Categorys
Pages
Linkpartner

    Home Builder Developer - Interior Renovation and Design



    Page 14,889«..1020..14,88814,88914,89014,891..14,90014,910..»



    Rafters Add Pair of Hurlers to 2012 Roster

    - February 28, 2012 by Mr HomeBuilder

    February 27, 2012 - Northwoods League (Northwoods) Wisconsin Rapids Rafters Wisconsin Rapids, WI - February 27th, 2012. The Wisconsin Rapids Rafters announced the additions of two right-handed pitchers to the 2012 roster today in junior Kyle Wormington (Valparaiso) and sophomore Ronnie Muck (Illinois). Muck will join current Illini teammate and returning infielder, Brandon Hohl, in Wisconsin Rapids this summer.

    "We are extremely excited to add two high-caliber pitchers to the team," said Manager Jake Martin. "Both guys possess power arms and will provide experience to the 2012 pitching staff."

    RHP-Kyle Wormington, 6'3", 210 lbs (R/R) Junior, Valparaiso

    A transfer from Connors State College, Wormington has gotten off to a great start this spring in his first year at Valparaiso University. After making his first two starts of the season, spanning 13.2 innings on the mound, Wormington carries a 3.29 ERA with four walks and as many strikeouts. Kyle was named the top newcomer to the Horizon League earlier this spring by Baseball America.

    Wormington earned All-Conference honors in 2011 for Connors State after posting an 8-1 record with a 2.67 ERA in 12 appearances as a sophomore. He walked just 18 batters while striking out 62 in 77.2 innings. His impressive performance also earned him a First Team All-Region Two Selection, in addition to his All-Conference recognition. Wormington is a native of Norman, Oklahoma.

    RHP-Ronnie Muck, 6'1", 190 lbs (R/R) Sophomore, Illinois

    Muck begins his sophomore campaign for Illinois after posting a 4.50 ERA in 10 innings of work as a freshman. He is no stranger to summer collegiate baseball having played with the Lombard Orioles of the Chicago Suburban Baseball League last summer.

    Muck was named the No. 38 prospect in the state of Illinois by Prep Baseball Report, Pioneer Press North Stars Player of the Year, and Bugle Newspapers Male Athlete of the year as a senior for Maine South High School in 2010. He was also an All-Area selection by the Chicago Sun-Times from 2008-2010 and was also All-Central Suburban Conference pitcher in 2008 and 2009. Muck posted a 12-4 record on the mound with a 2.48 ERA and 113 strikeouts in 80 innings as a senior in 2010. He also broke the single-season strikeouts record for Maine South with 98 during his junior year in 2009, before surpassing his own record his senior year. Muck is a native of Park Ridge, Illinois.

    The Wisconsin Rapids Rafters are members of the 16-team summer collegiate Northwoods League. The Rafters will play a 70 game schedule with 35 home games in 2012. Opening Day at historic Witter Field is scheduled for Wednesday, May 30th at 7:05 pm against the La Crosse Loggers. Reserve your 2012 ticket packages today by calling 715-424-5400, or in person by stopping by the Rafters office at historic Witter Field. The offseason office hours are Monday through Friday from 9am-5pm. For more information, visit http://www.raftersbaseball.com.

    • Discuss this story on the Northwoods League message board...
    • Digg this story
    • Add to Del.icio.us

    The opinions expressed in this release are those of the organization issuing it, and do not necessarily reflect the thoughts or opinions of OurSports Central or its staff.

    Continue reading here:
    Rafters Add Pair of Hurlers to 2012 Roster

    Newmont Says It’s Too Early to Say Whether Conga Will Proceed

    - February 28, 2012 by Mr HomeBuilder

    February 27, 2012, 7:56 PM EST

    By Liezel Hill

    Feb. 28 (Bloomberg) -- Newmont Mining Corp., the world’s second-largest gold producer, said it’s too early to say whether its proposed $4.8 billion Conga mine in Peru will proceed while a state-commissioned review is in progress.

    Consultants from Spain and Portugal hired by Peru yesterday began a 40-day review of an existing environmental impact assessment, or EIA. Greenwood Village, Colorado-based Newmont halted construction in November at the project in the northern Andes mountains following clashes between police and opponents of the development.

    “It’s too early to say” if the project will move forward, Chief Executive Officer Richard O’Brien said yesterday an interview in Hollywood, Florida.

    O’Brien said Conga must be a “viable” project to proceed. “I don’t think we can call that until we get through with the EIA review, assuming that happens in a reasonable period of time.”

    Conga may yield 680,000 ounces of gold and 235 million pounds of copper annually in its first five years. O’Brien said Jan. 17 that Newmont may increase spending on projects in Nevada, Australia, Ghana and Indonesia if it’s unable to continue developing the Peruvian mine.

    Newmont will seek “a balance between the EIA that we already have approved and whatever additions that the government thinks they need to make.”

    Reservoir Construction

    Under Newmont’s current plan, building Conga will require the construction of four reservoirs to replace four lagoons. That’s failed to win over farmers in the region, some of whom protested in November by blocking roads and destroying Newmont installations.

    The demonstrations stopped after President Ollanta Humala on Dec. 4 granted the country’s armed forces extra power for 60 days, including the right to make arrests without warrant.

    Newmont, which owns 51 percent of Conga, is partnering with Peru’s Cia. de Minas Buenaventura SAA on the project. The U.S. company also controls Peru’s Yanacocha, South America’s largest gold mine.

    “If we don’t have this done within the next three months, we are going to be extremely disappointed,” O’Brien said, referring to the review process.

    Newmont may consider selling its Hope Bay project in the Canadian Arctic, he also said. The company announced last month it would halt work at the site. Newmont said Feb. 23 it recorded a $1.61 billion writedown on the project. Hope Bay is relatively expensive to operate because of its location.

    ‘Opportunistic M&A’

    “Could it be worth something to somebody else? Yes,” said O’Brien, who was in Florida to attend BMO Capital Markets’ Global Metals & Mining Conference. “I think you’ve got the potential to see that district expand over time, but just not right now and not on our time frame.”

    O’Brien said he views $1,750 to $2,000 an ounce as a “reasonable estimate” for the gold price in 2012, and that the price may rise to $2,300 in the next three to four years. Gold futures for April delivery fell 0.1 percent to settle at $1,774.90 an ounce yesterday on the Comex in New York.

    Newmont’s strategy is to increase production through a combination of exploration, project development and “opportunistic M&A,” he said. He declined to comment further on the potential for acquisitions.

    Newmont is the second-largest gold producer ranked by revenue, after Toronto-based Barrick Gold Corp.

    --Editors: Simon Casey, Andrew Hobbs

    To contact the reporter on this story: Liezel Hill in Toronto at lhill30@bloomberg.net

    To contact the editor responsible for this story: Simon Casey at scasey4@bloomberg.net -0- Feb/27/2012 21:49 GMT

    Read the original post:
    Newmont Says It’s Too Early to Say Whether Conga Will Proceed

    Concepcion Carrier Posts P5-B Sales

    - February 28, 2012 by Mr HomeBuilder

    Concepcion Carrier Airconditioning Corp. (CCAC) has generated P5 billion in sales in 2011 with a dominant domestic market share of 45 percent.

    This was reported by CCAC CEO Raul Joseph Concepcion as the company celebrates its 50-year milestone as the number one cooling solutions provider in the country.

    Pioneering cooling solutions manufacturer Carrier has been declared the Philippines’ best-selling aircon brand of 2010 at the 7th annual GfK No. 1 Awards, a leading market research company GfK aims to recognize the top performing brands in several consumer product categories across Asia. Carrier emerged as the country’s top air conditioner brand based on GfK’s retail audit data as well as the brand’s unit sales in the category.

    The win is Carrier’s 6th award from GfK Philippines, having swept all the years that the GfK No. 1 Awards featured an air conditioner category. A renowned brand worldwide, Carrier is exclusively distributed locally by Concepcion-Carrier Air Conditioning Company, the premier name in cooling solutions in the country.

    Formed in January 1998, CCAC brings together two leaders in the air conditioning industry: Carrier Corporation of the United States and Concepcion Industries, Inc. of the Philippines.

    In just a few years, CCAC expanded from manufacturing window room air conditioners to becoming the market leader in virtually all categories of Heating, Ventilating and Air Conditioning (HVAC) equipment and services in the country.

    CCAC brings to the Philippine market Carrier Corporation's long tradition of innovation and product excellence. It has the Philippines' largest air conditioning facility that makes an wide range of products of outstanding quality, and is recognized by customers abroad, who source from it products proudly Philippine-made.

    Carrier products are designed in engineering centers and manufacturing facilities located worldwide. Spread across six continents, Carrier's global operations make it the largest manufacturer of air conditioning, heating, ventilation and refrigeration products. It is supported by a vast network of distributors, dealers, retailers, and technicians who sell, install and service Carrier products in over 170 countries.(BCM)

    More here:
    Concepcion Carrier Posts P5-B Sales

    The company is also finishing preparatory work on its ArtNorblin multifunction scheme in the capital

    - February 28, 2012 by Mr HomeBuilder

    Capital Park to launch Eurocentrum Office Complex in Ochota district

    The company is also finishing preparatory work on its ArtNorblin multifunction scheme in the capital

    Developer Capital Park will launch construction on its Eurocentrum Office Complex investment in Warsaw’s Ochota district in Q2 of this year. The scheme is scheduled to be completed in the second quarter of 2014.

    The company, which bought the plot for the scheme in 2007, plans to develop an office project comprising almost 70,000 sqm of leasable space on the land.

    The previous owner of the land planned a complex of several smaller office buildings for the plot, of which just one was completed. Capital Park has re-commercialized the existing facility and designed a new concept for the development of the rest of the property.

    Eurocentrum Office Complex will be a 15-floor building offering over 67,500 sqm of office and more than 2,400 sqm of retail-service space. The development will feature sustainable solutions and will, according to the developer, be the largest LEED CS Gold-certified office scheme in Poland.

    “We are in the process of selecting a general contractor for the investment. The planned date of the launch of construction is Q2 2012,” said Kinga Nowakowska, head of asset management, sales and marketing at Capital Park. She added that construction on the project is expected to take two years.

    Commercialization of space in Eurocentrum Office Complex is already underway, with Imtech having already leased more than 7,000 sqm in the development. That transaction was one of the largest in the Warsaw market in 2011.

    “We are in talks with many tenants whose names we cannot yet reveal as long as the deals are not finalized,” Ms Nowakowska said. She added that Capital Park had recently secured a preliminary financing decision from one of the largest banks in Poland.

    ArtNorblin progress

    Meanwhile, preparatory work is proceeding on Capital Park’s other major planned investment in Warsaw. The company’s ArtNorblin project in the Wola district has already received a planning decision from the City Hall, and the developer wants to apply for a building permit by the end of this year.

    The investment will be built on a plot that formerly housed the Norblin factory. It aims to both revitalize the post-industrial area by renovating the plant’s buildings and machinery and develop modern structures with commercial space.

    Work is still underway on devising a conservation program for the historical buildings that are located on the land. “Construction is scheduled to start in 2013 and finish in 2015,” Ms Nowakowska said.

    ArtNorblin will comprise a total of over 61,000 sqm of space, including approximately 22,000 sqm of retail-service and cultural space and 39,000 sqm of office space. The investment will include a museum dedicated to the history of the Norblin factory.

    According to Ms Nowakowska, the development is the most difficult investment in the history of her firm. She said that challenges included conservation issues, complex construction solutions, the combination of several functions in one project and integration of the scheme with the city.

    Established in 2003, Capital Park is mostly engaged in the development of office and high-street retail space. The company’s property portfolio currently comprises 72 assets totaling almost 309,000 sqm of completed and planned space, more than 80 percent of which is located in Warsaw.

    According to Emmerson Evaluation data, Capital Park’s property portfolio was valued at z?.1.12 billion as of December 31, 2010 and is expected to be worth z?.3.23 billion after the ongoing and planned projects are completed.

    From Lokale Immobilia by Adam Zdrodowski

    Advertisement

    Read more:
    The company is also finishing preparatory work on its ArtNorblin multifunction scheme in the capital

    Wuhan mulls tallest building in China

    - February 28, 2012 by Mr HomeBuilder

    Authorities in central China's Hubei province are mulling whether to "add height" to a building project, a move that would make it the tallest building in China upon its completion, Wuhan-based contractor Greenland Construction Group said Monday.

    The Wuhan municipal government initiated the adjustment plan in order to bring about a landmark building, according to a spokesman with the company.

    The Eco Tower Wuhan Center was originally designed to rise approximately 606 meters (1,818 ft) and house 119 stories, with a total floor area of around 3 million square meters. Based on initial plans, it would be the second-tallest building in China upon its completion in 2017.

    The adjustment may require its height to surpass that of the 632-meter Shanghai Tower, which is currently being constructed as the country's tallest building.

    The feasibility report on the possible changes to the initial plan is under further discussion, and the final decision has yet to be disclosed.

    The foundation for the building will be completed along China's Yangtze River belt in 2012, and construction has progressed smoothly since it began in 2010.

    Designed by Adrian Smith + Gordon Gill Architecture, the building will include a five-star hotel, an atrium featuring 360-degree views of the city and office buildings.

    Original post:
    Wuhan mulls tallest building in China

    Building construction halted after fatal accident in Vietnam capital

    - February 28, 2012 by Mr HomeBuilder

    Authorities in Hanoi Wednesday suspended the construction of a building after one worker was killed and four others were critically injured in a scaffold collapse the day before.

    Bach Quoc Viet, chief of the Labor Safety Office under the Hanoi Department of Labors, Invalids and Social Affairs, told Thanh Nien initial enquiries showed that the collapse started at the ninth floor of the Melberry Lane building in Ha Dong District.

    At that time, two groups of workers under two different sub-contractors were working at the same time: one was mortaring outside the building, and the other was installing glass windows inside, Viet said, citing reports from the project’s contractor, China State Construction Engineering Corporation.

    When the inside group finished their job, they took out some bearers on the scaffold, making it loose, the contractor said.

    In the end the scaffold collapsed, burying five workers who were walking under, it said.

    The victims were rushed to the nearby Military Hospital 103, but one of them died due to multiple injuries and brain trauma.

    Viet said this was just the report from the contractor, and that related agencies were investigating the case further before drawing final conclusions.

    When the accident happened, nearly 4,000 workers were working on the site and the main contractor was responsible for their general safety, he said.

    Meanwhile, Pham Van Trang, 28, one of the four survivors, told the VnExpress newswire that he was mortaring outside the seventh floor together with four other people when the accident happened.

    “The scaffolding was made of steel and quite strong. When I was working, I heard some noises and then the scaffold suddenly broke,” he said. “I had nothing to hold on to, so I fell down and lost consciousness.”

    Initial information is that work on the 14,000 square-meter building started in 2010 with a total investment of US$170 million from a joint-venture between Singapore-based CapitalLand Group and Vietnamese-owned Hoang Thanh Company.

    Read the original here:
    Building construction halted after fatal accident in Vietnam capital

    Nigeria: Suicide Bombers Attacked Governor's Church

    - February 27, 2012 by Mr HomeBuilder

    At least eight persons died Sunday following a suicide bomb attack on the headquarters of Church of Christ in Nigeria (COCIN), Jos, Plateau State, during the church's first service at 7.15am.

    Governor David Jonah Jang normally attends the second service which starts at 9am.

    An eye witness, Mr. Salvation Goshit, said three of the worshipers and one of the bombers died on the spot, while the other bomber who jumped out of the car before the explosion was lynched by angry youths.

    Three motorcyclists (Okada riders) were also reported killed near Hill-Station junction, when they fell into the hands of the angry youths, before the security agents took over the streets.

    Furthermore, the state Commissioner for Information, Mr. Yiljap Abraham, who was worshipping at the church during the attack, was mobbed by the youths when he tried to shield a soldier believed to have aided the bombers to gain entry into the church premises.

    Boko Haram has claimed responsibility for the attack.

    Meanwhile, Jang has appealed for calm, saying he knew that the enemies of the state were not happy with the prevailing peace there.

    Jang said: "I am not surprised that the church was attacked, because they know that is where I worship."

    He said government and security agents were taking every measure to ensure that worship places were adequately protected.

    He said: "If we are to riot, against whom would we riot? Let's ensure we sustain the existing peace."

    A church security guard at the gate, Mr. John Zafi, said at about 7.15am, he saw a Volkswagen Bora car turning swiftly into the church's compound, and before he could stop it, it rammed into the gate.

    "Fortunately, there was a motorcycle parked in the compound," Zafi continued. "The car ran into it, squeezed it, and dragged it along. This and the heaps of sand from the new church building that is under construction prevented the bombers' car from getting very close to the building where the people were worshipping."

    Another worshipper said he saw three persons in the car, one in military uniform, and the others in mufti.

    He said the one in uniform got out of the car before it rammed into the compound, adding that his presence in the car might have paved the way for the car to get to the church without being searched at the various checkpoints in the town.

    According to him, the youths wanted to attack the uniformed man when the commissioner prevented them, leading to an attack on the commissioner, who is now receiving treatment at a hospital.

    Reacting to the involvement of a suspected soldier, the member representing Jos South/Jos East federal constituency in the House of Representatives, Hon. Bitrus Kaze, said if it was true, "then it is a very sad development".

    COCIN headquarters church is where most of the bigwigs on the Plateau worship. Apart from the governor, others include former governor of the state, Chief Joshua Dariye, Chief Solomon Lar, Gen. Domkat Bali, Gen. John Timlong, and Gen. Joshua Dogonyaro.

    A press statement by the military Special Task Force (STF) in Jos said: "The suspected suicide bombers arrived the premises of the church in a Golf Car. The Improvised Explosive Devices exploded with one of the bombers inside the vehicle, while the other suspect that alighted and attempted to escape was killed in the process."

    The statement signed by the STF spokesman, Captain Mdahyelya Markus, said the explosion damaged some vehicles at the premises, but enjoined the citizens not to be lawless in their response.

    Also, the state Police Commis-sioner, Mr. Emmanuel Dipo Ayeni, who was at the scene of the explosion and at the hospital to see the victims, said investigations were on to unravel those behind it.

    At the Plateau Specialist Hospital, where the wounded victims were taken, a compound nurse, Mrs. Esther Gwotts, told journalists that two bodies were brought to the mortuary, while 38 persons are on admission.

    Other victims were taken to the Jos University Teaching Hospital (JUTH) for treatment.

    Part of the church's new building was badly damaged, and several cars had their windshields shattered.

    President Goodluck Jonathan last night expressed sadness over the bomb attack, saying the "indiscriminate bombing of Christians and Muslims is a threat to all peace-loving Nigerians".

    "Government is gradually and firmly bringing justice to those behind these attacks and exposing their identities and dismantling their terror infrastructure. Those behind similar acts of terror in recent times have been arrested and are being investigated with a view to prosecuting them accordingly, as a deterrent to others. President Jonathan appeals to all residents of Plateau State to remain calm and be law abiding. As we mourn with today's victims, let it be known that efforts are being redoubled to win the war against terror," a statement issued by presidential spokesman, Dr. Reuben Abati, said.

    The Jama'atu Ahlis Sunnah Lid Da'wati Wal Jihad, otherwise known as the Boko Haram sect, yesterday claimed responsibility for the bombing.

    Speaking with journalists on the phone, the sect's spokesman, "Abu Qaqa", said the suicide bombing was a reprisal attack against what he described as "Christian terrorist activities against Muslims".

    Qaqa warned that the sect would continue to carry out more of such attacks until Christians stopped their alleged atrocities against Muslims.

    He also claimed the sect was responsible for the attack on Gombe prison, explaining that the sect launched the attack to free Muslims detained in the prison over their protest against the mutilation of the "Glorious Qur'an" allegedly done by some security men deployed to the city.

    Qaqa also said the sect was responsible for the death of some Muslims who were shot while performing a congregational prayer in Kano, justifying the killing on the background that the slain Muslims assisted security men in arresting some of their members.

    He also in the interview said the recent burning of a primary school in Maiduguri was the handiwork of the sect, revealing that the sect's action was in reaction to an alleged razing of an Islamiyya school and the mutilation of the "Glorious Qur'an" by some security men in Maiduguri.

    He claimed that the attack of the school was not to kill the pupils and their teachers, but rather to warn the government that the sect would frustrate the progress of Western education if Islamiyya schools and Muslim's Holy Books were attacked again.

    He, however, called on the members of the public to continue to bear the hardship brought about by the sect's war on the government and security agencies, insisting that the end justify the means.

    Copyright © 2012 This Day. All rights reserved. Distributed by AllAfrica Global Media (allAfrica.com). To contact the copyright holder directly for corrections — or for permission to republish or make other authorized use of this material, click here.

    See the original post:
    Nigeria: Suicide Bombers Attacked Governor's Church

    First Baptist Church Nashville announces major expansion project

    - February 27, 2012 by Mr HomeBuilder

    Members of First Baptist Church downtown Nashville today voted to accept a master plan that includes the construction of a three-story building on Broadway that will house a Christian music venue and allow for an expansion of its ministries.

    The plan also includes a coffee cafe, a larger fellowship hall and additional parking.

    The building, which will border Bridgestone Arena, will allow for more overnight sleeping capacity for Room in the Inn, a shelter for the homeless that also offers computer classes, job training and rehabilitation. It will make room for a larger Clothing Closet, which gives clothes to people in need.
    Joe Fitzpatrick, the church's worship and music pastor, declined to put a dollar figure on the project, but said the master plan will be rolled out between now and the next 25 years.
    "We're hoping to accomplish as much as we can afford, as early as possible," Fitzpatrick said. "It's a matter of securing financing and working through the process."
    An implementation committee will work with designers and architects and put the plan in motion, he said.
    "We seek to serve as a lighthouse for those who are hurting and in need," Fitzpatrick said. "We are excited about the prospect of being a stronger voice in the community to meet the needs of people and do what churches are supposed to do."

    Originally posted here:
    First Baptist Church Nashville announces major expansion project

    Building's poor condition slowing demolition work

    - February 27, 2012 by Mr HomeBuilder

    By JOY BROWN

    STAFF WRITER

    Work to remove the top of the burned Argyle apartment building in downtown Findlay was slowed Sunday by the poor condition of the 122-year-old building.

    Service-Safety Director Paul Schmelzer said Alvada Construction Co. workers started shoring up the walls of the four-story building and dismantling the top floor Saturday night, and work continued Sunday.

    But the eastern top of the building, which officials are most concerned about because it is bowed out toward South Main Street, is crumbling, Schmelzer said. Its condition is forcing workers to remove small chunks of the building, using cranes.

    The building was more damaged by fire, water and the elements than originally thought, he said.

    The project's scope hasn't changed, but "it's become a little more difficult," Schmelzer said Sunday.

    Schmelzer also said high wind was expected to return Sunday night, which could force crews to halt what they're doing for safety reasons.

    Once most of the fourth-floor walls are removed, officials believe the building will be stable enough for investigators to enter and look for the cause of Thursday's fire.

    Schmelzer said he then hopes to get Main Street reopened, and allow access to the Argyle building by tenants and insurance adjusters, "sometime Tuesday afternoon."

    "This is not all great news, but we're progressing," Schmelzer said.

    A structural engineer hired by the city on Friday recommended the fourth-floor demolition. The roof fell in during the fire, and the upper walls are not connected to anything else. Below, "everything is still tied together" and structurally sound, Schmelzer said.

    Structural integrity has been compromised not just by the blaze, but by high wind and the large amount of water used to fight Thursday's fire. The water has been expanding and contracting as it freezes and thaws.

    "For the businesses under the Argyle (apartments), you can expect the worst" in terms of damage, Fire Chief Tom Lonyo told affected business owners over the weekend. "Over four million gallons of water were poured into that building and it all ran down."

    "Every day it (the structure) gets worse. As of (Friday) the building had moved again," Lonyo said.

    "This is a moving target," said Findlay Fire Investigator Eric Habegger. "We don't know what types of problems we're going to get into."

    Main Street, from Sandusky to Lincoln streets, continues to be closed.

    But some businesses on that part of Main Street are open, despite being within a barricaded area.

    They include: Bryant Shoes; Glass City Window and Door; the Heck Professional Building, which includes Jerry Payne Agency, Patti Baumgartner-Novak, Damon D. Alt, Bolotin Law, Charles Boyk, and AFLAC; the Arts Partnership; Ambrosia Tanning; Guitar Ranch; Dress for Less; Romans; Core Fitness; Northwestern Mutual; Central Marathon (accessible from East Lincoln Street); RCM Architects and Engineers; Ameriprise Financial; Elks Club; Trends on Main; Property Analysts; Main Street Deli; Massage Professionals of Ohio; the Blackford Building, which includes Moyer Financial Services, Bosse Financial Services, CBC Companies, Noggle Law, TFC Architects, Lisa Miller Law, and Golden Feather Photographic Art; Scrambler Marie's; Hancock County Probation Office; Eastman & Smith Law; and Chase Bank.

    Apartments above these stores and offices also remain open, according to the Findlay Fire Department.

    Brown: 419-427-8496

    Send an e-mail to Joy Brown

    Twitter: @CourierJoy

    Read more from the original source:
    Building's poor condition slowing demolition work

    Kitty Cats Blend in with the Grass, Kritter Kommunity Sdds a Green Kritter Kondo Deluxe to their Product Line

    - February 27, 2012 by Mr HomeBuilder

    Measuring 2.5 feet wide 6 feet long and 2 feet high, the Kritter Kondo Deluxe is ideal for patios, courtyards, decks, yards and balconies. The patent pending pin release makes the Kondo super easy to set-up and pawsitively a breeze to take down. A carrying case with three pockets and a zipper pouch is included with the Kondo, which fits purr-fectly inside. Designed to be portable, easy to store and water resistant, the Kritter Kondos are offering kitty cats an alternative to being cooped up indoors.

    Philadelphia, PA (PRWEB) February 27, 2012

    Wanting to giver her customers and kitty cats (Madison and Abigail) a variety of colors to chose from, Lisa has been adding a color or two a year to the products at Kritter Kommunity. Rolling out the Red/White Deluxe in 2010, the Pink/Pink quickly followed and has been a purr on the catwalk for many. Continuing the product enhancements, the Kritter Kondo Konnectors were born in order to lengthen the Kritter Kondo Deluxes and offer the ability to make a cat run. After receiving much feedback from customers, Lisa is rolling out the next color in the Deluxe family; the Kritter Kondo Deluxe green is now available.

    Measuring 2.5 feet wide 6 feet long and 2 feet high, the Kritter Kondo Deluxe is ideal for patios, courtyards, decks, yards and balconies. The patent pending pin release makes the Kondo super easy to set-up and pawsitively a breeze to take down. A carrying case with three pockets and a zipper pouch is included with the Kondo, which fits purr-fectly inside. Designed to be portable, easy to store and water resistant, the Kritter Kondos are offering kitty cats an alternative to being cooped up indoors.

    When President and Founder of Kritter Kommunity, Lisa Illman is asked why all the words are spelled incorrectly with a K instead of a C, Lisa laughs and says “Well, cats can’t spell of course! And mine (Madison and Abigail) have been quite influential in the launch and continued success of Kritter Kommunity. I just let them spell it as they wish.”

    A green Kritter Kondo Konnector 4 foot and 9 foot are expected to launch in 2013.

    For more information about Kritter Kommunity, visit http://www.kritterkommunity.com, follow them on Twitter @KritterKondo or Fan them on Facebook, keyword search Kritter Kommunity.

    About Kritter Kommunity:

    Kritter Kommunity was founded in 2009 by cat owner, lover and rescuer, Lisa Illman. Living in a condo, Lisa was tired of looking at her rescue cats, Madi and Abi’s sad faces from indoors while she was outside enjoying the sunshine. Lisa designed the first Kritter Kondo for her kitties, and was overwhelmed with inquiries from passers by. Lisa was surprised by the overwhelming need for outdoor solutions for indoor pets and Kritter Kommunity was born. To learn more about Lisa, Madi, Abi and Kritter Kommunity, visit http://www.KrittersthatTwitter.com.

    Safety: Do not leave your pets outdoors unattended. This outdoor cat enclosure is meant as a temporary setting only. It cannot protect your pets from predators. As with any outdoor pet product supervision of your pet when in use is recommended. These products are not toys and should not be used by infants or children, for domestic cats & dogs only, not for hybrids, ferals, wild animals or pets that chew.

    ###

    Lisa Illman
    Kritter Kommunications
    267 441 0167
    Email Information

    Original post:
    Kitty Cats Blend in with the Grass, Kritter Kommunity Sdds a Green Kritter Kondo Deluxe to their Product Line

    « old Postsnew Posts »ogtzuq

    Page 14,889«..1020..14,88814,88914,89014,891..14,90014,910..»


    Recent Posts