Home Builder Developer - Interior Renovation and Design
-
June 21, 2012 by
Mr HomeBuilder
SARATOGA SPRINGS At Putnam Market, cheese is revered in fact, it even has its own climate-controlled room.
The gourmet market on Broadway recently completed construction of a special cheese room, a glass-enclosed tasting space designed to maintain an optimal temperature and humidity for the stores wide variety of cheese.
The key thing for me is that it was designed for our customers, said Cathy Hamilton, co-owner of the store.
The display of cheese wheels and slices behind thermal-glass walls looks almost like an exhibition, but Hamilton welcomes shoppers through the glass door to interact with the merchandise.
Its not a cheese museum. Its a cheese-tasting space, she said, cutting a thin slice of Parrano a Gouda with a mild Parmesan-like flavor for sampling.
With a temperature between 50 and 55 degrees, the cheese room might be the coolest spot in the Spa City.
It opened just in time for summer. You can come in here and stand in a refrigerated room and actually taste stuff, Hamilton said.
Experienced staff members brave the chill to provide customers with samples of choices like Brie de Meaux sometimes call the king of cheeses or Manchego a firm cheese with a buttery texture made from sheeps milk.
From Midnight Moon to PsycheDILLic, the inventory is meant to be enticing.
Its a process for people. They can actually get involved, and the staff makes it more enjoyable, Hamilton said.
See the original post here:
Putnam Market becomes the big cheese in Saratoga Springs
Category
Room Remodeling | Comments Off on Putnam Market becomes the big cheese in Saratoga Springs
-
June 21, 2012 by
Mr HomeBuilder
LEESBURG, Ga. (AP) Authorities are asking people to avoid a popular swimming hole on a south Georgia creek as they try to clean up hundreds of roofing nails dumped at the site.
The Albany Herald reports (http://bit.ly/NfO1IO) that members of the Lee County Fire Department's dive team and volunteers will attempt to collect the nails from the "blue hole" underground spring on the Kinchafoonee Creek.
Lee County Chief Marshall and Code Enforcement Officer Jim Wright said vandals are suspected of dumping the nails.
Wright said a local company provided authorities with very strong magnets they hope will attract most of the nails.
The code enforcement office has posted signs asking people not to swim around the blue hole until after the cleanup effort.
___
Information from: The Albany Herald, http://albanyherald.com
2012 Associated Press. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.
Go here to see the original:
Hundreds of roofing nails dumped at swimming hole
Category
Roofing | Comments Off on Hundreds of roofing nails dumped at swimming hole
-
June 21, 2012 by
Mr HomeBuilder
HOMOSASSA SPRINGS Art Yerian carefully cradled the speckled beige object in his rubber-gloved hands, recognizing it as a rare and precious possibility.
He slid it slowly down into a bright stream of light.
"You see that air sack,'' he said, as the high-intensity egg candler lit up the large egg making it appear to glow in the dark.
Then he carefully did the same thing with the second egg. "There's an air sack on that one also,'' he said. "You can see that there's some kind of embryo.''
While not proof that the eggs were viable, it was enough to give hope that, in about three weeks, there may be new additions to the population of endangered whooping cranes, America's tallest bird.
And these additions would be the first ever conceived at the Ellie Schiller Homosassa Springs Wildlife State Park. Federal and state officials said they did not know of any captive whooping cranes in Florida that have produced viable eggs.
Billy Brooks, a recovery biologist with the U.S. Fish and Wildlife Service, said he was hopeful but realistic about the Homosassa Springs eggs. The crane experts worry that these will be infertile.
But if the eggs are fertile, Brooks said, they are likely bound for one of the whooping crane reintroduction or research programs based out of the Patuxent Wildlife Research Center in Maryland.
Chicks would mean that the Homosassa park's resident whooping cranes, Peepers and Levi, were not only serving their fellow cranes as an educational display, but they were also contributing more directly to the species' survival.
"It's a good thing, a really good thing,'' said Yerian, the park's manager. He will candle the eggs every several days until it can be determined for sure whether embryos are growing inside.
Excerpt from:
Captive whooping crane eggs offer hope for endangered species
Category
Second Story Additions | Comments Off on Captive whooping crane eggs offer hope for endangered species
-
June 21, 2012 by
Mr HomeBuilder
19-06-2012 16:36 If you are in need of an auto glass shop in Lake Geneva, WI, call on Auto Glass Network. For many years our glass repair service has been serving the community, helping clients with everything from Window Replacement to Windshield Repair and much more. We always put our customers first and maintain a high degree of customer service. For the best service in Lake Geneva, WI, come to Auto Glass Network.
Read the original here:
Auto Glass Shop, Window Replacement in Lake Geneva WI 53147 - Video
Category
Window Replacement | Comments Off on Auto Glass Shop, Window Replacement in Lake Geneva WI 53147 – Video
-
June 21, 2012 by
Mr HomeBuilder
South Bend, IN (PRWEB) June 20, 2012
The IndigoGarden DistrictHotel, which has been closed since 2008 after the economic devastation of Hurricane Katrina will be installing theThermolite Window Systemto mitigate noise and prevent its windows from being destroyed byhurricane winds.
The Thermolite Window System installation will begin in June 2012 and will be installed on the inside of thehotelas a supplement to its existing windows to help fortify the building from damage caused by window breakage and implosion as a result of hurricane winds.
Hotelmanagement was looking for a way to reduce noise transmission from room to room and also to protect the building--but want to make sure that any work didnt change the architectural look and feel of thehotel, stated Therm-O-Lite Inc. President Steve Champlin. The Thermolite Window System is a great fit for thehotelbecause we are able to reduce the noise levels, provide piece of mind, reduce their energy consumption and the system won't change the look of the windows.
Hurricane winds can cause significant damage tohotelsand other buildings when the windows are compromised. When the windows have imploded and broken, the air pressure in the building changes and can cause structural collapse and significant damage to the building--including causing the roof to lift off--and can be deadly to building occupants.
About Therm-O-Lite Inc.
Since 1979, Thermolite has been a leading innovator in supplemental interior window systems. It is a GSA-certified contractor and work with the hospitality industry, governmental agencies, the U.S. military, commercial renovators, and historical preservation projects.
The patented Thermolite Window System is a one-of-a-kind alternative to traditional replacement windows. This 100% customized window system is designed to provide superior protection against bomb blast, audio espionage and hurricanes while reducing noise, sealing the building envelope and preserving historic architectural integrity. For more information, please visit: ThermoliteWindows.com.
Link:
Thermolite Window System Provides Hurricane Protection for Indigo Garden District Hotel in New Orleans
Category
Window Replacement | Comments Off on Thermolite Window System Provides Hurricane Protection for Indigo Garden District Hotel in New Orleans
-
June 21, 2012 by
Mr HomeBuilder
IRVINE A construction mistake that ruptured an underground gas line early Wednesday forced the evacuation of an office building and shut down a nearby road.
The Gas Company pinched off the leaking natural gas and repaired the broken plastic pipe several hours after people first reported hearing the hiss of escaping gas. Workers were let back into the building at 3101 Michelson Drive before noon, after waiting for the area to air out.
Workers wait as gas company welders go to work. Irvine officers had shut down traffic on Carlson Avenue after evacuating a nearby building due to a gas leak near the Shops at Park Place.
KEN STEINHARDT, THE ORANGE COUNTY REGISTER
ADVERTISEMENT
A construction company doing work in the area hit and ruptured the two-inch underground gas line, said Angela Fentiman, a SoCal Gas spokeswoman. Firefighters responding to a call about a hissing noise in a nearby parking lot discovered the leak around 7:30 a.m.
Carlson Avenue was closed while firefighters waited for crews to shut off gas to the area, said Capt. Marc Stone of the Orange County Fire Authority. The U.S. Bank office building and the adjacent parking structure were also evacuated.
A work crew repaired the pipe shortly before 11 a.m., but officials waited for the natural gas in the air to dissipate before letting workers return to the building. The evacuation was lifted before noon.
The gas leak is still under investigation. But Fentiman said it's a good reminder that workers both professionals and do-it-yourselfers -- should call 811 before they dig so utility companies can mark underground lines.
Contact the writer: shernandez@ocregister.com or 949-454-7361
More:
Irvine building re-opens after gas leak
-
June 21, 2012 by
Mr HomeBuilder
COLUMBUS, Ohio, June 20, 2012 /PRNewswire/ -- Mark Corna, president of Corna Kokosing, announced winning the contract for the new $20 million parking structure at Easton Town Center.
Corna said the Gramercy parking garage in Columbus, which will be fully completed in 2013, remains on schedule to partially open before the end of 2012.
"Easton is such a success that it is crowded all the time," said Mark Corna of Corna Kokosing. "This new parking structure will provide shoppers access to parking closer to where they want to shop."
Corna added the new garage will have 1,050 spaces, an increase of 600, plus a walking bridge connecting shoppers to Macy's. To accommodate customers and project plans, Corna said his team, based in Columbus, incorporated creative scheduling.
"We begin our concrete pours at 4:30 a.m. to avoid competing with the traffic from the people who are coming to visit Easton," Corna said.
Mike Girouard, estimator for Corna Kokosing's Gramercy parking garage project, added, "I think we bring an understanding of what it takes to work in this environment, minimizing the impact to the retail business, avoiding disruption to their operations."
Corna Kokosing was one of three contractors involved in constructing the original Easton Town Center back in 1998, and Corna is honored to be back for this newest addition to Columbus and central Ohio.
"Our relationship with Easton goes all the way back to the beginning, and we are really delighted to be involved now with the new parking garage and to continue to serve that ownership," Corna said.
About Corna Kokosing Construction Company: Corna Kokosing Construction Company, a division of The Kokosing Group, is a full-service construction manager/general contractor specializing in healthcare, education, manufacturing, office and retail markets. The Kokosing Group employs more than 3,500 associates throughout central Ohio, with annual revenues of $800 million.
Read more:
Corna Kokosing Construction Building Easton's New $20 Million Parking Garage in Columbus
Category
Office Building Construction | Comments Off on Corna Kokosing Construction Building Easton's New $20 Million Parking Garage in Columbus
-
June 21, 2012 by
Mr HomeBuilder
Every homeowner wants to update and improve their home. But some renovations and improvements can make a big difference in the potential resale price of a home while others don't. Here are some expert tips on the improvements you should make versus the ones you should avoid.
Let's be honest, everyone wants their own bedroom. But what makes more sense, renovate an existing bedroom or add a new one?
DON'T: Add a new master bedroom suite.
While this project might make waking up every morning a little bit easier and more enjoyable, it doesn't make as much sense from an investment standpoint.
According to Remodeling magazine's Cost Vs. Value Report 2011-12 ( 2011 Hanley Wood, LLC.), the average master suite addition cost over $106,000, but only adds $62,874 to the resale value of the home. That puts it at the bottom of Remodeling's list for return on investment along with a sunroom addition and a home office remodel. All of these projects will add to your home's resale value, just not enough to offset much more than half of their high cost.
DO: Turn an attic into an extra bedroom.
Read: Go green when renovating: Choose deconstruction over demolition
Remodeling's report estimates that an attic bedroom will set you back just over $50,000 on average. However, this additional sleeping space can add over $36,000 to your home's resale price, allowing you to recoup 72.5 percent of the cost -- a far better return on your investment
If you're planning on selling your home, your property's exterior is a potential buyer's first impression. That said, some curb-appeal improvements are more cost-effective than others.
DON'T: Overpay for a front door.
Originally posted here:
Homeowners: Don't do that, do this
-
June 20, 2012 by
Mr HomeBuilder
A bund on the seaward side of the vented dam left three houses damaged
It was the delay in providing a retaining wall as part of the construction of the Maravoor vented dam that caused the damage to houses, lands and a road in Padushedde area on the banks of the Gurupura river, it emerged on Tuesday.
The flash floods following heavy rains on Sunday washed away several coconut trees and other plants being grown by residents and the road they were using to reach nearby bridge on the Mangalore-Bajpe Road. People are forced to take a circuitous route via Bondel.
The water level rose in the early hours of Monday suddenly and started to flow close to the houses causing erosion of land and entered plantations and damaged the road. Residents allege that authorities did not take steps to prevent the flash floods and pointed out that blocks because of construction of the vended dam were to blame. The houses of Oswald, John Francis DSouza, and Estine DSouaza took a beating. Major damage was caused to Mr. Oswalds house. The three families were busy shifting their household articles when The Hindu visited the site on Tuesday.
Alvin DSouza told The Hindu at Padushedde that he had ancestral property of one acre with coconut palms and other plants. The plants were washed away. He said he had met zilla panchayat officials about a month ago and urged them to take precautionary steps to prevent flooding.
The Maravoor vented dam is being constructed to supply drinking water to Bajpe and surrounding areas. Construction of retaining wall to protect the houses and lands was part of the scheme. Zilla Panchayat Executive Engineer Satyanarayana told The Hindu that there was a delay in getting approval for the retaining wall. The project provided for construction of such walls wherever water pressure could be more. The area abutting the houses was identified for construction of the retention wall. The approval was secured only on May 14 and the same contractor building the vented dam was asked to build the wall as well. The officer said the houses suffered damage even before the work could begin.
Mr. Satyanarayna said a bund on the seaward side of the dam had affected free flow of water causing damage to the houses. The bund, a heap of loose earth, was created while laying apron an underground concrete structure on the seaward side that is built to ensure that sea water did not mix with the sweet water of the river when drinking water supply begins. A part of the bund was washed away.
He said officials had taken steps to ensure free flow of water by clearing the blockages. Efforts would be made to provide for a road so that Padushedde households got easy access to the Maravoor Bridge and beyond.
The three affected families were shifted to houses in Kavoor, Bondel, and Marakada. Residents were upset that they were forced to leave an area in which they had been living for decades. Who will bear our losses? asked Rufina, a niece of Mr. Oswald.
See original here:
Delay in building retention wall blamed for Maravoor flooding
Category
Retaining Wall | Comments Off on Delay in building retention wall blamed for Maravoor flooding
-
June 20, 2012 by
Mr HomeBuilder
1:00 AM
By Betty Adams badams@centralmaine.com Staff Writer
AUGUSTA -- All the tenants are now gone from a four-unit apartment building on State Street that city officials recently deemed unsafe for living.
Officials had the first three apartments vacated early last week after a codes enforcement officer concluded that the decks providing the only access to the units were unsafe.
The remaining tenants in the ground-floor apartment were told Friday to find new housing and to be out by Monday.
"We told them we didn't feel comfortable even allowing anyone on the premises with the condition of those decks," Robert Overton, the code officer, said Tuesday.
The family, which had several young children and a dog, found a new home within walking distance of their old residence, Overton said.
He said some families still might have belongings on site, but he told them to limit their visits because of the decks. He said the 11 State St. building cannot be re-occupied until the decks are repaired and inspected and until the entire building is inspected for compliance with life and safety codes.
The owner, Kenneth Ouellette, has not responded to several messages left in recent weeks at his Monmouth home phone number.
Overton said Ouellette met with him and with Augusta Fire Chief Roger Audette last week about the property. Ouellette did not say what he planned to do about the building, Overton said.
View original post here:
Unsafe 4-unit apartment house now empty
Category
Decks | Comments Off on Unsafe 4-unit apartment house now empty
« old Postsnew Posts »