Categorys
Pages
Linkpartner

    Home Builder Developer - Interior Renovation and Design



    Page 14,934«..1020..14,93314,93414,93514,936..14,94014,950..»



    New York Seeks $2 Billion Federal Loan for Tappan Zee Bridge

    - February 15, 2012 by Mr HomeBuilder

    February 15, 2012, 9:59 AM EST

    By Freeman Klopott

    (Updates with revised loan size in first paragraph.)

    Feb. 14 (Bloomberg) -- New York state has applied for a $2 billion federal loan for construction of a $5.2 billion replacement for the Tappan Zee Bridge across the Hudson River, state officials said.

    Transportation Commissioner Joan McDonald said the state sent a letter of interest to the Federal Highway Administration and U.S. Department of Transportation, which administers a program that provides credit assistance for “regionally significant” infrastructure projects.

    “They’re reviewing it now,” McDonald said in an interview today after leaving a Cabinet meeting with Governor Andrew Cuomo in Albany.

    McDonald said during the interview that the loan request was for $3 billion, a figure later revised to $2 billion by her spokesman, Bill Reynolds.

    “The commissioner misspoke,” he said in telephone interview.

    Bloomberg News had asked Reynolds for a copy of the letter in a Feb. 6 e-mail. It wasn’t provided.

    Replacing the 56-year-old bridge, which carries 138,000 vehicles a day between Rockland and Westchester counties as part of the New York State Thruway system, is a priority for Cuomo. In his $132.5 billion budget, the governor didn’t identify a specific funding source, though said the new bridge would be financed with public money. The 54-year-old Democrat has compared building a new Tappan Zee to the construction of the Erie Canal in the 19th century.

    The three-mile-long (4.8-kilometer) bridge is estimated to cost $5.2 billion, with the price tag rising as high as $16 billion if public transportation projects are included. Loans through the Transportation Infrastructure Finance and Innovation Act, which McDonald said the state applied for in December, can be used only to pay for one-third of a project’s total estimated cost under current law. If New York is applying for the full amount, that would make the value of the project $6 billion.

    Short List

    Legislators in Washington are currently considering whether to increase the participation limit to about 49 percent of the total cost.

    “We’re following what happens in Congress very closely,” McDonald said.

    Fluor Corp., Bechtel Group Inc., Skanska AB and Grupo Dragados SA are part of four teams selected to bid on the project, the state said in a Feb. 7 statement.

    State officials have mostly been mum on financing plans. At today’s cabinet meeting, Cuomo said only, “We’re working on a financial plan.”

    New York’s Transportation Department hired Jeffrey A. Parker & Associates to develop a funding plan, according to a December announcement. The Philadelphia-based financing consultant specializes in public infrastructure projects and will help secure a federal loan, according to the firm’s website.

    Tifia loans are generally used for projects costing more than $500 million, last about 35 years and have an interest rate tied to U.S. Treasuries. As of Feb. 10, Tifia’s interest rate was 3.14 percent.

    Nancy Singer, a U.S. transportation department spokeswoman, said in an e-mail she couldn’t immediately comment.

    --With assistance from Martin Z. Braun in New York and Carol Wolf in Washington. Editors: Mark Schoifet, William Glasgall

    To contact the reporter on this story: Freeman Klopott in Albany, New York, at fklopott@bloomberg.net

    To contact the editor responsible for this story: Mark Tannenbaum at mtannen@bloomberg.net

    See the original post:
    New York Seeks $2 Billion Federal Loan for Tappan Zee Bridge

    New bites to try

    - February 15, 2012 by Mr HomeBuilder

    The fresh faces of 2012 try their hands at all kinds of cuisines, from barbecue to vegan, from an imported gelato to a New York-style pizza. One new restaurant lets you cook your own soup. Check them out.

    Less than a week old

    Say hello to these newborn restaurants!

    Gaijin Noodle + Sake House: Ramen bowls, hamachi paired with Okinawan yams fried into chips, and yakitori at a new concept from chef Antonio Friscia in a textured, trendy spot. 627 Fourth Ave., Gaslamp. gaijinsd.com

    The Kebab Shop: An expansion of the popular doner kebab business that first opened in the East Village in 2008. Beech and Union streets, Little Italy. thekebabshop.com

    Puesto Mexican Street Food: Grilled Mexican cuisine (huitlacoche tacos! delish) made to order at this fast-casual spot, as well as build-your-own rice bowls. 1026 Wall St., La Jolla. (858) 454-1260 or eatpuesto.com­­

    Casa De Luz

    Macrobiotic diets aren’t just for age-resistant celebrities (Madonna). Promoting an animal-free, gluten-free, ever-changing organic menu, this spacious Austin import is an update to an old Salvation Army building. It’s a vegan counterweight to North Park’s carnivorous obsessions (The Linkery, Carnitas’ Snack Shack). For breakfast, you might find a porridge of amaranth whole grains. For a three-course, $14.95 lunch, perhaps vegetable miso, roasted beets and onions, and green and black beluga lentils in a French dressing. There are nut-sauce accompaniments — “and sauce for the nut-intolerant,” adds owner Eduardo Longoria. Dinner’s also available, along with meal plans, macrobiotic cooking classes, and soon, organic beer and wine. Remember to compost your scraps when you bus your table. 2920 University Ave., North Park. Unlisted. casadeluz.org

    Cremolose

    Chef-owner Vicenzo Loverso (Origano) knows how to get Italian goods into the United States. Evidence: the imported, gelatolike cremolose he’s been loading patrons up with since January (with flavors like hazelnut, pistachio, peach, tangerine, strawberry). There’s also the imported beef bresaola in his paninis. And slow-roasted imported pork in his porchetta sandwiches. There’s room for stateside ingredients and traditional gelatos in the 5,000-square-foot Italian cafe, as well as fresh-baked cakes and specialty cocktails made with cremolose. Open until 4 a.m. on weekends. 840 Fifth Ave, Suite 100, Gaslamp. (619) 233-9900 840 cremolosesd.com

    Flippin’ Pizza

    Hey Cal State U. kids, Flippin’ is pointing at you. Located right across from the San Marcos campus, you’ll find a pizzeria cloning New York’s water for its pizza dough and cooking on pizza stones. “We want to be in the business of replicating the same New York pie I grew up with as a kid,” Flippin’ CEO Patrick Farley says. Two slices with a drink are $6. A bacon and jalapeño calzone is $12. Bring your study group some happiness by getting an airy, 18-inch, four-cheese pie (mozzarella, Parmesan, Gorgonzola, ricotta). Or hang out at this chain: They’ve added a bar and chopped salads like the artichoke and roasted red pepper. 342 South Twin Oaks Valley Road, San Marcos. (760) 736-3180 or flippinpizza.com. 4S Ranch location coming soon, and they’ve got a food truck; find them on Twitter at @FlippinPizzaCA.

    Continue reading here:
    New bites to try

    Lead Paint Hazards and Older Windows

    - February 15, 2012 by Mr HomeBuilder

    COLUMBUS, Ohio, Feb. 15, 2012 /PRNewswire/ -- If your home was built before 1978 and you still have the original windows, it's time to seriously consider replacing your windows --- especially if you have young children or a pregnant person living at home.

    (Photo: http://photos.prnewswire.com/prnh/20120215/NY52241)

    According to the Environmental Protection Agency (EPA), the routine opening and closing of windows in homes built prior to 1978 can disturb lead-based paint around the windows, causing paint dust and chips to be released into the air. These lead particles are so potentially dangerous that the EPA now requires contractors to be trained and certified before they can perform any renovation, repair or painting projects that may have previously applied lead-based paint.

    "Research indicates that the everyday activity of opening and closing windows creates friction that then allows invisible lead dust to enter the air," says Rick Nevin, a consultant to the National Center for Healthy Housing (NCHH). "Young children, who crawl on the floor where the lead dust has settled, can be especially at risk. Toddlers put their hands in their mouths … and after playing on the floor near a window, they can easily transfer the lead dust into their mouths. The ingested lead travels through the bloodstream to a child's developing brain, causing many types of neurobehavioral damage."

    According to Nevin, one of the most important long-term investments a homeowner can make for the overall safety of a family is to replace older windows, using the EPA-approved lead safe renovation guidelines. "Replacing older windows is one of the best ways to reduce lead risks," says Nevin. "Make sure to use only a contractor that is certified in lead-safe work practices and strongly consider the use of ENERGY STAR® qualified windows, like the vinyl replacement windows offered by Simonton Windows®. These windows are a healthy choice for replacing older single-pane units. They're energy-efficient and a good value for the investment."

    "At Simonton, we advocate that replacing older windows coated with lead-based paint with vinyl windows is a sensible step for homeowners who want to create a healthier home environment," says Gary Pember with Simonton Windows. "We believe Rick's research substantiates the replacement of all windows coated with lead based paint as a way to dramatically help reduce lead dust within that home."

    Nevin explains that, according to his research funded by the National Institute of Health (NIH), homeowners need to understand there are four key steps to completing a "lead-safe window replacement strategy" for the home. "First, they advise replacing all single-pane windows with ENERGY STAR qualified windows," says Nevin. "Second, stabilize any significantly deteriorated paint. Third, perform specialized cleaning to remove any lead-contaminated dust. And finally, perform dust wipe tests to confirm the absence of lead dust hazards after the clean up." Research results can be obtained at http://www.ricknevin.com/windows.html.

     

    Original post:
    Lead Paint Hazards and Older Windows

    East Bay’s Remodeling Contractor Mara Construction Celebrates 23rd Anniversary

    - February 15, 2012 by Mr HomeBuilder

    February is the anniversary month of East Bay’s Mara Construction. This local and general contractor, offering bath remodeling, kitchen remodeling, home additions and more, is celebrating 23 years of business.

    Orinda, CA (PRWEB) February 15, 2012

    Mara Construction, a general contracting company that offers services like bath remodeling, kitchen remodeling and home additions, is happy to announce that it has been successfully serving the East Bay’s needs for 23 years.

    “By offering excellent customer service and good communication with clients, we have been so successful that the majority of our business has come by referrals,” Anthony Maramonte of Mara Construction said. “We like using new technology and take the time to do the job right. We offer complete residential services, from foundations and structural repairs to trim and finish to tile work. I am always on the job site and in constant communication with homeowners.”

    Maramonte pays special attention to details, budgets and schedules and all of the staff at Mara Construction places emphasis on listening to the homeowner’s ideas. Great communication is crucial for a general contracting business. Maramonte also features extensive experience working with local architects and provides free estimates.

    Mara Construction, one of the most reliable remodeling contractors in East Bay, is a full-service general contractor that offers a variety of services, including kitchen remodeling, bath remodeling, home additions and general renovations. They also complete repairs for foundations (re-leveling, structural or drainage), retaining walls and electrical wiring. Other services include new custom builds, design and engineering, doors and windows, tiles and pavers, foundation repairs, custom wiring, and a myriad of remodeling services.

    For more information about any of Mara Construction’s services, call 510-385-8251, or view the company on the web at http://www.maraconstruction.com and http://www.remodelingcontractorseastbay.com. Mara Construction is located in Orinda.

    About Mara Construction

    Mara Construction provides prompt and efficient construction services at reasonable prices throughout the Bay Area because it believes that customers deserve reasonable prices for projects that will last a lifetime. Mara Construction takes pride in building and remodeling houses and guarantees that customers will remain happy and content living in a brand new or newly remodeled home.

    Mara Construction is a big enough company to handle any size job, yet a small enough company to give the customer the personal touch they deserve.

    ###

    Anthony Maramonte
    Mara Construction
    (510) 250-3770
    Email Information

    Read the original here:
    East Bay’s Remodeling Contractor Mara Construction Celebrates 23rd Anniversary

    Call for eco-friendly labels on construction materials

    - February 15, 2012 by Mr HomeBuilder

    KUALA LUMPUR: The Construction Industry Development Board (CIDB) is proposing an eco-friendly label on construction materials.

    The plan is part of the national eco-labelling scheme with the participation of the relevant certification bodies.

    "Eco-labelling has to be introduced to encourage the use and demand for environmentally preferable building products and construction methods and techniques," said CIDB construction technology and innovation development sector manager, Emasria Ismail.

    CIDB plans to come up with a document criteria for eco-labelling as part its strategic recommendations for improving environmental practices in the construction sector.

    It is learnt that CIDB has already developed document criteria for panel boards, carpets and wood composites.

    Speaking at the Green Construction Conference 2012 here yesterday, Emasria said the board was now finalising the document criteria for steel, with plans to kick start the pilot project in July.

    Meanwhile, Kaarin Taipale, a world expert in urban sustainability, said eco-labelling, or green labelling, was a good start in turning the industry green.

    She believed in the motivational instruments - sticks (regulations), carrots (incentives), and tambourines (measures to attract programme) - that she said were needed in getting the stakeholders to go green.

    "The carrot for contractors is very small, so we are thinking about that, too. However, the "stick" should be equally big, too. We must continue raising the benchmark," said Taipale, who is with Finland's Energy Ministry.

    The prime minister's office in Putrajaya would be a model of sustainable building, which can be easily emulated by others.

    The central administrative office is slated to undergo a refurbishing exercise to turn the property into an energy efficient building.

    Roger Frechette, who is instrumental in the sustainable designing of Burj Khalifa in Dubai, and in collaboration with KFM Holdings Bhd, is involved in the conceptual design that would help improve energy use at the prime minister's office.

    The plan is to reduce the building's energy use by 40 per cent from the current baseline use.

    The two-day Green Construction Conference 2012 conference brings together visionaries and leading companies in building technology, design and construction. The event is jointly hosted by the Works Ministry and CIDB.

    Read the rest here:
    Call for eco-friendly labels on construction materials

    Hungary construction sector edges down 0.8% yr/yr in December

    - February 15, 2012 by Mr HomeBuilder

    Output of Hungary's construction sector was down 0.8% in December from the same month a year earlier, the Central Statistics Office (KSH) said on Wednesday.

    Output of the building segment fell 11% year-on-year, while output of the civil engineering segment rose 12.5% in the twelve months to December 2011.

    In a month-on-month comparison, construction sector output declined 4.1% according to seasonally- and workday-adjusted figures in December after growing 7.3% in November. Output of the building segment fell an adjusted 5.6% from November and civil engineering output rose 0.9% from the previous month as output of organisations in the road and railway building segment rose more than 50% from an extremely low base, KSH noted.

    Construction sector output fell 7.8% in January-December from the same period a year earlier after a 10.4% decline in the full year of 2010.

    In the entire year 2011, output in the building segment fell 11.3% and output of the civil engineering segment was down 3.8%.

    New orders were up 10.5% in December from twelve months earlier in the second twelve-month rise registered since June 2010. New orders in the building segment rose for the first time since September 2010 and were up 10.4% from December 2010. New civil engineering orders were up 10.6% after rising at a similar rate in November, which followed four months of yr/yr declines.

    Total contracts held by the sector were still down by 42.5% yr/yr in volume terms as the stock of orders for buildings was down 46.9% and the stock of civil engineering orders dropped 39.7%.

    Hungary's construction sector output fell every year since 2006.

    Read more:
    Hungary construction sector edges down 0.8% yr/yr in December

    KONE to supply eco-efficient elevators to a new office building on Canary Wharf

    - February 15, 2012 by Mr HomeBuilder

    KONE Corporation, press release, February 15, 2012

    KONE has been selected to supply 25 eco-efficient elevators with supportive technologies to 25 Churchill Place in London, UK. This new high-rise office building in Canary Wharf will stand at a height of 128 meters once completed in late 2014. The office building is being developed by the Canary Wharf Group and the main contractor is Canary Wharf Construction Limited (CWCL).

    The order includes 22 KONE MiniSpace® elevators, of which 20 will be dedicated to transporting passengers and two for freight. MiniSpace elevators are especially suited to high-rise buildings. The other three elevators are KONE MonoSpace® Special, of which two can travel at the high speeds required for firefighting. These elevators, equipped with the energy-efficient KONE EcoDisc® hoisting machine, are 50-70% more efficient than elevators that use conventional traction two-speed or hydraulic technology.

    Working together with the elevators is the KONE Polaris® destination control system which will reduce waiting times for the office workers. There will also be KONE Infoscreen displays installed within each passenger car to inform and guide elevator passengers for smoother flow in the 26-floor building. The KONE E-link traffic monitoring system will ensure a high service level of the elevators.

    "We are delighted that our longstanding relationship with Canary Wharf Contractors has resulted in another order to provide People Flow® for professionals in this London financial hub," says Ari Lehtoranta, EVP and Area Director of KONE Central and North Europe.

    25 Churchill Place has been designed by Kohn Pederson Fox (KPF), the architects behind KONE`s Parisian reference Tour First. Previous KONE CWCL projects include the Citigroup Centre at 25 and 33 Canada Square.

    The order was booked in the first quarter of 2012.

    For further information, please contact:
    Anne Korkiakoski, EVP, Marketing & Communications, KONE Corporation, tel. +358 204 75 4775
    Michael Williams, Managing Director, KONE UK, tel. +44 8707748211

    About KONE
    KONE is one of the global leaders in the elevator and escalator industry. The company has been committed to understanding the needs of its customers for the past century, providing industry-leading elevators, escalators and automatic building doors as well as innovative solutions for modernization and maintenance. The company`s objective is to offer the best People Flow(TM) experience by developing and delivering solutions that enable people to move smoothly, safely, comfortably and without waiting in buildings in an increasingly urbanizing environment. In 2011, KONE had annual net sales of EUR 5.2 billion and on average 35,000 employees. KONE class B shares are listed on the NASDAQ OMX Helsinki Ltd in Finland.

    http://www.kone.com

    This announcement is distributed by Thomson Reuters on behalf of Thomson Reuters clients.

    The owner of this announcement warrants that:
    (i) the releases contained herein are protected by copyright and other applicable laws; and
    (ii) they are solely responsible for the content, accuracy and originality of the
    information contained therein.

    Source: KONE Oyj via Thomson Reuters ONE
    HUG#1585885

    View post:
    KONE to supply eco-efficient elevators to a new office building on Canary Wharf

    Vail seeks proposals for management of municipal site project

    - February 15, 2012 by Mr HomeBuilder

    VAIL, Colorado — The town of Vail is seeking proposals from qualified project managers related to construction of a new municipal office building at 75 S. Frontage Road. The project will include management of relocation logistics for temporary offices, plus coordination of architectural design, entitlements, construction document preparation, and construction and delivery of a new office building.

    The request for proposals is being issued following Town Council approval of an agreement with Vail Valley Medical Center and the Steadman Clinic to redevelop the site. The project includes construction of a medical office building on the west side of the property and replacement of the municipal offices on the east side of the site.

    Details of the request for proposals will be available on the town's website at vailgov.com in the public notices section beginning Feb. 15. Interested proposers must register with the Community Development for consideration by contacting Shelley Bellm at sbellm@vailgov.com.

    Proposals are due by noon on Feb. 24 with the project scheduled to begin on March 8. Construction is anticipated to begin in May 2013 and take approximately 21 months to complete.

    Excerpt from:
    Vail seeks proposals for management of municipal site project

    The Keyword Research Rabbit Hole

    - February 14, 2012 by Mr HomeBuilder

    A few weeks ago, I wrote about how to use your first meeting with a client to understand their business and collect information that could later inform your keyword research. Now, you’re back at your desk and wondering what to do with all that information.

    To begin with, you should have three lists of keyword-types (I call them seeds):

    Elements to include in keyword research

    Seeds most important to your clients (note that these may include jargon and industry-specific terms that need further research) Seeds that accurately describe the business (these would be your own layman’s terms for what this client does) Seeds that are not relevant or core to your client’s business

    I like to refer to these as seeds because they are a seed of an idea that could grow into giant “trees” of information and possibilities.

    There’s no need at this point to distinguish between “deck” and “decking” for example, and this is a mistake SEOs often make; trying to narrow the field too much too early.

    Let’s dive into each of these a little more deeply using an example of a client I did work for: Artisan Construction Services.

    Note that all of these lists have far more than 2-3 keywords on them, but for purposes of example, I’ve simplified them. This client is a local (to Raleigh, NC) remodeling company that specializes in building decks and screened porches and remodeling kitchens and bathrooms. (Those are my own words for List Two).

    The owner of the company, when asked to describe the product in his own words, said:

    “We provide decking, siding and window replacement, and interior remodeling.”

    Seeds most important to the client (based on the above description and the keywords he mentioned) are decking, siding, windows and interior remodeling. This would be List One above.

    Seeds that aren’t relevant (List Three above) are things the client prefers not to do or sub-contracts out, such as roofing (says he can never do it as cheaply as professional roofers), plumbing (he hates it) and highly specialized design work like tile inlays. He’s also not a licensed electrician. So these are keyword seeds to avoid.

    Example of Keyword Seed Lists

    List One

    List One is based on jargon, and requires further research. The first thing I do with keywords like this is to look at competitors’ websites. I’ve gotten a list of competitors from the client that I’ll research, and I’ll also put these terms into Google or Bing and look at the sites that come up in the results (I’ll localize to Raleigh, NC so that I’m getting the most accurate set of competitors).

    Reviewing these sites will give me more seeds to research based on that jargon. In this case, I found specific types of decking, such as composite and pressure-treated, and I found that many competitors also refer to screened porches as sunrooms or patios (which are slightly different, but may cover more potential customers).

    One additional thing the client told me is that customers often aren’t sure of what they want until they call him in for an estimate, so I’m keeping this in mind. Also during my research, I found another competitor in search that wasn’t mentioned as a major competitor. I’ll put this on a list of things to ask the client about in our next meeting.

    Example of List One Expansion based on Competitors research

     

    Next, I’ll look at how customers are actually referring to the different products and services.

    I’ll use the “related searches” area at the bottom of Google’s SERPs, Google Insights to look at trends, and the “Discussions” search option (click “More” under “Search” on the left side of a Google SERP page).

    Based on what I found here, I’ve learned that many people are asking what the differences are between screened porches and sunrooms, as well as that they’re sometimes referred to as lanais or three-season porches. I’ll add these seeds to my research.

    I also learned that many people are interested in enclosing an existing deck into a screened porch, or “winterizing” a screened porch. More seeds for my research.

    To review, I’ve taken the keyword seeds [screened porch], [patio], and [sunroom] and added:

    enclosing deck winterizing porch lanai three-season porch

    These are all things that my client’s customers are looking for that his competitors aren’t servicing. They should be easy wins.

    Example of List Two expansion based on Google "Discussions"

    List Two

    I can research List Two in much the same way I did List One. I’ll add these seeds to the research as well.

    List Three

    List Three is a little different from the others. I won’t add these as seeds to my research, but I will save them for the elimination and refinement process later.

    This is where instinct and experience becomes particularly useful, as it’s likely that I can take any list of keywords to avoid and expand it on instinct.

    For example, based on what I know of this client, he already wants to avoid roofing, plumbing, tile, and electrical. But here are a few more statements I jotted down at our meeting that give me more clues:

    “I’m not the best priced contractor out there, because I don’t hire any undocumented workers and I pay my taxes. But I am very experienced and my clients are always happy with my work.”

    Now I know I need to avoid [cheap], [free], [low-cost], [best priced], and other keywords like that. [Quality], [experience] and [ethical] are possible modifiers that are allowed.

    “I prefer to work with composite materials rather than pressure-treated lumber for decks. It’s much higher quality and creates a nicer finished product.”

    So it’s a good idea to focus on any searches asking for the differences between those materials. Also I’ll probably weight the research more heavily to different types and brands of composite materials.

    Another note I’m jotting down from this statement is to suggest the client create a page that discusses the pros and cons of composite vs. pressure-treated materials.

    “A lot of customers get a quote from a company like SEARS home improvement when they’re thinking about doing a remodeling project. This makes it tough for me because the materials that SEARS uses are limited to less-expensive ones. It helps me a lot if I can get a sense of a client’s budget beforehand; a single project can vary by thousands of dollars depending on the materials used. But of course, nicer materials create a nicer finished project.”

    I’m not exactly sure what I could take from this, but there are likely to be a lot of keywords related to home improvement and/or SEARS.

    I’ll be careful of those keywords and use something like Google Insights to determine if those trend higher at a certain time of year. I might even put them into a tool like ComScore to see if I can determine if people who search for [home improvement] related terms are in a lower income bracket. Of course, I also know I’ll have to avoid any keywords having to do with the television program of the same name.

    Example of expansion of List Three based on notes from the client meeting

    This is just the tip of the iceberg for keyword research. The proverbial “rabbit hole” can get very deep sometimes, so it’s important to make good decisions about which keywords to expand and which to keep at surface level.

    I’m sure at this point, you’re wondering why I haven’t mentioned Google’s Keyword Frequency Tool. Researching search frequency can be very useful, especially in determining how far to expand a certain keyword seed. For example, I found almost immediately that [lanai] has very low search frequency. So I didn’t spend a lot of time on it.

    Conversely, I found that [enclosing deck] is actually quite large, especially when viewed through Google Insights in the spring and summer months, localized to North Carolina.

    Ultimately, I’ll put all of these keyword seeds into the Google Keyword Tool to find the most highly searched combinations of keywords and an overall estimate of the search frequency of one service (decks) over another (window replacement). This will help me guide the client on what content should be created for the website.

    I prefer to do most of the research in the manner discussed above, and then use search frequency to refine, categorize and prioritize it. I have certain tools and formulas that I use to do that. Next time, I’ll give you these tools and explain how to refine what you’ve found and present it to your client.

    Thanks to Artisan Construction for allowing me to use them as an example.

    Opinions expressed in the article are those of the guest author and not necessarily Search Engine Land.

    Related Topics: How To: SEO | Keywords & Content | SEM Tools: Keyword Research

    Read the original here:
    The Keyword Research Rabbit Hole

    Ypsilanti Township to move forward with litigation in River's Edge townhouse case

    - February 14, 2012 by Mr HomeBuilder

    Sinking footings and porches detaching from buildings are among township officials' concerns at River's Edge.

    Tom Perkins | For Ann Arbor.com

    The Ypsilanti Township Board of Trustees on Monday approved taking legal action against the owner and receiver of a troubled townhome complex.

    Officials say both parties are ignoring township requests to address and reverse "deteriorating" conditions at the 162-unit River’s Edge Townhome complex, and, at their Feb. 13 meeting, the board unanimously approved giving staff authority to proceed with litigation.

    The property is located on Villa Drive near the intersection of LeForge and Clark Roads.

    Attorney Doug Winters told the board he had contacted the property’s mortgage holder, Citizen’s Bank, and the receiver charged with its maintenance and upkeep.

    Attorneys representing Citizen’s Bank contacted the township when officials were initially attempting to figure out River’s Edge’s ownership situation, but failed to commit to a meeting to discuss resolving the issues, Winters said.

    Without that meeting, he recommended the board approve court action as the next step.

    “At least when the board authorizes legal action it gets them talking and maybe they will now come to the meeting,” Supervisor Brenda Stumbo said.

    The township has issued two notices of violations to the property’s past owners and current management dating back to May 1. They allege a long list of problems and concerns. Among them are:

    Deteriorating and leaking roofs. Leaking windows. Missing siding. Missing trim. Deteriorating porches that are separating from the buildings. Sinking footings. Overflowing Dumpsters.

    “From what we can tell, nothing has been done at all to address the township’s NOV’s,” Winters said. “We have a lot going on over there and it’s not going to take care of itself by being ignored.”

    Citizen’s Bank took control of the property after the company’s last owner, Next Door Apartments - Villa Drive LLC, defaulted on the mortgage in early 2011. A Washtenaw County Circuit Court judge appointed Farmington Hills-based Finsilver/Friedman Management Corporation as the property’s receiver on June 1, and Finsilver/Friedman is now responsible for River’s Edge maintenance and financial management.

    Winters said the complex appears to have a high occupancy rate and questioned why tenants’ rent money isn’t going toward repairs. He said the items listed in the NOV are generally maintenance items but “important maintenance items” and he expressed particular concern over the sinking footings and porches detaching from the buildings.

    Next Door's mortgage dates back to 2007 in the amount of $5.6 million and records show it owes more than $307,000 in back taxes on the property.

    Finsilver/Friedman can either manage the property until the debt to Citizen’s Bank is paid off or sell the complex.

    “Staff, as well as our office, reached out in an effort to bring all the parties to the table to work out an agreeable timeline and an agreeable manner for proceeding, but if this is going to be difficult, then we are prepared to move forward as we have in the past,” Winters said.

    It’s one of several large cases the township is currently juggling. Staff has taken the first steps in the demolition process of the abandoned Liberty Square complex on Grove Road.

    A court recently ordered the owner of the partially abandoned Greenbriar Mobile Home Park to remove 14 mobile homes. Officials also recently learned of two more troubled mobile home parks on E. Michigan Ave. and Harris Road, which Winters described as “landfills” and has moved to the top of staff’s priority list.

    River's Edge is one of several problematic apartment complexes in the area. Neighboring Eastern Highland's ownership situation between jailed landlord David Kircher and Barnes and Barnes is in legal limbo. That has left several large buildings neighboring River's Edge vacant, though township building Inspector Ron Fulton said they are secure and safe.

    Across the street, Huron View Apartments, which is in the city of Ypsilanti, was hit with a rash of burglaries last year and management had refused requests by tenants for extra locks for protection.

    Continued here:
    Ypsilanti Township to move forward with litigation in River's Edge townhouse case

    « old Postsnew Posts »ogtzuq

    Page 14,934«..1020..14,93314,93414,93514,936..14,94014,950..»


    Recent Posts