Categorys
Pages
Linkpartner

    Home Builder Developer - Interior Renovation and Design



    Page 14,529«..1020..14,52814,52914,53014,531..14,54014,550..»



    Summit Cabinet Coatings Completes Major Locker Room Renovation for Fort Collins Club, Refacing Cabinets in Timely Manner

    - October 2, 2012 by Mr HomeBuilder

    FORT COLLINS, CO--(Marketwire - Oct 1, 2012) - Summit Cabinet Coatings of Fort Collins, Colorado just completed a major, commercial renovation on the Fort Collins Club that involved remodeling and refacing cabinets in the locker rooms. Although Summit Cabinet Coatings specializes in home kitchen remodel projects, the company is also available for commercial ventures, such as apartment complexes and hotels.

    A representative from the Fort Collins Club says, "The Fort Collins Club is pleased with the outcome of our new and improved locker rooms! It's always a challenge going through renovations and changes. Summit Cabinet Coating did an outstanding job and completed our lockers in an efficient and productive manner, which allowed our Club to get back to business as usual."

    Summit Cabinet Coatings performed the remodel the men's and women's locker rooms. The remodel began August 3 and finished August 27, 2012. Thanks to Fort Collins Club's and Summit Cabinet Coatings' superior planning, they only had to spend time refacing cabinets in one locker bay per room a week and the locker rooms could stay open for the majority of the remodel process. This and other steps took place to cut down on the cabinet refacing cost for Fort Collins Club.

    The doors in the locker room were in rough condition from years of hard use and contact with wet towels and swimsuits, gym bags and padlocks. Summit Cabinet Coatings spent time repairing dozens of huge gouges and filling irregular grain on every door to achieve its standard satin smooth finish.All 630 doors went through the same cabinet resurfacing process.

    The Club did a trial run before commissioning Summit Cabinet Coatings and placed a sample resurfaced door in a high traffic area with padlocks beating against it for three months. The test was meant to prevent unnecessary cabinet refacing cost for the Fort Collins Club, should the resurfaced doors not be able to handle commercial wear and tear. The finish passed the test with flying colors. If the finishes provided by Summit Cabinet Coatings can take a fitness club's level of abuse, they will certainly do well in a residence.

    Summit Cabinet Coatings performs home and commercial projects including refacing cabinets, kitchen remodels and a myriad of other woodworking jobs. Their goal is to keep the projects as non-invasive as possible for home owners, as they can still use their kitchen while their team is at work. For commercial applications, this is especially important so that they may keep the cabinet refacing cost low.

    Summit Cabinet Coatings is Fort Collins and northern Colorado's premier choice for kitchen remodels in all price ranges. For more information about Summit Cabinet Coatings, or to receive a bid on your commercial remodel or home cabinet refacing cost, visit http://www.summitcabinetcoatings.com or call (970) 282-9856.

    Read the rest here:
    Summit Cabinet Coatings Completes Major Locker Room Renovation for Fort Collins Club, Refacing Cabinets in Timely Manner

    Aerosmith VersaPins Available at Nail Gun Depot

    - October 2, 2012 by Mr HomeBuilder

    Cincinnati Ohio - Nail Gun Depot is extremely excited to rollout the full line of Aerosmith VersaPins. These hardened pins are the ultimate solution for 16-18 gauge steel applications. Save time over screws, powder actuated and other time consuming installation methods. The speed of a pneumatic nail gun makes attaching gypsum board, Hardie siding and lath to steel easier than ever. These ballistic point steel pins are designed to quickly and cleanly penetrate the steel allowing it to rebound back around the fastener to provide the maximum holding power available. Versa Pins are made with special grades of steel that are hardened with a unique heat treating process making them ductile and extremely strong. Aerosmith steel pins are proudly manufactured in the USA. VersaPins are compatible with a wide variety of industry leading tool manufacturers including MAX, Aerosmith, Senco, Bostitch, Hitachi and many others. VersaPin fasteners lengths range from 1" to 2-1/2" in length. Fully compliant and approved for use by James Hardie and multiple International Building Code sections including ESR-3145, ER-5667, and ESR-1641. These Aerosmith hardened pins are excellent for attaching perma-lath, stucco, gypsum board, Hardie board, plywood, OSB and much more to cold formed steel.

    Nail Gun Depot has manufacturer direct trained staff on hand to help with any technical or installations questions or concerns. Feel free to contact us at 888-720-7892 or via our online chat at http://www.nailgundepot.com.

    Beth Moore CG Media, Inc. Representing the Thomas Industrial Network Internet Marketing Solutions for Industrial Companies Websites, Search Engine Marketing, Social Media, E-mail Marketing, PR http://www.ThomasNet.com, http://www.News.ThomasNet.com 513-314-4708 cell 513-761-9073 office 513-761-2182 fax

    Pivot Point, Inc. Designer & manufacturer of standard and custom non-threaded fasteners. Various products include ... more

    Double HH Manufacturing Manufacturer of pins, fasteners & hardware items. Pins produced include steel hitch pins, clevis ... more

    J & J Swiss Precision, Inc. Custom manufacturer of precision machined parts. Available in brass, steel, aluminum, copper, ... more

    Pin-Key Mfg. Co. Manufacturers of drive pins, pinch pins, standard pins, special pins from .011-.198 & machine keys, ... more

    Keystone Automatic Technology Inc. ISO 9001:2008 certified manufacturer of standard & custom precision parts including screws, nails, ... more

    Precision Punch Corp. ISO 9001:2000 & ISO 13485 certified manufacturer of standard & custom punches, dies, perforators & ... more

    Read more from the original source:
    Aerosmith VersaPins Available at Nail Gun Depot

    Del Frisco's steakhouse coming to Chestnut Hill Mall

    - October 2, 2012 by Mr HomeBuilder

    Del Frisco's has just signed a lease at the Chestnut Hill Shopping Center, joining recent restaurant additions Davios, Shake Shack, and Bernard's. An upscale steak house, Del Frisco's serves hand-cut aged USDA Prime beef and seafood, and features an extensive wine list and a full-bar.

    "We've been focused on finding the right mix of high-quality food operators to serve this dense, high-income market," said Mark Roberts, SVP of Leasing at WS Development. "Del Frisco's is expert at catering to the refined, well-traveled customer. We're excited to welcome Del Frisco's to Chestnut Hill."

    Del Frisco's Grille will be located on the second level of WS Development's corporate headquarters building, overlooking scenic Hammond Pond. It will be part of a new 64,000-square-foot, three-story building located at the center of the project.

    In addition to Davios, Bernards and Shake Shack, Del Frisco's joins other newly signed tenants including Showcase Super Lux, The Sports Club/LA, lululemon, Pottery Barn, Polarn O. Pyret, Polka Dog Bakery, and Treat Cupcake Bar.

    Located along Route 9 in the heart of Chestnut Hill, the Chestnut Hill Shopping Center enjoys nearly a half-mile of street frontage. When the current redevelopment is complete, the center will expand to 406,000-square-feet of first-class retail and restaurants.

    For more information, visit http://www.chestnuthillshoppingcenter.com.

    Go here to see the original:
    Del Frisco's steakhouse coming to Chestnut Hill Mall

    REVIEW: Cave Story Review

    - October 2, 2012 by Mr HomeBuilder

    One of the best games in the past decade gets an even better 3DS release.

    Cave Story, available as a 3DS eShop title, is the third version of the game to appear on Nintendo handhelds. The first was a DSiWare release of the original version of the game, and the second was the 2011 3D retail release. Both earlier versions of the game had their merits, but at this point, theyre just about worthless because Cave Story on the eShop is the definitive version (at least until they do some other re-release).

    For the uninitiated, Cave Story was originally a freeware game made by Daisuke Pixel Amaya in 2004. It was beloved, and eventually Nicalis remade it for WiiWare and DSiWare in 2010. In 2011, Nicalis remade the game with 3D character models for a retail 3DS release and also released Cave Story+ on Steam, the latter of which is the basis for this new 3DS eShop release.

    The game itself is comparable to seminal 2D works such as Metroid, though its story is a little more guided than that games. The hero has a variety of guns he can wield, and you learn a lot of fun combat and traversal tricks as you progress. The game features multiple endings, branching paths, and delightful 2D platforming gameplay. For anyone who has any interest in 2D platformers, you should have played this; if you havent, what are you waiting for?

    On the eShop, Cave Story features the original versions graphics and music, but retains all the content (including the Wind Fortress and Curly Story) of the Cave Story+ Steam release. A few more additions sweeten the pot, including optional widescreen graphics, customizable controls, and wonderful stereoscopic 3D backgrounds. Still, there isnt really anything new or unique to this version outside of some bells and whistles.

    The use of 3D is masterful, as there are multiple layers of depth that make the simplistic 2D game look full of life. It might not add anything to the gameplay, but the 3D straight up makes Cave Story a better experience. The widescreen graphics, which fill out the top screen, are similarly effective.

    Even without any additions, Cave Story is still the same amazing game people have raved about for eight years. Its one of the best 2D platformers in recent memory, and this version is worthwhile if youve never played it before or are itching for a reason to play it again.

    The rest is here:
    REVIEW: Cave Story Review

    NJ Remodeling Contractor Somerville Aluminum Debuts Infomercial and Introduces New Kitchen and Bath Designer

    - October 2, 2012 by Mr HomeBuilder

    Somerville, NJ (PRWEB) October 01, 2012

    Somerville Aluminum has been remodeling homes throughout New Jersey for over sixty years. The remodeling company of choice for generations of homeowners, Somerville Aluminum has grown on the foundation that total customer satisfaction is the primary focus that drives success. To that end, Somerville Aluminum recently launched an infomercial that speaks about why the customer experience is so important to the team at Somerville Aluminum and what homeowners can expect when working with them.

    The customer experience starts when we first pick up the phone, states Gary Shiman, co-owner of Somerville Aluminum. Most clients are overwhelmed at the beginning of a remodeling project. Our team and process will ease homeowners anxiety. We walk our customers through the entire process from start to finish.

    Shiman, along with brother-in-law and fellow co-owner, David Gropper, navigate viewers through the importance of offering value, respect, dedication and a reliable timetable when working with their customers.

    The infomercial introduces viewers to some very passionate testimonials by Somerville Aluminum customers who explain how Somerville Aluminum has gone beyond their expectations with their honesty, reliability and craftsmanship.

    Somerville Aluminum started as a storm window company. Their dedication to their customers and their employees while keeping the same message across the board for so many years has enabled them to grow and sustain longevity. They note that while their products and processes have changed over the years, their core values and commitment to customers have not.

    Comcast subscribers can view the infomercial on the Home and Garden Channel, 888; while Cablevision customers can view it on channels 603 and 609.

    A new Kitchen and Bath Designer joins the team.

    Somerville Aluminum has added a new kitchen and bath designer to their staff. Andrea Macri, a NCIDQ licensed and trained interior designer will be available to help customers navigate through the many options and selections necessary when undertaking a home remodeling project. Andrea brings a wealth of design knowledge and expertise gained while designing hotels, resorts, restaurants and spas, as well as kitchens and baths all over New Jersey. Once the go-to interior designer for the Marriott Corporation, Somerville Aluminum is eager for Andrea to lend her touch to customers, while providing them with a level of trust and comfort important for the overall experience.

    Go with the Pro: For over 60 years, Somerville Aluminum has been a fixture on Main Street in downtown Somerville, NJ. With customer satisfaction as their focus, Somerville Aluminum is the areas largest full service home remodeling company and has built a reputation for reliability, expertise and trust with their core family values lacing through three generations of service to Central Jersey homeowners. The certified staff and design team practices and promotes a green home and way of life, are lead certified, and partners only with vendors providing the same exceptional quality and service their customers have come to expect. Recently named Best of the Best in Central Jersey, Brothers-in-law Gary Shiman and David Gropper approach each day and each job with their customers as their number one priority and strive to assure them that their home is in good hands.

    Read this article:
    NJ Remodeling Contractor Somerville Aluminum Debuts Infomercial and Introduces New Kitchen and Bath Designer

    Research Forest Lakeside taking shape

    - October 2, 2012 by Mr HomeBuilder

    THE WOODLANDS The development of Research Forest Lakeside is moving along with Building 4 and a parking garage well under construction on the 77-acre site.

    Warmack Investments is developing Research Forest Lakeside, a project that will consist of 11 Class A office buildings situated along the banks of Lake Woodlands for a total of 1.9 million square feet in office space. Also included on the site will be 36,000 square feet of retail space on the corner of Research Forest Drive and Lakeside Boulevard.

    Building 4, James Warmack said, will be 12-story Class A office building with 300,000 square feet.

    (The interior) is a combination of granite, limestone, glass and wood, he said. It will be very elegant.

    The Woodlands-based Talisman Energy, which occupies Building 2, will move into the top six floors of Building 4 when it is complete, Warmack said. As for the rest of the building, he has not inked any leases but has had a great deal of interest in the space. The building is expected to be ready for move-in around May 2013.

    Im very happy with the level of interest, he said. I dont think we will have any issues getting these buildings leased out.

    The campus already is home to two Aon Hewitt buildings (1 and 3).

    According to Warmack, his Colorado Springs, Colo.-based company acquired the property when it bought Hewitts real estate portfolio in 2005.

    Construction on Building 5 will begin in March 2013 and will be eight stories with 200,000 square feet of office space. According to Warmack, Repsol USA will occupy the entire building.

    Buildings 4, 5 and the seven-story parking garage will all be centered around a halo that will allow people to walk from the garage to the buildings under a covered walkway.

    Read the original post:
    Research Forest Lakeside taking shape

    McDermott Cuts Ribbon on New Washington, D.C. Office Building

    - October 2, 2012 by Mr HomeBuilder

    WASHINGTON--(BUSINESS WIRE)--

    McDermott Will & Emery today became one of the first international law firms to locate its office on Capitol Hill as it officially opened the doors of its new buildingat 500 North Capitol Street. Moving from its prior address downtown to its newhome near Union Station, the Firm became the primary occupant of the new McDermott Building at the corner of North Capitol Street and E Street, N.W.

    The new 229,112 square-foot McDermott Building will be home to over 400 D.C.-based lawyers and staff as well as other business and retail outlets. It strategically places McDermott lawyers within steps of the U.S. Congress, the Supreme Court, the Securities and Exchange Commission, the Federal Trade Commission Annex, the Tax Court, the Federal Energy Regulatory Commission, the Thurgood Marshall Judicial Center Complex, the Library of Congress and Union Station.

    The new building also represents one of the largest private sector real estate projects completed in Washington this year. As part of the opening, James C. Dinegar, CAE, President and CEO of the Greater Washington Board of Trade, will join McDermott officials for the ribbon-cutting ceremony. Earlier this year, the McDermott Building was named by the Washington Business Journal as the winner of its Urban Office Lease Award.

    It is a real pleasure to see all our hard work come to fruition with what is now one of the premier addresses on Capitol Hill, said Bobby R. Burchfield, co-partner-in-charge of McDermotts Washington, office. A project of this scale and magnitude could not have been accomplished without exceptional teamwork. We thank everyone who has been involved in planning this relocation over the past couple of years. Their dedication to this project has allowed our vision for the future of McDermott in Washington to finally come to life.

    Originally built in 1966, the building has been completely redesigned and redeveloped to meet the current and future needs of McDermott. Building upgrades include state-of-the-art technology, such as new mechanical and electrical systems, elevators, and an entirely new, glass faade. Built to meet the U.S. Green Building Councils LEED Gold standards for energy efficiency and environmental sustainability, the space features abundant natural light, Energy Star-rated equipment and appliances, new furniture with recycled components, and locally sourced building materials. The office also offers a top-floor conference center, a rooftop terrace with panoramic views of Capitol Hill, an on-site parking garage and prominent exterior signage to reinforce the McDermott brand.

    With this move, McDermott becomes one of the first international law firms to be based on Capitol Hill, said Paul Thompson, co-partner-in-charge of McDermotts Washington office. We believe we are on the cusp of a natural evolution as major law firms and large corporations take a closer look at their local real estate investments. McDermott is bullish onthe growth of Capitol Hill as a business district,an important shift weexpect to play out over the coming years.

    Since its opening in 1978 with two lawyers, McDermotts Washington, D.C., office has become a broad ranging practice comprising 209 attorneys. Originally known for representing clients before government agencies, congressional committees, the executive branch, the legislative branch, and before federal and state courts, McDermotts Washington, D.C. lawyers now advise clients on matters ranging from corporate mergers and acquisitions to intellectual property litigation and protection, regulatory issues, employee benefits, white collar and securities defense, tax and other areas. The Firm services clients in a broad spectrum of industries that include among others, multinational corporations, government and political institutions, environmental agencies, international organizations and high technology companies.

    Guiding the complete renovation was Boston Properties Executive Vice President Raymond Ritchie, who in partnership with Clark Enterprises, first saw that the site had potential beyond its original construction. McDermott Will & Emery LLP was represented by Lois Zambo and Steve London of Studley, a global real estate advisory firm. Boston Properties and Clark Enterprises were represented by Art Santry, Phillip Thomas, Zeke Dodson and Kerri Mulligan-Salih of Cassidy Turley. The Clark Construction Group performed the base building renovation as well as the tenant improvements and Gensler was the architect for both phases of the project.

    About McDermott Will & Emery

    See the article here:
    McDermott Cuts Ribbon on New Washington, D.C. Office Building

    Public input wanted on Fort Washington Way decks

    - October 1, 2012 by Mr HomeBuilder

    CINCINNATI, OH (FOX19) -

    Connecting the downtown business district with The Banks could be a reality sooner than later.

    The City of Cincinnati is hoping to install decks over Fort Washington Way between Elm Street and Main Street for the development. The city, along with non-profit and corporate support is announcing a national design competition, "Connect the Blocks," to establish a vision for the decks over Fort Washington Way.

    A grocery store, skate board park and music amphitheatre are just some of the ideas generated by the public to transform Ft. Washington Way between the downtown business district and the Banks.

    Elizabeth Wetzel is a project coordinator for the city manager's office, her job is to find the vision for the project and get the public's feedback.

    "People had some really constructive and creative ideas, there was definitely some things to consider," said Wetzel. "All kinds of things that would draw younger people, kind of the 14-22 demographic, like a skate park, soccer field other recreational activities."

    The pile foundations for the decks were originally constructed during the improvements made to Fort Washington Way in the early 2000s, through a $10 million investment from the City of Cincinnati, Hamilton County, and private investors. Now, the City seeks to develop on those foundations.

    In a press release, City Manager Milton Dohoney says a vision must first been created, then the city can move forward.

    "The Banks is well underway, downtown is growing, and now we must begin thinking about what we as a community want to see over Fort Washington Way to connect downtown and the riverfront," said Dohoney.

    The City will conduct a Call for Entries in a national design competition for design, architectural, and engineering experts to create design concepts and cost estimates for the decks over Fort Washington Way between Elm Street and Main Street. Local professionals will act as judges in the competition. Monetary stipends will be awarded to between three and five finalists to further refine their designs.

    More here:
    Public input wanted on Fort Washington Way decks

    Construction to close section of S. Lieser Road

    - October 1, 2012 by Mr HomeBuilder

    Monday, September 24, 2012

    Construction crews will close a section of South Lieser Road in Vancouver on Tuesday, according to the citys public works department. The closure will allow workers to install new public sewer lines.

    The work will close Lieser between St. Helens Avenue and Southeast Middle Way, from 7 a.m. to 6 p.m. Tuesday, according to the city. Detour signs will help direct traffic around the closure.

    The installation is part of a Linwood Heights project through Vancouvers Sewer Connection Incentive Program, which aims to make public sewers available to residents now connected to private septic systems. The city hired contractor RC Northwest Inc. of Brush Prairie for the job.

    Commuters are encouraged to avoid the area if possible on Tuesday, as delays are possible. Drivers who pass through nearby neighborhood streets should use caution, according to the city.

    You must be logged in to rate this.

    Current Rating : Nobody has rated this article yet.

    Sign up to receive email and/or text alerts from us whenever someone or something of interest appears on columbian.com. For example, if you follow the Blazers, you could enter LaMarcus Aldridge and we'd send you a link to our stories whenever he is mentioned in them. You just enter the person's name or other search terms, i.e., light rail or Vancouver crime, and then click Submit to sign up to receive updates. Note: Keep in mind that carrier charges may apply for SMS updates.

    Choose a term below or enter in your own for you to automatically receive alerts when we post something new.

    See the original post:
    Construction to close section of S. Lieser Road

    Sangre Chronicle > Angel Fire > Family drops suit over inoperable Angel Fire sewer

    - October 1, 2012 by Mr HomeBuilder

    A family that owns property in Angel Fire has dropped a lawsuit it filed against the village of Angel Fire earlier this year for allegedly requiring the family to spend money to connect to an inoperable sewer system.

    Rush Family Limited Partnership No. 2 filed the lawsuit in the Eighth Judicial District Court in Raton May 22 and dismissed the complaint Aug. 30.

    Plaintiff no longer wishes to pursue this matter against defendant and gives notice of its voluntary dismissal with prejudice, the notice of dismissal states.

    Angel Fire Mayor Barbara Cottam would not say whether the village planned to settle the lawsuit out of court. She directed questions about the lawsuit to the villages attorney Joseph F. Canepa of Canepa and Vidal, PA in Santa Fe, who did not immediately respond to a telephone message from the Sangre de Cristo Chronicle Tuesday (Sept. 11).

    The Rush familys complaint alleges that on Aug. 21, 2009, the village issued a statement indicating that sewer service was available at the familys residential lot at 44 Beaver Loop in the Valley of the Utes subdivision. From September 2009 to June 2011, it states, the village billed the family for sewer availability.

    On Jan. 27, 2010, the complaint states, the village issued a memorandum stating that the family would be required to install a grinder pump and other equipment to accommodate the municipal sewer utility. The memorandum stated that the family must use the municipal sewer system to manage liquid waste from the Beaver Loop home.

    Plaintiff justifiably relied on Defendants series of negligent misrepresentations and proceeded to design and placed the house on the lot without consideration of locating a gravity septic system, the complaint states. Instead Plaintiff installed the specific sewage treatment system that would connect to the Defendants municipal sewage utility and thereafter completed landscaping on the surface of the lot.

    But after the home was built, the complaint states, the village issued a letter in the spring of 2011 stating that the house could not be connected to the municipal sewage system. The family was then forced to remove landscaping, install a pump-operated septic system uphill from the house, and re-landscape the scarring left by the installation process, it states.

    Plaintiff unnecessarily spent time and money installing a sewage system and line to connect to the nonexistent sewer line of the village, the complaint states.

    The complaint states that the Rush family was seeking monetary damages to be determined at trial, including compensatory and consequential damages, statutory damages, and such other relief deemed proper by the court.

    Read the original post:
    Sangre Chronicle > Angel Fire > Family drops suit over inoperable Angel Fire sewer

    « old Postsnew Posts »ogtzuq

    Page 14,529«..1020..14,52814,52914,53014,531..14,54014,550..»


    Recent Posts