Categorys
Pages
Linkpartner

    Home Builder Developer - Interior Renovation and Design



    Page 14,613«..1020..14,61214,61314,61414,615..14,62014,630..»



    Den Tandt: Harper mulls cabinet shuffle — who's getting the axe?

    - June 20, 2012 by Mr HomeBuilder

    "And what is so rare a day in June?" wrote the poet James Russell Lowell. "Then, if ever, come perfect days." Except in Ottawa, where the fairest month is primarily a time to speculate about the entrails of power. Who's up, who's down and who's out in the cabinet shuffle expected before the fall session?

    This season, as in the past, Prime Minister Stephen Harper is holding his cards preternaturally close to his vest. However, he is expected to put a new face on the government beginning in early August with a deputy-minister shuffle, then continuing in late August or September at the ministerial level.

    Conservative insiders expect this remix will be substantial, as the government seeks to re-calibrate following a first year in majority during which it was repeatedly buffeted by controversy, ministerial missteps and scandal. Though the final roster will remain known only to the PM and perhaps his wife and chief of staff until shortly before it is unveiled, a few names recur.

    - Top dogs:

    Jim Flaherty is not expected to budge from Finance, as he remains the mainstay of the Tories' economics team. Three other names top Conservatives' lists of senior ministers who've consistently outperformed and have earned their pick of jobs: Jason Kenney at Immigration, John Baird at Foreign Affairs and James Moore at Heritage.

    Any one of these three could be airlifted into Defence to clean house there. The drawback would be that each is helping the government appreciably now in a key portfolio. Kenney is two-thirds of the way through his overhaul of immigration. Baird is hitting his stride as a foreign minister, having spent the better part of the past year outgrowing his old attack-dog persona. Moore has managed to ride herd on the Canadian Broadcasting Corporation without a major upheaval for a Conservative, a feat of ineffable dark magic.

    - Rising stars:

    The acknowledged up-and-comers, in no particular order, are Chris Alexander, Ajax-Pickering; Michelle Rempel, Calgary-Centre-North; Candice Hoeppner, Portage-Lisgar; Kellie Leitch, Simcoe-Grey; and James Rajotte, Edmonton-Leduc.

    Rempel is bright, a good communicator and holds Jim Prentice's former seat. Leitch, a pediatric surgeon and frequent pinch-hitter in Question Period, holds the seat once held by Helena Guergis. Rajotte, respected in caucus and chair of the Commons finance committee, has long been deemed a shoo-in for promotion, but has been held back by the preponderance of strong Alberta MPs, including the PM, already in cabinet.

    - On the banana peel:

    See the rest here:
    Den Tandt: Harper mulls cabinet shuffle — who's getting the axe?

    Tibma Design Build Needham Kitchen Remodel and Family Room Addition – Video

    - June 20, 2012 by Mr HomeBuilder

    19-06-2012 10:05 Cathy from Needham, Massachusetts, is very pleased with her family's remodeled kitchen and family room addition. Award-winning Tibma Design designed and built a new kitchen and added a spacious family room to their Cape Cod style house that gives an open and airy feeling that she and her family love.

    Read more:
    Tibma Design Build Needham Kitchen Remodel and Family Room Addition - Video

    Labrador Iron Mines Reports March 2012 Year-End Results and Provides Outlook for 2012 Mining Season

    - June 20, 2012 by Mr HomeBuilder

    TORONTO, ONTARIO--(Marketwire -06/20/12)- Labrador Iron Mines Holdings Limited ("LIM" or the "Company") (LIM.TO) today reported its operating and audited financial results for the fiscal year ended March 31, 2012.

    The Company is also pleased to report that it continues to successfully deliver results on a number of key initiatives for the start of the 2012 operating season, including three shipments and sales of iron ore totalling 515,000 tonnes.

    Pre-Production Highlights

    During the pre-production planning period from January 1 to March 31, 2012, LIM carried out a number of initiatives in support of a successful 2012 operating season:

    John Kearney, LIM's Chairman and CEO, commented: "Our strategy during the off-production winter months was to carry out key objectives in order to build a strong foundation for the 2012 mining season. These objectives were designed to address both the operational and organizational requirements critical for the success of our business as we enter the first full season of mining operations in 2012."

    Recent Highlights

    Full-scale mining operations re-commenced at the James Mine on April 2, 2012 in its first full season of production. To date, the Company has executed key deliverables as follows:

    "Given the strong start and progress made to date, we fully expect to achieve our two million tonne production target in 2012" commented Rod Cooper, LIM's President and COO. "With the groundwork at hand, we will continue to focus on optimizing and expanding our operations to achieve excellent results in 2012 and beyond."

    Outlook: On Track in 2012

    James Mine and Silver Yards

    Go here to read the rest:
    Labrador Iron Mines Reports March 2012 Year-End Results and Provides Outlook for 2012 Mining Season

    Laying the Beams, Building Blocks to Upstate Cancer Center

    - June 20, 2012 by Mr HomeBuilder

    Readmore: Local, News, Upstate Cancer Center, Jobs, Cancer Patients, Cancer Treatment, Syracuse Upstate Cancer Center, Steel Beams, Syracuse, Tons of Steel Beams, Construction, Employ, Central New York Neighbors

    Upstate Cancer Center Completed Projection Fall, 2013

    SYRACUSE -- Construction crews are hard at work installing 550 tons of steel beams at thenew Upstate CancerCenter, laying framework for the $50 million dollar project.

    When it's complete, the 5-story building will serve adults and children living with cancer, and house out-patient treatments all in one place. There will be a rooftop garden, meditation rooms, and a family resource center --all additions that will help the center better serve Central New York neighbors.

    Right now, the center is scattered around campus in different places. The new center will make treatment easier for patients and their doctors.

    "We're going to have radiation, chemotherapy, surgical consultation all located in one building, so the doctors can be together to talk to patients, groups of patients about the best way to treat the cancer which all can be done in one location," says Leslie Kaman, Medical Director of the Upstate Cancer Center.

    The target date for completion is fall of 2013.

    The beams started to arrive on site Monday. Crews will work to continue installing them throughout the summer. This is the second phase of construction.

    "Finally, it's going to get more exciting. People are going to begin to see this beautiful new building take shape," says Kohman.

    The construction will employ about 300 people.

    See the original post:
    Laying the Beams, Building Blocks to Upstate Cancer Center

    China Unicom to Reduce Cheapest Smartphone Prices by 30%

    - June 20, 2012 by Mr HomeBuilder

    By Bloomberg News - 2012-06-20T06:04:23Z

    China Unicom (Hong Kong) Ltd. (762), the countrys second-biggest wireless carrier, will cut the price of its cheapest smartphones by 30 percent to about $110 in an effort to expand its market share as user growth slows.

    China Unicom will introduce smartphones costing less than 700 yuan in China in the near future, after great success with models priced at less than 1,000 yuan ($157), President Lu Yimin told the GSMA Mobile Asia Expo in Shanghai today.

    For the mass market we launched a series of promotions with 1,000-renminbi smartphones from 2010 to 2011, Lu said. In 2012, we will continue promotion measures.

    China Unicom declined 3.9 percent to HK$10.40 as of 1:52 p.m. in Hong Kong trading, poised for its biggest drop since June 4.

    Lu didnt provide a more specific timeframe for selling the cheaper smartphones. China Unicom currently offers handsets from Huawei Technologies Co. and ZTE Corp. (000063) costing less than 1,000 yuan each.

    The Beijing-based company has introduced 235 smartphones since starting 3G service in 2009, Lu said.

    The carrier added 2.73 million users to its third- generation, or 3G, service last month, China Unicom said yesterday. That was fewer than the 2.92 million additions in April, and was the lowest monthly gain since September.

    To contact Bloomberg News staff for this story: Edmond Lococo in Beijing at elococo@bloomberg.net

    To contact the editor responsible for this story: Michael Tighe at mtighe4@bloomberg.net

    Read more here:
    China Unicom to Reduce Cheapest Smartphone Prices by 30%

    A new home for collaboration

    - June 20, 2012 by Mr HomeBuilder

    The Molecular Engineering Building will open June 25. Photo by Alex Ho.

    Featuring four floors of lab and office space specifically tailored for research needs, the new Molecular Engineering and Sciences building ended up expanding considerably on the original plans for reconstruction.

    The building, home to the UW Molecular Engineering and Sciences Institute (MESI), will open its doors June 25.

    The UW initially issued a bond to obtain a total of $78.5 million to fund the building. Construction began in fall 2009, at which point two and a half floors were planned to be left unfinished and completed at a later phase of construction. However, construction pricing fell as a result of the 2008 crash of the housing market, and the UW was able to save substantially. The College of Engineering then received a grant to fund the rest of the building.

    Within the budget we originally had, we have been able to add a considerable amount of scope, said Steve Tatge, project manager of the UW Capital Projects and general manager of the building process. Thats why it took longer. The budget was established at the end of 2007, so pricing estimates shifted considerably.

    Because the construction of laboratories is dependent upon the work done within, many factors had to be considered. The placement and design of each lab space had to meet the labs purpose. Skylights are strategically placed for each lab, and the site was chosen for its low-vibration statistics. Tatge said such features allow more sensitive research to be conducted.

    There is also a room completely lined with aluminum to reduce electromagnetic interference for sensitive tests. The construction of such rooms required many tweaks, extending the building timeline. But safety permits were obtained in May, rendering the building open for furniture placement and move-ins.

    Originally posted here:
    A new home for collaboration

    New building will expand Xcel Minneapolis headquarters

    - June 20, 2012 by Mr HomeBuilder

    Opus Development Corp. said it plans to erect a nine-story office building on Nicollet Mall for Xcel Energy to lease so it can expand its downtown Minneapolis headquarters.

    The 212,000-square foot glass and pre-cast stone building will be built on the southeast corner of Fourth Street and Nicollet, directly across the street from Xcel's eight-story headquarters at 414 Nicollet Mall.

    Xcel will be the sole tenant and use the new building to relocate about 750 employees now using leased offices about 21/2 blocks away in Marquette Plaza. Their lease expires in 2016, said Judy Poferl, president and CEO of Northern States Power-Minnesota, an Xcel company.

    "This serves to get us closer and get us a more campus-like feel," Poferl

    Minnetonka-based developer Opus Group announced Tuesday, June 19, 2012, that it plans to build a nine-story office building on Nicollet Mall in downtown Minneapolis across from Xcel Energy Inc. headquarters. (Courtesy to Pioneer Press: Opus Group)

    Xcel has a total of about 1,500 employees in downtown Minneapolis, including 750 at 414 Nicollet.

    The utility will keep its headquarters and is considering building skyway access to the new building going up across the street.

    The new building doesn't mean that Xcel is planning to add to its downtown workforce, but the company has noticed it needed additional workers when it takes on new projects, such as building transmission lines, Poferl said.

    The lease for the new building will have minimal impact on the company's finances since it would have had to negotiate a lease for its employees at Marquette Plaza anyway, Poferl said.

    "We believe we got favorable pricing," she said.

    Read the original:
    New building will expand Xcel Minneapolis headquarters

    Building work begins in Gower schools

    - June 20, 2012 by Mr HomeBuilder

    By Sandy Illian Bosch sbosch@pioneerlocal.com June 19, 2012 1:58PM

    Updated: June 19, 2012 5:59PM

    School is out, but its a busy summer in the Gower District 62 schools.

    Right now, were in the design stage, Superintendent Steve Griesbach said of the building and renovation projects made possible by an April referendum vote, when Gower voters agreed to issue $9 million worth of bonds to pay for improvements to both schools.

    And while the School Board searches for the right construction manager to see the project through, other work, including renovation of the Gower West gymnasium, is under way.

    We received a grant through Sen. (Jim) Durkins office, which is paying for most of the work, Griesbach said.

    The $250,000 grant not only will pay for a new floor, lighting and new paint in the elementary gym, it also will pay for an interactive white board at the middle school and a new sign outside Gower Middle.

    The masonry is crumbling on it, Griesbach said. The replacement, which will include an electronic message board, will cost about $30,000.

    The remaining $60,000 will be used next summer, he said, to upgrade the wireless networks at both buildings.

    Meanwhile, the School Board will begin interviewing potential construction managers on July 2.

    See more here:
    Building work begins in Gower schools

    Xcel Signs for New Nine-Story BTS Office

    - June 20, 2012 by Mr HomeBuilder

    Last Updated: June 19, 2012 11:22pm ET

    About this Ad

    Sign Up Today

    The office will be across from the HQ and next to Nicollet Residences.

    MINNEAPOLIS-Xcel Energy has hired Opus Development Corp. to build a new office building to hold a consolidation of spread-out employees. The energy firm has agreed to a long-term lease on the proposed 212,000-square-foot building, to be built at the southeast corner of Fourth Street and the Nicollet Mall.

    The company has about 1,500 employees at its headquarters at 414 Nicollet. The new office will be built across from the HQ over a private parking ramp. Ben Fowke, chairman, president and CEO of Xcel, said in a statement that the new building will improve operating efficiency. Leasing space in this new building is a prudent, cost-effective way to consolidate our operations, meet our future space requirements and create a great environment for our employees, he said.

    Opus hasnt released the cost of the build-to-suit project. The company is about to start building the 33-story Nicollet Residences apartment building next door, over the site of the former Powers Department Store. A source tells GlobeSt.com that the entire one-block project is expected to cost Opus more than $160 million to build. The company has already said the apartment tower will cost about $108 million.

    Dave Menke, SVP and general manager with Opus, tells GlobeSt.com that the company will begin the new office construction in 2014 and will finish in 2016, to align with current Xcel lease expirations at smaller locations. The new building will be owned by Opus Group. Nelson Tietz & Hoye represented Xcel in the lease deal.

    Menke says the Minneapolis area isnt seeing much new office development besides build-to-suit for efficiency. Most of the Minneapolis markets still need substantial fundamental improvements before we start seeing speculative development, he said. The Minneapolis office market is at about 17.5% vacant.

    Categories: Midwest, Office, Development, Leasing, Minneapolis

    See the rest here:
    Xcel Signs for New Nine-Story BTS Office

    Is it Time to Start Building Office Yet?

    - June 20, 2012 by Mr HomeBuilder

    Last Updated: June 20, 2012 07:19am ET

    SPECIAL REPORT

    Join the thousands of real estate professionals that subscribe to the Chicago AM Alert. Each and every morning, we deliver the important stories, data, analysisas well as the opinions and insights of industry thought leaders to provide you with market intelligence and a daily business advantage.

    Become a registered member today and dont miss another important story in the Chicago market. Let GlobeSt.com be your source for everything real estate.

    About this Ad

    Sign Up Today

    Hines' River Point is the only large spec office in Chicago today.

    CHICAGO-New construction is late. This is now the third year of the US economic recovery, and new non-residential development is traditionally supposed to trail a recovery by 18-24 months. The construction industry is still dragging feet, with only about a third of the expected jobs by this time in a recovery cycle.

    There is some movement multifamily, taking advantage of the switch from home owning to renting, is seeing a lot of new starts. Theres also cranes in the air for office in the core markets of New York City, Washington, DC, San Francisco, Houston and even Seattle. But for the rest of the country, companies are still holding back on agreements to start new office buildings.

    According to experts, many large markets, such as Chicago, today have the large block demand for around four new office buildings, but are seeing one building announced or nothing. In Chicago, only Hines $300 million River Point project in the River North area is moving forward, having finally closed financing with partner Ivanhoe Cambridge after a few failed starts since 2008.

    See the original post here:
    Is it Time to Start Building Office Yet?

    « old Postsnew Posts »ogtzuq

    Page 14,613«..1020..14,61214,61314,61414,615..14,62014,630..»


    Recent Posts