Categorys
Pages
Linkpartner

    Home Builder Developer - Interior Renovation and Design



    Page 11,955«..1020..11,95411,95511,95611,957..11,96011,970..»



    Demolition on US-24 bridge underway

    - July 2, 2013 by Mr HomeBuilder

    Demolition of the N.W. US-24 highway bridge began Sunday and will continue through Wednesdays daylight hours.

    Crews at the US-24 and N.W. Topeka Boulevard exchange started the demolition project by working on taking out the approach pavement near the bridge Sunday. By Monday afternoon, workers were using multiple excavators and a convoy of dump trucks to pull up about 500 feet of concrete on either side of the bridge. The construction site was loud and dusty with all of the large equipment, concrete dust and passing traffic.

    Workers also had started to form a dirt bed underneath the bridge to act as a cushion for concrete falling from overhead. The crews will be working on the demolition from 7 a.m. to 7 p.m. each day until the bridge is demolished.

    This demolition starts the second phase of the overall project for the Kansas Department of Transportation.

    As with any change or phase change there is a lot of new work to be done, said KDOT spokeswoman Kimberly Qualls. We look at traffic changes and work with the city on a variety of things to make sure we have the best possible solution for the situation. Each change has a different set of circumstances, and despite planning, you cant always anticipate what drivers will do.

    Rather than using implosions to take down the bridge, KDOT will be demolishing the bridge by using excavators with jackhammer attachments.

    Although it is typical for bridges to be demolished via implosions, Qualls said Monday that implosions werent a viable option in this scenario.

    This is a heavily trafficked corridor, and there are a lot of businesses around this exchange, Qualls said. The area is so small and concise, and the bridge is small enough that implosions really werent necessary.

    The US-24 and N.W. Topeka exchange opened in 1941 as the first cloverleaf exchange in Kansas at a price of $168,500. Today, the project that calls for the replacement of the bridge, resurfacing the interchange ramps and adding new pavement on either side of the bridge will cost $2.3 million. The contractor for the project is RA Knapp Construction, of Kansas City, Kan.

    Both eastbound and westbound traffic on US-24 will be reduced to one lane in each direction on the bypass routes through late September, and the zone will post a 35-mph speed limit and a 14-foot wide lane restriction.

    Originally posted here:
    Demolition on US-24 bridge underway

    Love’s Dry Carpet Cleaning In Fairfield Vacaville CA (707) 469-3791 – Video

    - July 2, 2013 by Mr HomeBuilder


    Love #39;s Dry Carpet Cleaning In Fairfield Vacaville CA (707) 469-3791
    If you are looking for a better way to clean your carpets, then Love #39;s Dry Carpet Cleaning is the company you have been looking for Love #39;s Dry Carpet Cleanin...

    By: Strongdry1

    Read more:
    Love's Dry Carpet Cleaning In Fairfield Vacaville CA (707) 469-3791 - Video

    Carpet Cleaning Esparto and Winters CA | (707) 469-3791 Carpet Cleaner – Video

    - July 2, 2013 by Mr HomeBuilder


    Carpet Cleaning Esparto and Winters CA | (707) 469-3791 Carpet Cleaner
    Created using http://studio.stupeflix.com/?yt=1.

    By: Strongdry1

    The rest is here:
    Carpet Cleaning Esparto and Winters CA | (707) 469-3791 Carpet Cleaner - Video

    Carpet Cleaning Videos Featuring Rug Doctor – Video

    - July 2, 2013 by Mr HomeBuilder


    Carpet Cleaning Videos Featuring Rug Doctor

    By: Joe Wheeler

    More:
    Carpet Cleaning Videos Featuring Rug Doctor - Video

    Boston, MA Replacement Windows, Siding, Decks – Budget Windows of Boston – Video

    - July 2, 2013 by Mr HomeBuilder


    Boston, MA Replacement Windows, Siding, Decks - Budget Windows of Boston
    Boston, MA Replacement Windows, Vinyl Siding Installation and Deck Building. Call Budget Windows of Boston at (781) 816-7141 if you #39;re looking for good optio...

    By: BudgetWindowsBoston

    Here is the original post:
    Boston, MA Replacement Windows, Siding, Decks - Budget Windows of Boston - Video

    Kaijudo 1 Year Anniversary Match 1 TVR Decks – Video

    - July 2, 2013 by Mr HomeBuilder


    Kaijudo 1 Year Anniversary Match 1 TVR Decks
    Chris and Eman duking it out with the classic TVR decks. Hope you enjoy! Happy 1 year Kaijudo!

    By: TCGWise123

    Follow this link:
    Kaijudo 1 Year Anniversary Match 1 TVR Decks - Video

    Kaijudo 1 Year Anniversary Match 2 TVR Decks – Video

    - July 2, 2013 by Mr HomeBuilder


    Kaijudo 1 Year Anniversary Match 2 TVR Decks

    By: TCGWise123

    Go here to read the rest:
    Kaijudo 1 Year Anniversary Match 2 TVR Decks - Video

    Audio Injection – Tracktor Decks Techno Sample Pack – Video

    - July 2, 2013 by Mr HomeBuilder


    Audio Injection - Tracktor Decks Techno Sample Pack
    Get it @ http://www.loopmasters.com/product/details/1937/Audio-Injection-Traktor-Decks-Techno http://producerloops.com/product.php?productid=25659 Get ya lap...

    By: Industrial Strength Records

    Read more:
    Audio Injection - Tracktor Decks Techno Sample Pack - Video

    New city budget includes keeping downtown decks clean

    - July 2, 2013 by Mr HomeBuilder

    Published: Monday, July 1, 2013 at 12:19 p.m. Last Modified: Monday, July 1, 2013 at 12:19 p.m.

    Keeping the city's decks presentable can be a daily battle, yet Councilwoman Laura Padgett wants crews to fight harder.

    The city decks can be disgusting, Padgett said at a June 17 council meeting. She had attended a formal event at the Wilmington Convention Center and was disappointed in the cleanliness of the deck next door.

    "The other decks remain dirty and smelly a good part of the time, too," she said.

    While some agree that the decks could be cleaner, not everyone agrees that cleanliness is a problem.

    Keeping decks clean

    The city is preparing to hire a contractor to pressure wash the city's decks from top to bottom for the first time in four years.

    Due to budget cuts, the decks were last power washed in the summer of 2009, said Betty Gurganus, the city's parking manager.

    This year's city budget includes a 14 percent increase in parking operating expenses to cover the costs for pressure washing, along with painting work and purchasing trash cans and cigarette butt urns.

    The city pays Lanier Parking to manage and operate its downtown decks, and Lanier crews are tasked with the everyday cleaning. Every morning, crews walk through the decks, when they assess what will need to be addressed that day, such as graffiti or a broken light. They clean up any bodily fluids right away and sweep daily.

    Excerpt from:
    New city budget includes keeping downtown decks clean

    Bathroom Remodeling Morgan Hill CA – (408) 532-5232 – Video

    - July 2, 2013 by Mr HomeBuilder


    Bathroom Remodeling Morgan Hill CA - (408) 532-5232
    Bathroom Remodeling Morgan Hill CA - (408) 532-5232 http://www.youtube.com/watch?v=YYaErPYC_rs Our Services: Bathroom Design Morgan Hill CA Bathroom Fixtures...

    By: sanjosecontractor136

    See the article here:
    Bathroom Remodeling Morgan Hill CA - (408) 532-5232 - Video

    « old Postsnew Posts »ogtzuq

    Page 11,955«..1020..11,95411,95511,95611,957..11,96011,970..»


    Recent Posts