Categorys
Pages
Linkpartner

    Home Builder Developer - Interior Renovation and Design



    Page 14,651«..1020..14,65014,65114,65214,653..14,66014,670..»



    BBB warns of A/C scams this time of year

    - June 8, 2012 by Mr HomeBuilder

    TUCSON - If it's 'too good to be true', it usually is. And that is true with air conditioning services, according to the Better Business Bureau of Southern Arizona.

    The BBB is warning Southern Arizonans to be wary of companies or contractors offering to install A/C units, or offering to tune up their existing units.

    In 2011, the BBB received over 9,500 inquires from consumers about heating, ventilation and air conditioning (HVAC) contractors in Southern Arizona between May and the end of September.

    Unfortunately, complaints against HVAC companies increase along with inquiries. As HVAC contractors ramp up their advertising, unscrupulous contractors often make misleading, or even false claims about the price of their services, and even the quality of the equipment they're selling.

    Wade Hamstra, of Hamstra Heating and Cooling- a Tucson HVAC contractor doing business in Southern Arizona since 1983- says that there are a few "red flags" consumers can look for to ensure they're not being ripped off:

    RED FLAG #1 - THE LOW-BALL PRICE: Ever see those ads that say '$39 Heating or A/C Tune-Up!'? Sounds great doesn't it? Don't be fooled: an average heating and cooling service technician makes at least $18 per hour. Add in the costs of fuel to get to the home, the service van, overhead expenses for a basic office- people to answer the phone, schedule calls, process paper- and the average HVAC company has, at a bare minimum, expenses of $50 per hour. When you add up all these expenses it's very unlikely you'll ever find a true $39 tune-up.

    RED FLAG #2 - THE 400 SQUARE FEET PER TON OF A/C 'RULE OF THUMB': Just about any consumer who has researched buying a new A/C system has read about, or had a contractor tell them about the 'Rule of Thumb' for equipment sizing: "Mr. Johnson, your home is 2000 square feet, at 400 square feet per ton; you need a 5-ton air conditioning unit today." "This is the most bogus and lazy lie that exists in our industry," Hamstra says. "Every reputable heating and cooling company will insist on performing a Manual J Engineering Load Calculation- as required by the International Residential Code book, Tucson Electric Power and Energy Star- to determine the size of system you need. This process takes a lot of education and extra time to perform, but is essential for proper sizing. A system that is not properly sized will not keep a home comfortable, and will drive up energy bills at the same time it decreases equipment life."

    RED FLAG #3 - NEW SYSTEM QUOTES OVER THE PHONE ARE NOT ACCURATE!: There is a large range of variables when performing a system replacement. For that reason it's virtually impossible for an A/C contractor to give an accurate estimate for a new system over the phone. Hamstra lists three reasons why it's not possible to give an accurate estimate over phone: 1. The home might have experienced changes since the original system was installed (new windows, added insulation, added addition, more internal heat loads like appliances, TV's, computers, people). All of these factors will affect the system size that the home needs. The only way to ensure proper sizing- which leads to better comfort, energy efficiency and longer system life- is to visit the home, take all the proper measurements and run a computerized Manual J Load Calculation. 2. There's the issue of physical unit sizes: the contractor may need to visit the home to make sure that it has the physical space needed for a new model A/C unit. 3. Any customer looking to get new air conditioning equipment should also be concerned with making sure their duct system is adequate. If the duct is overlooked, a customer may get sold a highly efficient and more expensive unit that functions like a lower quality unit, due to leaky ductwork. It would be like putting a brand new Ferrari motor on an old Yugo chassis. It is not going to deliver great results. In order to deliver a proper solution, A/C contractors need to inspect the system as a whole.

    To find an HVAC contractor you can trust and to easily get free estimates scheduled through BBB's free E-Quote service, visit: http://www.tucson.bbb.org <http://www.tucson.bbb.org> or call: (520)888-5353.

    More here:
    BBB warns of A/C scams this time of year

    BBB issues caution when shopping for A/C this summer

    - June 8, 2012 by Mr HomeBuilder

    TUCSON - The BBB of Southern Arizona wants to caution you, as summer temps are well into the triple digits, to be careful when shopping for a HVAC (Heating Ventilation Air-conditioning) unit and a contractor to install the unit.

    There are the three major problems to look out for listed below in this warning released by the BBB:

    An A/C unit or some sort of cooling system is more or less a necessity during Southern Arizona's hot summers. Every year BBB sees a dramatic rise in consumer inquiries during the spring and into the summer as consumers look for HVAC contractors to tune-up, replace, or install units.

    In 2011 BBB received over 9,500 inquires from consumers about heating, ventilation and air conditioning (HVAC) contractors in Southern Arizona between May and the end of September.

    Unfortunately, complaints against HVAC companies increase along with inquiries. As HVAC contractors ramp up their advertising, unscrupulous contractors often make misleading, or even false claims about the price of their services, and even the quality of the equipment they're selling. Wade Hamster, of Hamster Heating and Cooling- a Tucson HVAC contractor doing business in Southern Arizona since 1983- says that there are a few "red flags" consumers can look for to ensure they're not being ripped off:

    RED FLAG #1 - THE LOW-BALL PRICE Ever see those ads that say "$39 Heating or A/C Tune-Up!"? Sounds great doesn't it? Don't be fooled: an average heating and cooling service technician makes at least $18 per hour. Add in the costs of fuel to get to the home, the service van, overhead expenses for a basic office- people to answer the phone, schedule calls, process paper- and the average HVAC company has, at a bare minimum, expenses of $50 per hour. When you add up all these expenses it's very unlikely you'll ever find a true $39 tune-up.

    RED FLAG #2 - THE 400 SQUARE FEET PER TON OF A/C "RULE OF THUMB" Just about any consumer who has researched buying a new A/C system has read about, or had a contractor tell them about the "Rule of Thumb" for equipment sizing: "Mr. Johnson, your home is 2000 square feet, at 400 square feet per ton; you need a 5-ton air conditioning unit today." "This is the most bogus and lazy lie that exists in our industry," Hamster says. "Every reputable heating and cooling company will insist on performing a Manual J Engineering Load Calculation- as required by the International Residential Code book, Tucson Electric Power and Energy Star- to determine the size of system you need. This process takes a lot of education and extra time to perform, but is essential for proper sizing. A system that is not properly sized will not keep a home comfortable, and will drive up energy bills at the same time it decreases equipment life."

    RED FLAG #3 - NEW SYSTEM QUOTES OVER THE PHONE ARE NOT ACCURATE! There is a large range of variables when performing a system replacement. For that reason it's virtually impossible for an A/C contractor to give an accurate estimate for a new system over the phone. Hamster lists three reasons why it's not possible to give an accurate estimate over phone:

    1. The home might have experienced changes since the original system was installed (new windows, added insulation, added addition, more internal heat loads like appliances, TV's, computers, people). All of these factors will affect the system size that the home needs. The only way to ensure proper sizing- which leads to better comfort, energy efficiency and longer system life- is to visit the home, take all the proper measurements and run a computerized Manual J Load Calculation.

    2. There's the issue of physical unit sizes: the contractor may need to visit the home to make sure that it has the physical space needed for a new model A/C unit.

    Link:
    BBB issues caution when shopping for A/C this summer

    Police: Man threatens former colleague with gun at Stamford office building

    - June 8, 2012 by Mr HomeBuilder

    STAMFORD -- A man walked into a Shippan office building Friday afternoon and pulled out a handgun during an argument with a former co-worker, police said. Almost the entire patrol shift was sent to the scene, some officers armed with riot shields and assault rifles.

    Joel D'Ort, 27, of 2808 Lehigh Ave., Allentown, Pa., was arrested, and police were still working Friday evening on the extent of his criminal charges.

    D'Ort was arrested at his former Mohegan Avenue home after police secured the seven-floor office building at 70 Seaview Ave. with search teams. While clearing the building, officers got information about D'Ort and ran his name through their records, then went to his nearby former home, where he was arrested, police Lt. James Matheny said.

    D'Ort used to work for XL Capital, a company located in the Seaview House building at 70 Seaview Ave., police said; they did not know the exact nature of his employment there. The company takes up most office space at the building.

    At 1:13 p.m., a Seaview House employee called police and said a man threatened a woman with a gun on the fifth floor of the offices.

    During the confrontation, the woman had a phone pulled from her hand as she tried to call 911, police said; she was later treated at Stamford Hospital for a hand injury.

    Believing there may be an armed gunman in the Seaview House offices, the police department "emptied the building and sent everyone we could," police Lt. Sean Cooney said. At least 20 officers responded, he said.

    Officers formed teams and searched the building floor by floor, starting at the seventh story and working their way down. A second team searched the parking garage, and a third secured a perimeter around the building, stopping traffic at the office complex.

    Police found a handgun stashed in a ceiling tile in the fifth floor after an employee told officers the suspect had gone in that room for a few minutes after the confrontation, Cooney said. It was not the same room in which the alleged dispute occurred.

    During the search, police developed information that led them to a home on Mohegan Avenue a few blocks away in Shippan, they said. Officers spotted a man peering at them through windows inside the home, police said. The man, later identified as D'Ort, opened the door and came outside, where police said an officer told him to lie facedown on the ground; he was taken into custody without incident.

    More here:
    Police: Man threatens former colleague with gun at Stamford office building

    Phosphorus clean-up mandate could merge PUD, Cashmere sewer systems

    - June 7, 2012 by Mr HomeBuilder

    WENATCHEE A state mandate to reduce the amount of phosphorus discharged into the Wenatchee River could lead to Dryden and Peshastin joining the Cashmere sewer system.

    Chelan County PUD commissioners learned Monday that uniting the three systems is one of several alternatives for solving the phosphorus problem by the mandated 2019 target.

    The PUD owns the Dryden and Peshastin systems, which together have 200 customers.

    Ron Slabaugh, the PUDs water and wastewater manager, says more analysis has to happen to see if the alternative is viable.

    Questions remain about whether Cashmere could legally absorb sewer systems that exist outside its urban growth area.

    Bob Schmidt, the citys director of operations, said he and Mayor Jeff Gomes are interested.

    Its going to have to be couched in such a way so that at the very worst it would do no harm to our ratepayers, and potentially have some benefit, said Schmidt. If you have more ratepayers, typically youre a healthier utility. You have spread costs over a broader base.

    Cashmere is about to launch a $20 million upgrade of its existing municipal sewage-treatment system that will leave plenty of room for growth.

    If the alternative proves viable, the PUD would plan, design and install pipe that would carry Dryden and Peshastin sewage to Cashmere for treatment, Slabaugh said.

    The pipeline and necessary upgrades to the treatment plant would cost more than $8.9 million. Another estimated $50,000 to $100,000 in annual PUD operations and maintenance costs would diminish over time, Slabaugh said.

    Read more:
    Phosphorus clean-up mandate could merge PUD, Cashmere sewer systems

    Reach workcamps returning to area

    - June 7, 2012 by Mr HomeBuilder

    NEWFANE The Reach Workcamps are coming back to Niagara County.

    Next summer, possibly in July 2013, high school kids from all over the country will come to Newfane to work onporches, steps, wheelchair ramps, outhouses, painting and all kinds of assorted assignments.Its expected the teens will work on 60 to 100 homes in the county, providing $300,000 to $400,000 in improvements, but all for free.

    This is the second time the Reach camps have stayed in Newfane. Board of Education Vice President Kelly Artieri said she spent an evening back in 2010 with a Reach group. Artieri was touched by the organization aenthusiasmof the of the teens.

    I was brought to tears, it was the most amazing thing I have seen, Artieri said. Im so glad youre coming back.

    Reach Workcamps spent the summer of 2010 in Newfane, a move that was nessecary because of the c

    onstruction being done at Lockport High School, the camps former Niagara County home. Reach did not return to the Western New York area in 2011 and will not return this summer.

    The workcamps will stay in Newfane district buildings, at no cost to the district, for a pair of one-week sessions next year. Usually one-week programs, each Reach camp draws 400 to 500 teens from all over the United States.

    Michael Boron, the director of St. Johns Outreach, said the agency receives requests from clients in need of house repairs, but are unable to afford them. Some are even called to housing court in the city of Lockport after being cited.

    Theres not a lot we can do for them, given our limited resources, Boron said. This, on the other hand, provides us an excellent opportunity to service those low-income, home owning, taxpaying citizens of our communities and give them a better place.

    Based in Colorado, Reach holds about eight to 10 workcamps across the country each year. St. Johns Outreach is the local Reach workcamp coordinator, which means it will locate homeowners in need of Reach help.

    The rest is here:
    Reach workcamps returning to area

    How does your garden grow? Very, very small

    - June 7, 2012 by Mr HomeBuilder

    This tiny world is in the garden of Andi Peterson of Lincoln. Fairy gardens have taken off with a certain age group but maybe not the age you might think. Below is a creation by Deb Kistler and granddaughter Sasha to give as a Mother's Day gift.

    Courtesy of Andi Peterson

    MULHALL'S CLASSES

    11 a.m. July 21, for adults: Materials include a 12-inch pot and accessories. Cost: $45.

    Some of us never outgrow playing with dolls.

    Andi Peterson of Lincoln makes no apologies for the fairy gardens that populate her yard, front and back.

    She doesn't have children or grandchildren, but she does have a childlike sense of wonder about the tiny world she created, sometimes on her own, sometimes with help from a friend.

    Peterson isn't alone. Tiny gardens are cropping up in backyards and on front porches across the Midlands.

    Children and adults are planting greenery no bigger than a pencil eraser in a landscape no bigger than a flower pot. Some of these gardens hold dollhouse-size benches and Adirondack chairs. Often they feature miniature birdhouses, thimble-size pots and stepping stones for imaginary visitors.

    It's all part of a trend that's been bubbling for a while with kids who love Tinker Bell in Peter Pan and early-reader fairy books. But kids aren't the only ones besotted with fairy gardens.

    See original here:
    How does your garden grow? Very, very small

    Investigation: 2400 Webb Avenue Engineer, Owners Involved In Past Shady Dealings

    - June 7, 2012 by Mr HomeBuilder

    NEW YORK (CBSNewYork) There were startling discoveries Wednesday about the engineer and the real estate developers involved in the removal of fire escapes from a Bronx apartment building.

    CBS 2s Marcia Kramer has learned of a bid rigging conviction for one and allegations of political payoffs for the others.

    The hunt was on Wednesday for the licensed engineer, Roland Draper, who filed improper permits for renovations at 2400 Webb Ave., in the Bronx, and as a result the fire escapes were removed illegally.

    Kramer went looking for him in Hasbrouck Heights, N.J., but no one answered the door at his home.

    Draper also wasnt at the building in the Bronx, where his blooper of a mistake forced the evacuation of 200 people for who knows how long, because they he took down their fire protection.

    There are some serious questions to ask Draper and the people who hired him. CBS 2 has learned that Draper pleaded guilty to bid rigging for construction work done on Forest Park Gardens in Queens. As a result his engineering license was suspended in New York for two years and he was fined $5,000. New Jersey also moved to suspend his license last year for the same crime.

    With the University Heights building dramatically missing all of its fire escapes because of Drapers mistakes the city Department of Buildings is not only investigating his work on Webb avenue, but also his involvement in 48 other active projects in the city.

    Im speechless right now, displaced Webb Avenue tenant Yvonne Tyson said.

    But theres more to be speechless about.

    The owners of the Webb Avenue building, Samuel and Philip Goldfarb, were, according to published reports, involved in paying $7,000 in bribes to Sara Bost, the one-time mayor of Irvington, N.J.

    More:
    Investigation: 2400 Webb Avenue Engineer, Owners Involved In Past Shady Dealings

    Building activity extends drop to two years

    - June 7, 2012 by Mr HomeBuilder

    Australian building activity has contracted for its 24th consecutive month, based on weak commercial activity and new orders, a private study has found.

    The Australian Industry Group-Housing Industry Association's performance of construction index (PCI) fell 0.2 points to 34.7 in May.

    A reading below 50 indicates a contraction in activity.

    Advertisement: Story continues below

    Commercial construction was the weakest sub-sector, with its sharpest fall in three years, down 9.8 points to 25.4.

    Both house and apartment building remained weak, though the apartments were slightly improved.

    The index of house building activity fell 5.1 points to 28.2 - which was the steepest index decline since September 2011.

    Apartment building continued to decline, but at a slower rate as the index of activity in that sector rose 3.8 points to 26.7.

    New orders continued to be in contraction mode, rising only slightly to 33.7 for May.

    Engineering was the best performing sub-sector, but the rise of 0.4 points to 41.3 still left it in a downturn.

    Originally posted here:
    Building activity extends drop to two years

    Construction contracts for a 24th month

    - June 7, 2012 by Mr HomeBuilder

    Australian building activity has contracted for its 24th consecutive month, based on weak commercial activity and new orders, a private study has found.

    The Australian Industry Group-Housing Industry Association's performance of construction index (PCI) fell 0.2 points to 34.7 in May.

    A reading below 50 indicates a contraction in activity.

    Commercial construction was the weakest sub-sector, with its sharpest fall in three years, down 9.8 points to 25.4.

    Both house and apartment building remained weak, though the apartments were slightly improved.

    The index of house building activity fell 5.1 points to 28.2 - which was the steepest index decline since September 2011.

    Apartment building continued to decline, but at a slower rate as the index of activity in that sector rose 3.8 points to 26.7.

    New orders continued to be in contraction mode, rising only slightly to 33.7 for May.

    Engineering was the best performing sub-sector, but the rise of 0.4 points to 41.3 still left it in a downturn.

    Australian Industry Group (Ai Group) chief economist Julie Toth said that non-mining-related construction remained extremely weak.

    The rest is here:
    Construction contracts for a 24th month

    St. Paul leaders tout Lofts luxury apartments developed by the city downtown

    - June 7, 2012 by Mr HomeBuilder

    When city officials promoted the Lofts at Farmers Market as a feasible project, some housing advocates and skeptical members of the St. Paul City Council balked. If the private sector wasn't interested in bankrolling a five-story, market-rate apartment building in the warehouse district, why should the city take the risk?

    Council Member Dave Thune and others pressed the case that market studies showed downtown St. Paul as a popular place to live, and the upscale Lowertown building would be fully occupied within nine months of accepting leases.

    In the end, they leased it out in three.

    On Wednesday, June 6, Thune joined St. Paul Mayor Chris Coleman and Cecile Bedor, director of the city's Planning and Economic Development Department, in a ribbon-cutting for the Lofts project, which overlooks the popular St. Paul farmers market at 5th and Wall streets.

    The 58-unit, $13 million apartment building represents a controversial break from tradition for St. Paul, which has previously focused much of its efforts downtown on building "workforce" housing for residents at modest incomes.

    The luxury Lofts project hit a standstill in 2008 after developer Brian Sweeney fired general contractor Gerry Flannery, setting off a legal dispute over cost overruns. Amid a series of legal claims and counter-claims, the team abandoned the site mid-stream. City officials debated the issue and decided to develop it themselves using Build America bonds, federal stimulus support

    "I almost can't believe that we're standing here," Thune told a crowd of onlookers at the ribbon-cutting, which occurred on the Lofts' second-story roof deck. Two years ago, he sat in on a legal settlement conference, wondering if the city should simply "fill the hole" left by the unfinished construction work. "It was below ground level at that point," he said.

    St. Paul Mayor Chris Coleman called the Lofts a key part of his "Rebuild St. Paul" development initiative, which seeks to jumpstart a number of construction projects that fell by the wayside during the recession. He thanked Bedor for rescuing the Lofts "from the grave" on a number of occasions, and Bedor gave similar accolades to project manager Diane Nordquist.

    Nearby, the city is taking a similar "hands on" approach in developing the long-delayed Penfield project, 254 units of upscale housing at 10th and Minnesota streets.

    Legal wrangling over the Lofts continues. The Minnesota Court of Appeals recently ruled that the city should not have allowed general contractor Shaw Lundquist to adjust its sealed bid upward after discovering a mathematical error in its calculations. The judges said the city should declare the $8.04 million contract null and void, though it is unclear what impact that would have on the building, which is already occupied.

    See the rest here:
    St. Paul leaders tout Lofts luxury apartments developed by the city downtown

    « old Postsnew Posts »ogtzuq

    Page 14,651«..1020..14,65014,65114,65214,653..14,66014,670..»


    Recent Posts