Home Builder Developer - Interior Renovation and Design
-
May 15, 2012 by
Mr HomeBuilder
Zoning for the Princeton hospital site is headed back to the Princeton Regional Planning Board after the developer gave up a requested increase in density and met affordable housing requirements.
AvalonBay was seeking to build 324 units, 44 more than the 280 approved in current zoning for the site. The Iselin-based builder gave up the extra 44 units after pressure from the community and to move the project forward.
Were doing the 20 percent (affordable housing), were reducing to 280 and everything weve heard from the public for the last month, six weeks, weve conceded to and complied with, said Ron Ladell, senior vice president, AvalonBay Communities, at the Borough Council meeting on Tuesday. Except for LEED, which youve already determined by the town attorney you cant mandate.
In previous meetings, the developer had said the 44 extra units would add another nine to the affordable housing component and additional profits on the project.
A new ordinance was introduced on Tuesday night that included provisions for signs, changes to the uses for the site to include a leasing office child care and an arts and crafts studio, said Lee Solow, planning director.
Borough Council members expressed support for porches in the design of the apartment buildings as attractive additions that promote a feeling of community and neighborhood.
Porches got most of the attention on Tuesday night because the Planning Board did not recommend adoption of stoops, patios, porches, balconies, bay windows and other design features to extend into the building setback area.
Mr. Ladell assured council that the porches and stoops do not intrude into the setbacks and stoops and porches make the development look more like one and two family homes, which matches the neighborhood.
Council president Barbara Trelstad said the apartment complex would have some private spaces for residents, and not a gated community. She used an analogy of a private backyard, which is open space, but not open to the public.
Original post:
PRINCETON: Hospital developer concedes; reduces the number of units
Category
Porches | Comments Off on PRINCETON: Hospital developer concedes; reduces the number of units
-
May 15, 2012 by
Mr HomeBuilder
Fire, rebulding, dedication
A plaque notes the fire, rebuilding and dedication of the new Zion Lutheran Church in Oriska. Dave Wallis / The Forum
A cross and a candlestick holder were rescued from the fire and are on display at the new Zion Lutheran Church in Oriska. Dave Wallis / The Forum
The Rev. Dan Faust, a retired Lutheran minister who serves as Zion Lutherans pastor, holds a copy of the Valley City Times Record showing the news of the fire. Dave Wallis / The Forum
ORISKA, N.D. - Even as the Zion Lutheran Church burned to the ground May 16, 2011, the congregation wasnt ready to give up.
As smoke and flames swallowed the 108-year-old building, former Zion president Tom Utke heard them say it over and over again: Were going to rebuild.
Almost one year later, a new church stands. On Mothers Day, the new Zion Lutheran Church hosted a confirmation class of three eighth-graders one whose family has been a member of the church for six generations.
At a time when small, country churches with dwindling memberships are folding, this town of 118 took a leap of faith. They built a new church, not only through their own efforts and donations, but also through the generosity of another church.
Fifty miles northeast of here, the members of Blanchard Lutheran Church had decided to close its doors. Bishop Bill Rindy of the ELCAs Eastern North Dakota Synod contacted the congregation to see if they could help Zion, whose insurance would only pay for the shell of the building. Blanchards members responded with a generosity that surprised even Rindy.
Today, reminders of Blanchard Lutheran are everywhere. The light oak pews are from Blanchard, as is the altar. The collection plates, the baptismal font, the organ, the sound system and the cross atop the building are gifts from Blanchard. The appliances, dishes and the broom and dustpan for Zions yet-to-be-constructed fellowship hall all Blanchard.
See the article here:
Out of the ashes: Town's efforts, another congregation's generosity resurrect Oriska church
Category
Church Construction | Comments Off on Out of the ashes: Town's efforts, another congregation's generosity resurrect Oriska church
-
May 15, 2012 by
Mr HomeBuilder
Thousands attend the groundbreaking for The Church of Jesus Christ of Latter Day Saints Provo City Center Temple in Provo Saturday, May 12, 2012. The temple will be constructed on the site of the Provo Tabernacle, a community landmark and gathering place from the time it was built in the 1880s until it was destroyed by fire in December 2010.
Jeffrey D. Allred, Deseret News
PROVO Dale King sang with a choir at a Christmas celebration in the Provo Tabernacle days before a fire gutted the historic building in late 2010.
The Provo resident sang with a choir again on the site Saturday, when leaders of The Church of Jesus Christ of Latter-day Saints dedicated the property for the construction of Provo's second temple to be built inside the tabernacle's shell.
For King, who lives just a few minutes from the historic building that was originally constructed from 1883 to 1898, the temple groundbreaking signified the rising of something beautiful from the ashes of devastation.
He and more than 5,600 people gathered on the grounds of the historic site for the ceremonies, during which Elder Jeffrey R. Holland of the Quorum of the Twelve spoke and offered a prayer of dedication. Also delivering remarks were Sister Patricia Holland, Elder L. Whitney Clayton of the Presidency of the Seventy, Elder William R. Walker of the Seventy and Elder Cecil O. Samuelson, emeritus Seventy and president of Brigham Young University. The proceedings were broadcast to LDS meetinghouses throughout Provo and Springville.
The Provo City Center Temple is expected to be completed in three years and will include underground parking.
During the groundbreaking ceremony, church leaders were joined by government and civic leaders in turning over shovels filled with soil to signify the beginning of work on the site.
Built in the heart of Provo, the historic tabernacle was a community gathering place for meetings and cultural events for decades.
Elder and Sister Holland attended their first LDS Church meeting together on the site in 1963, nearly 50 years ago. Elder Holland said he and his family have been sharing experiences on the site ever since.
More here:
Rising from ashes: Ground is broken for LDS Church's 2nd temple in Provo
Category
Church Construction | Comments Off on Rising from ashes: Ground is broken for LDS Church's 2nd temple in Provo
-
May 15, 2012 by
Mr HomeBuilder
... [W]hatever you did for one of the least of these brothers and sisters of mine, you did for me, Jesus said in a New International Version translation from Matthews Gospel. Taking the scriptures to heart, the youth of Crosby Church will build and will dwell overnight in a camp that they will make out of cardboard boxes like those in which many homeless people are known to sleep.
In the process of this temporary exercise, participating youth will raise awareness of the plight of homeless people and will collect donations of goods that those who are homeless need.
The youth are collecting building materials now. They will assemble and live overnight in their Box City from 8 p.m. on May 25 until 8 a.m. on May 26, hearing from speakers and taking part in other activities that will be planned.
The outreach is not a run-of-the-mill Friday night. Box City is not a run-of-the-mill construction project. Then, again, homelessness is not supposed to be a run-of-the-mill state.
Im just really excited about our Box City event, Crosby Church Senior Pastor Keenan Smith said. The young people will be setting up boxes, tarps, and different temporary structures, something similar to what someone who is homeless would be living in or making accommodations with.
All of our young people are going to experience a night of homelessness. They are going to be sleeping in the parking lot, just out under the stars. If its adverse weather, they will be in the rain. If its chilly, they will be cool, whatever it is, to just kind of help them understand and recognize not only them but our community the plight of the homeless. Admission is a sack of canned goods that will be donated to a homeless shelter.
Crosby Church youth will show the community that which they will learn, what some of the least among us experience.
Im really excited about what it pours into our young people, the value and the appreciation of the things that we have, Smith said, and an understanding that there are those, that are all around us, in our midst, that are less fortunate, and the responsibility that we have, as a church and as a society, to be able to reach out and to help them get back on their feet or find a place.
Smith has planned events in recent years, such serving food or donating shoes or socks to homeless people, to instill in young congregants the palpable sense of hopelessness that accompanies homelessness. Each activity, Box City included, is a two-fold reality check about the nature and the proximity of the problem.
It is a sad indictment that a lot of our young people didnt realize that you dont have to go to a third-world country, that some of it is right around here, Smith said. So I think it is just really a neat awareness thing that is going to be happening in our region and in our community.
See the original post here:
Crosby Church youth to build Box City May 25
-
May 15, 2012 by
Mr HomeBuilder
The big hail storm last August did a lot of damage in Maryville, but the members of one local church found inspiration in the destruction a spirit of sharing that has led them to reach out to a tiny east African village more than 8,000 miles distant from Nodaway County.
After the storm, the First Presbyterian Church of Maryville learned that its building would need a new roof. At around $70,000, it was not a cheap fix. Even with an insurance settlement and some money bequeathed from the estate of a deceased member, the small congregation about 100 people altogether was hard pressed to come up with the cash.
But then someone got to thinking, wasn't there a way to turn a negative into a positive? How could the church transform something as mundane even as a new roof into an expression of the congregation's faith and willingness to minister to others?
The answer came in the form of a tithe, the Old Testament principal that 10 percent of a faith community's resources should be offered to God.
Tithing as an expression of faith is perhaps most famously described in Malachi 3.10: "Bring ye all the tithes into the storehouse, that there may be meat in mine house, and prove me now herewith, saith the Lord of hosts, if I will not open you the windows of heaven, and pour you out a blessing "
In others words, give God a little, and God will give you a lot.
So the decision was made: First Presbyterian would raise 10 percent over what it cost to fix the roof and dedicate the additional funds to the Lord's work. But what work would that be?
As it happened there is a pastor named David Nzioka at the Swahili-speaking Neema Community Fellowship in Kansas City. Nzioka grew up in Thwake Village, Kenya, and his Neema Fellowship and First Presbyterian both belong to the Heartland Presbytery, an association of about 100 Midwestern Presbyterian churches.
First Presbyterian Pastor Jonathan Mitchell and Nzioka know one another and began talking about the possibility of some sort of partnership. Since Nzioka is heavily involved in mission work on behalf of his native village, Mitchell asked him what Thwake needed that would cost, say, around $7,000.
The answer was, "A church."
See the rest here:
Church roof turned into a symbol of giving
-
May 15, 2012 by
Mr HomeBuilder
The Rev. Forrest Moore, pastor of West Highland Baptist Church, speaks during a service held Sunday afternoon in the building of Cornerstone Full Gospel Baptist Church. West Highlands building was destroyed in the April 27, 2011, tornado, and the church has recently broken ground for a new facility on the grounds of the old one.
TUSCALOOSA | The West Highland Baptist Church was virtually wiped off the map in a matter of seconds.
The church was reduced to a pile of rubble by the April 27, 2011, tornado.
But rather than mourn, West Highlands members reacted to the devastation with thanksgiving and celebration.
The feelings that day were feelings of thanksgiving to God that He had warned us not to be there, said the Rev. Forrest Moore, pastor of West Highland. People were not as concerned about the building itself as they were about people being killed or injured.
We were supposed to have been there at that time of the storm, because it was on a Wednesday during a time wed be gathering together for prayer meeting and Bible study, he said. The Lord warned me to cancel it that day, so I called people telling them it would be canceled. Weve been thankful to God from point zero when we first found out that none of our folks were injured. We take a minute every Sunday to thank God for that.
On April 27, 2012, the anniversary of the churchs destruction, West Highlands congregants had another reason to celebrate.
Moore and several of the churchs leaders broke ground on a new church building at 628 29th St., the same location as the destroyed church.
It was awesome, Moore said of the groundbreaking ceremony. We had a tremendous turnout of both our members and others who were aware of it. It was exciting for our membership.
We had others who offered their sentiments, he said. They congratulated us. It definitely lifted the spirits of our members. Anything positive along those lines is always exciting for our congregation.
View original post here:
Tornado-stricken Baptist church begins the rebuilding process
Category
Church Construction | Comments Off on Tornado-stricken Baptist church begins the rebuilding process
-
May 15, 2012 by
Mr HomeBuilder
Beacon-News staff May 14, 2012 4:52PM
Updated: May 14, 2012 6:52PM
AURORA Church Road between Butterfield Road and Interstate 88 will be under construction for the next six months as part of a street widening project.
The construction project starts at 7 a.m. Wednesday and will close Church Road between Corporate Boulevard and Interstate 88, according to a press release from the city of Aurora. Church Road will be open for southbound local traffic only from Butterfield Road to Corporate Boulevard. Bilter Road and Corporate Boulevard will be open in both directions with occasional lane closures throughout the project.
The Church Road segment will be widened from a two-lane rural road to a three-lane street featuring a center turn lane for left-hand turns. Other improvements include the installation of storm sewers along with curbs and gutters.
Motorists should avoid the area if at all possible. Message boards and signs will direct motorists to the detour route, which is scheduled to change two to three times during the project.
Construction is anticipated to be completed in November, but the schedule could be revised if there are complications.
More here:
Church Road in Aurora scheduled to close Wednesday
Category
Church Construction | Comments Off on Church Road in Aurora scheduled to close Wednesday
-
May 15, 2012 by
Mr HomeBuilder
By DONALD R. SERFASS dserfass@tnonline.com
A Tamaqua church has major plans to improve access for members of its congregation.
Construction work for installation of an elevator has kicked into high gear at First United Methodist Church, 124 West Broad St., Tamaqua, according to the Rev. Jim Cavallero.
The 1852 brick and stone church is located within the Tamaqua National Historic District, and the church already has obtained appropriate approvals from zoning officials and the Tamaqua Historical Architectural Review Commission in order to begin with plans.
Heavy equipment is stationed adjacent to the church at the site of the former parsonage and last week a deep trench was dug to lay a foundation for the elevator shaft.
As congregations age at many churches, multi-story, 19th century churches often find themselves with a need to construct elevators for the convenience and accessibility of members. In fact, two other churches within one block of First United Methodist were retrofitted with elevators over the years.
In 1970, the First Presbyterian Church, 220 W. Broad St., installed and unveiled an elevator in its historic 1852 building. The elevator was dedicated by member J. Keilman Dudley in memory of his father John Lester Dudley. The congregation celebrated its 150th anniversary in 1996. The church building closed 11 years later as a result of consolidation, with the final service held on June 3, 2007. The building now serves as a private residence, art studio and gallery.
St. Jerome's Catholic Church, 266 W. Broad St., installed an elevator and dedicated it on September 24, 2000, along with unveiling the St. Jerome's Memorial Parish Center at the former site of the Tamaqua Salvation Army.
Read this article:
Reaching up
-
May 15, 2012 by
Mr HomeBuilder
KNOXVILLE Carelessly discarded smoking material apparently ignited a weekend blaze that displaced 35 people from their apartment building, fire investigators concluded.
No one was injured in the 9:27 a.m. Sunday fire at Bell Walker's Crossing, 8301 Block House Way, but flames rendered the 24 units in the building uninhabitable.
Firefighters arrived at the three-story building to find flames on second- and third-floor balconies that were climbing into the attic area.
Firefighters initially thought the fire had started on the third floor because that's where flames were most intense. Fire investigators, however, determined the flames began on the second-floor balcony of apartment 121, according to Knoxville Fire Department spokesman Capt. D.J. Corcoran.
"The fire then extended to the balcony directly above, and then into the attic area," Corcoran said. He was unaware if the person responsible for the fire was in the apartment when flames erupted.
Investigators have labeled the blaze as accidental.
As firefighters tried to douse the flames, a part of the third floor collapsed because of the construction, fire damage and water collecting in the structure.
The Knoxville chapter of the American Red Cross is helping some of the displaced residents.
More details as they develop online and in Tuesday's News Sentinel.
Read more:
Smoking blamed for West Knoxville apartment blaze
-
May 15, 2012 by
Mr HomeBuilder
RICHMOND, Va., May 14, 2012 /PRNewswire/ --May is a perfect time for outdoor activities such as sprucing up yards, cleaning out gutters, painting houses and building patios and decks. It's also national electrical safety month, and Dominion Virginia Power is encouraging customers to remember how to stay safe around electricity.
"Electric wires, transformers and poles are an important part of our lives, working silently and dependably day after day, but it is important to remember that electricity must be used safely and treated with the utmost caution and respect," said Rodney Blevins, vice president, electric distribution operations for Dominion Virginia Power. "We urge everyone to exercise caution around electricity and to make sure their children are cautious, too," Blevins said.
Virginia's Overhead High Voltage Line Safety Act requires that contractors who are planning to work within 10 feet of overhead high-voltage lines call Dominion toll-free at 1-866-DOM-HELP, or 1-866-366-4357 before starting work. This allows the proper safety arrangements to be put in place before the work begins.
Underground power lines are just as dangerous as those that are overhead. Call Miss Utility at least three working days in advance of your project to ensure that the underground lines are marked before you dig. The Miss Utility number is 811.
Other ways to stay safe include:
Another important consideration for electrical safety these days is portable generator safety. Improperly installed generators can be hazardous to homeowners and can flow power back into the de-energized power lines, endangering utility linemen who are working to restore power during outages.
Carefully follow the manufacturer's installation instructions when connecting a portable electrical generator. Dominion offers specific online safety tips on home electrical generators. If you are not sure how to do it, contact the manufacturer or call a qualified electrician.
Also make sure generators are properly ventilated and carbon monoxide fumes do not enter living spaces.
Additional home safety tips and information are available at http://esfi.org/ and at http://www.eei.org/newsroom/energynews/Pages/20100503.aspx.
Dominion Virginia Power is a subsidiary of Dominion (D), one of the nation's largest producers and transporters of energy, with a portfolio of approximately 27,500 megawatts of generation, 11,000 miles of natural gas transmission, gathering and storage pipeline and 6,300 miles of electric transmission lines. Dominion operates the nation's largest natural gas storage system with 947 billion cubic feet of storage capacity and serves retail energy customers in 15 states. For more information about Dominion, visit the company's website at http://www.dom.com.
Original post:
Dominion Virginia Power Encourages Electrical Safety During Outdoor Maintenance, Planting Projects
Category
Patios | Comments Off on Dominion Virginia Power Encourages Electrical Safety During Outdoor Maintenance, Planting Projects
« old Postsnew Posts »