:4:2= 52E6 @7 6IA=@D:G6 56>@=:E:@? @7 E96 49:>?6J 2?5 @E96C 3F:=5:?8D[ 3FE :E 😀 6IA64E65 E@ 92AA6? 😕 =2E6 y2?F2CJ @C 62C=J u63CF2CJ a_a`]k^Am
kAm%96 A9@E@D AC@G:56 2 3:C5D6J6 G:6H @7 E96 56>@=:E:@? D:E6[ 7=@@5:?8 @? w2C3@C xD=2?5[ E96 6>AEJ 4@2= 4@>3FDE:@? C6D:5F2= E92E 92D J6E E@ 36 4=62C65 2?5 D@>6 ?2EFC2= 2C62D @? E96 :D=2?5]k^Am
kAm%96 4@2= J2C5 😀 DE:== 7=@@565 H:E9 2 76H :?496D @7 H2E6C] %96 q{! 92D 2== E96 4@2= C6>2:?:?8 A:=65 FA ?62C E96 3F:=5:?8D] |@DE 4@2= 92D 366? C6>@G65[ 244@C5:?8 E@ q{! v6?6C2= |2?286C s2G6 (2=E6CD]k^Am
kAm(2=E6CD 82G6 D@>6 4@?E6IE E@ E96 A9@E@D E@ E96 3@2C5]k^Am
kAmx E9:?< H92E E9:D A:4E@C:2= 8:G6D J@F :D 2 7FEFC:DE:4 =@@< @7 H92E E92E :D=2?5 :D AC@323=J 8@:?8 E@ =@@< =:<6[ 96 D2:5] %92E 2C62 E92ED 7=@@565[ E96 4@2= J2C5[ E92ED H96C6 H6 2C6 =@@<:?8 2E C6DE@C:?8 E92E 2C62 :?E@ H6E=2?5D]k^Am
kAms:C64E@C %@55 rCF> A@:?E65 @FE E96 C6465:?8 7=@@5:?8 @? w2C3@C xD=2?5]k^Am
kAm~? E96 7:CDE A:4EFC6[ x 42? D66 D@>6 @7 E96 3@2E =2F?49] %96 C2>A =@@
kAm(2=E6CD D2:5 H2E6C =6G6=D 92G6 C646565 7C@> C64@C5 9:89D 62C=:6C E9:D J62C] xED ?@E:4623=6 @? E96 36249 2?5 D@>6 DA@ED @? w2C3@C xD=2?5[ 96 D2:5]k^Am
The rest is here:
BLP provides drone photos of Harbor Island demolition site - Grand Haven Tribune
Category
Demolition | Comments Off on BLP provides drone photos of Harbor Island demolition site – Grand Haven Tribune
-
December 10, 2020 by
Mr HomeBuilder
05.12.2020 A seven axle All Terrain crane, a Liebherr from the Aguilar rental fleet, overturned in Spain on Friday after working on the demolition of a large steel and concrete cistern in the Madrid area, although this has not been confirmed. The crane, rigged with a short main boom and luffing jib, was supporting an element while it was cut free from the structure, however it turned out to be twice the estimated weight and took the crane over. Thankfully no one was hurt in the incident. The company posted a notice on social media which said: As many of you know, yesterday one of our machines suffered an accident and overturned. Luckily no one was injured it only involved material damage. Demolition work is very dangerous. The cause of the accident was a miscalculated cut, in this case the piece weighed almost twice as much as we were told, which led to the destabilisation and overturning of the crane.
We must reiterate that we are thankful that there has only been material damage and are grateful for the support shown by all of you. It is time to learn and continue working to prevent this from happening again. Click here to see the companys statement The incident was also caught on video which was also posted on social media: click here to see the video clip
Original post:
Demolition overload - Vertikal.net
Category
Demolition | Comments Off on Demolition overload – Vertikal.net
-
December 10, 2020 by
Mr HomeBuilder
DUBLIN--(BUSINESS WIRE)--The "Global Horticulture Lighting Market with COVID-19 Impact Analysis by Technology (Fluorescent, HID, LED), Application (Greenhouses, Vertical Farms, Indoor Farms), Cultivation, Lighting Type, Offering, Installation, and Region - Forecast to 2025" report has been added to ResearchAndMarkets.com's offering.
The global horticulture lighting market is projected to grow from USD 2.3 billion in 2020 to USD 6 billion by 2025; it is expected to grow at a CAGR of 21.4% from 2020 to 2025.
The market has a promising growth potential due to several factors, including the technological advancements in LED technology, rising number of government initiatives to promote the adoption of CEA practices, growing demand for food owing to the continuously increasing population, and ongoing legalization of cannabis cultivation. Moreover, increasing the adoption of CEA facilities to meet the growing demand for fresh produce due to COVID-19, and increasing awareness regarding benefits provided by LED technology to grow crops through the year amid the COVID-19 pandemic could play a key role in driving the growth of the horticulture lighting market.
Rising penetration of LED lights in indoor farming due to their long lifespan, spectrum adjustability, and energy efficiency
The LED technology segment is projected to grow at the highest CAGR from 2020 to 2025 for horticulture lighting market, by technology. Energy efficiency continues to be a key factor for the adoption of LED technology in the horticulture sector, along with additional benefits in the form of low heat, long lifespan, light weight, and enhanced controllability. This is expected to boost their adoption across various applications during the forecast period.
Fruits and vegetables is estimated to hold the largest share of the market during forecast period
The fruits and vegetables segment is projected to account for the largest size of the horticulture lighting market from 2020 to 2025, by cultivation. Increasing demand for quick and fresh horticultural produce owing to population growth and loss of arable land is a key factor driving the growth of this segment of the market. The surging number of vertical farms and greenhouses is also expected to contribute to the growth of this segment of the market.
APAC is projected to become the fastest geographical market between 2020 and 2025
APAC is projected to grow at the highest CAGR for horticulture lighting market during the forecast period. The growth of the market in this region can be attributed to its continuously increasing population, which leads to rising demand for food from APAC. This has led to an increase in the adoption of advanced farming technologies such as CEA to enable the supply of fresh fruits and vegetables throughout the year. Moreover, high pressure on cultivators to improve agricultural yields with limited available resources and increased requirements to protect crops from unexpected climatic changes are also contributing to the adoption of horticulture lighting in APAC during the forecast period.
Market Dynamics
Drivers
Restraints
Opportunities
Challenges
Companies Mentioned
For more information about this report visit https://www.researchandmarkets.com/r/m9p0un
Original post:
Global Horticulture Lighting Market (2020 to 2025) - Promising Trend of Farm-to-Table Concept Presents Opportunities - ResearchAndMarkets.com -...
Category
Indoor Lighting | Comments Off on Global Horticulture Lighting Market (2020 to 2025) – Promising Trend of Farm-to-Table Concept Presents Opportunities – ResearchAndMarkets.com -…
« old Postsnew Posts »