Categorys
Pages
Linkpartner

    Home Builder Developer - Interior Renovation and Design



    Page 14,998«..1020..14,99714,99814,99915,000..15,01015,020..»



    $1.5B City Creek Center on schedule for March 22 opening

    - January 28, 2012 by Mr HomeBuilder

    Published: Friday, Jan. 27, 2012 11:26 p.m. MST

    SALT LAKE CITY — The clock is ticking toward the highly
    anticipated opening of Utah's top retail development.

    Fewer than 60 days remain until the scheduled March 22 grand
    opening of City
    Creek
    [1] Center, a
    $1.5 billion downtown project that is expected to revitalize
    Salt Lake City's central business district.

    Upon completion, City Creek will feature approximately 700,000
    square feet of shopping and dining space, along with 536 new
    condominiums or apartments. Among the unique features of the
    23-acre development are a 30,000-square-foot fully retractable
    glass roof, a sky bridge over Main Street and a re-creation of
    City Creek, the snow-fed stream that once meandered through the
    city.

    City Creek general manager Linda Wardell of Taubman Centers
    Inc. said the project is on schedule for its planned March
    opening.

    "The construction of the core (retail) building is really
    already complete," she said. "We've been (testing) all of our
    systems and know how they are going to operate."

    She noted that the individual retail stores are in their
    "crunch time" as they work to meet their own deadlines for the
    impending opening.

    "Usually, everything is simultaneously constructed," she said.
    "With City Creek, because of its mixed-used nature, the core
    part of our building was built first and then the stores were
    built in."

    Taubman will operate the retail portion of the project, which
    will contain approximately 80 stores and restaurants. Wardell
    said one-third of the stores at City Creek will be unique to
    Utah, which will "keep bringing people back over and over
    again."

    Headquartered in Bloomfield Hills, Mich., the company currently
    operates 26 retail shopping centers across the country, with
    six others in development — including properties in Asia and
    Puerto Rico.

    To date, Taubman has invested about $76 million into the
    project.

    The International Council of Shopping Centers has said that
    City Creek Center will be the only retail center opening in the
    U.S. in 2012, meaning the opening will likely garner national
    and even global attention, Wardell said.

    Inquiries have come from media worldwide to attend the grand
    opening as well as other retail developers from around the
    globe. One local industry analyst said the new development
    would likely help bolster the overall strength of the entire
    downtown retail sector, including The Gateway.

    "Retail growth will be slower at the beginning, but overall
    both projects will in time become thriving destination projects
    in the downtown area," said J.R. Moore, vice president of
    retail properties with commercial real estate firm CB Richard
    Ellis in Salt Lake City. "They'll fuel each other and make
    downtown an even more attractive place for shoppers and
    retailers."

    References

    1. ^ City Creek
      (www.deseretnews.com)

    Read the rest here:
    $1.5B City Creek Center on schedule for March 22 opening

    Cargo ship smashes into Ky. bridge

    - January 28, 2012 by Mr HomeBuilder

    (CBS/AP) 

    AURORA, Ky. - Kentucky's governor on Friday promised speedy
    work to begin replacing a bridge that partially collapsed when
    it was struck by a cargo ship hauling parts for a space rocket.

    Two spans (about 20 feet) of the Eggner Ferry Bridge at US 68
    and Kentucky 80 were destroyed Thursday night by the Delta
    Mariner, which was too tall to pass beneath the structure. No
    injuries were reported on the bridge or in the boat, which was
    carrying rocket components from Decatur, Ala., to Cape
    Canaveral Air Force Station in Florida.

    The ship was traveling on the Tennessee River on its typical
    route to Florida's Atlantic coast when it hit the aging steel
    bridge, which was built in the 1930s and handles about 2,800
    vehicles a day.

    Ship crash brings
    down part of Ky. bridge
    [1]

    Inspections by the Kentucky Transportation Cabinet have said
    that besides the sections that are missing, there is some
    damage on other spans andto the superstructure of the bridge,
    according to CBS affiliate WLKY
    in Louisville, Ky.
    [2]

    The U.S. Coast Guard is investigating the collision. And it's
    too early to speculate on exactly what caused the wreck until
    that probe is done, said Sam Sacco, a spokesman for ship owner
    and operator Foss Marine.

    Sacco said the boat was not severely damaged, and some of the
    crew remained on the ship Friday afternoon to make sure the
    cargo is safe.

    Gov. Steve Beshear on Friday said an immediate review of
    options to restore the bridge would take place.

    "We'll turn our attention to a full inspection of the bridge
    and determine what steps we can take next to speed up the
    replacement of that important artery," Beshear said.

    The 312-foot Delta Mariner hauls rocket parts for the Delta and
    Atlas systems to launch stations in Florida and California,
    according to a statement from United Launch Alliance, which
    builds the rocket parts in Alabama. The cargo was not damaged
    in the collision with the bridge, the company said.

    The rocket parts are used by the Air Force, NASA and private
    companies to send satellites into space, said Jessica Frye, a
    spokeswoman with United Launch Alliance.

    Sacco said the ship's typical route to Florida takes it along
    the Tennessee and Ohio Rivers, then onto the Mississippi River
    to the Gulf of Mexico and on to Florida's east coast.

    According to CBS Radio, four vehicles were on the bridge at the
    time of the collision.

    Robert Parker was on the bridge Thursday night and said he had
    to slam on his brakes when he saw a section missing ahead of
    him. He says two cars behind him did the same, one almost
    hitting his bumper.

    "All of a sudden I see the road's gone and I hit the brakes,"
    said Parker, who lives in Cadiz. "It got close."

    Parker said he stopped his pickup within five feet of the
    missing section. He said he didn't feel the vessel strike the
    bridge but "felt the bridge was kind of weak."

    Lt. Gov. Jerry Abramson and Transportation Cabinet Secretary
    Mike Hancock were visiting the crash area Friday, officials
    said.

    Transportation Cabinet spokesman Keith Todd told The Paducah
    Sun he believes most of the navigational lights were
    functioning on the bridge at the time of the impact. However,
    WLKY reported that a Coast Guard inspection revealed a few
    lights were out on Tuesday, and were only set to be replaced on
    Friday.

    The bridge opened in 1932, connecting Trigg County and Marshall
    County at the western entrance to Land Between the Lakes
    National Recreation Area. According to CBS affiliate WKYT
    in Lexington, Kentucky
    [3], about
    3,000 commuters use the bridge every day.

    The transportation cabinet said the bridge was in the process
    of being replaced, and preconstruction work began months ago.

    See the rest here:
    Cargo ship smashes into Ky. bridge

    Gov. Beshear and Sen. Paul make statements on bridge collapse

    - January 28, 2012 by Mr HomeBuilder

    Governor Steve Beshear today announced the immediate review of
    options for restoring the US 68/KY 80 bridge over Kentucky Lake
    after a large vessel struck the span last night and destroyed a
    main truss.

    Lieutenant Governor Jerry Abramson and Kentucky Transportation
    Cabinet Secretary Mike Hancock will visit the bridge today and
    talk with local officials about the investigation, alternate
    routing, and impact on nearby communities.

    "We are grateful that this wreck caused no injuries or loss of
    life. Since that bridge carries 2,800 cars every day, we were
    very fortunate that no one was on the span at that time," said
    Gov. Beshear. "We'll turn our attention to a full inspection of
    the bridge and determine what steps we can take next to speed
    up the replacement of that important artery."

    A cargo ship hit the bridge deck Thursday night, which
    collapsed across the bow of the cargo ship. The bridge was
    designed so that if it were struck, only portions of the
    structure would fail, not the entire bridge. Inspectors
    estimate the gap in the bridge to be approximately 300 feet
    wide.

    Search teams in boats from the Aurora Fire Department and
    Marshall County Rescue Squad found no indication that vehicles
    fell from the bridge when the vessel struck. The U.S. Coast
    Guard said the ship did not contain hazardous cargo.

    Inspectors and emergency responders from the Kentucky
    Transportation Cabinet (KYTC) rushed to the scene. KYTC
    engineers made a preliminary inspection and began an in-depth
    inspection this morning. They are evaluating the stability of
    the remaining parts of the bridge as well as assessing the
    damage.

    "We had already committed in our new six-year highway plan to
    replace this bridge, because we know what an important route it
    is for our citizens in western Kentucky," said Lt. Gov.
    Abramson. "We will shift our focus to determining how to
    restore that route as quickly and safely as we can."

    "At this moment, we're assessing the situation to see whether
    repair is feasible. We also will be exploring whether
    construction of the new bridge can be accelerated," said Sec.
    Hancock.

    The two-lane bridge - formally the Eggner's Ferry Bridge - is
    at the western entrance to Land Between the Lakes National
    Recreation Area. It opened to traffic in 1932. Its elevation
    was raised in 1943 when the Tennessee River was impounded to
    create Kentucky Lake.

    On average, the bridge carries approximately 2,800 vehicles
    across the lake per day. The Transportation Cabinet is in the
    initial phases of replacing the bridge, along with the nearby
    bridge over Lake Barkley on the eastern side of Land Between
    the Lakes. Preconstruction work, including geotechnical
    drilling, began months ago.

    "I appreciate the quick response by the Governor and Kentucky
    Transportation Cabinet to help this situation in western
    Kentucky," said Sen. Bob Leeper, of Paducah. "I look forward to
    working with them to explore all the available possibilities
    for a solution for the transportation needs of this area."

    "I encourage our citizens to remain calm and patient as our
    state transportation officials investigate the structure and
    determine next steps," said Sen. Ken Winters, of Murray. "I
    thank the Governor and Transportation Secretary for their
    immediate attention to this matter, and I hope that they will
    fully explore many alternatives, even temporary bridges, to
    best serve the people of western Kentucky."

    "I think Governor Beshear's plan for an immediate review of our
    available options is an excellent first step in getting this
    bridge back open," said Rep. Will Coursey, of Symsonia. "I have
    been working with House leaders to see what more we can do
    while we are in legislative session, and want the people to
    know that the General Assembly stands ready to act."

    With loss of the bridge, motorists will be advised to take
    alternate routes, such as Interstate 24 around the northern end
    of Land Between the Lakes.

    In reaction to the collapse of the Eggner Ferry Bridge in
    Western Kentucky Thursday, Sen. Rand Paul offered the following
    statement.

    "I am relieved that it appears no one was hurt in the accident.
    I have used the bridge many times and know how big of an
    inconvenience it will be for people to take the long way around
    the lakes. I will visit the bridge today to meet with local
    officials and find out what happened and what must happen to
    get the road reopened, and I will do what I can to help with
    this situation" Sen. Paul said.

    Sen. Paul will be traveling to the bridge site today.

     

    Read more from the original source:
    Gov. Beshear and Sen. Paul make statements on bridge collapse

    PA Swatara State Park Targeted for Trail Installation, Other Improvements

    - January 28, 2012 by Mr HomeBuilder

    To: ENVIRONMENTAL AND STATE EDITORS

    HARRISBURG, Pa., Jan. 27, 2012 /PRNewswire-USNewswire/ -- A
    long-awaited construction project that will see trails, parking
    areas and bridges installed at Swatara State Park in Lebanon and
    Schuylkill counties is now underway, the Department of Conservation
    and Natural Resources
    said today.

    "Long identified as 'undeveloped,' this gem of a state park
    comprised of woodlands and meadows straddling Swatara Creek is
    targeted for the type of improvements its visitors have
    requested," said DCNR Secretary Richard Allan. "Planned facility and
    infrastructure improvements will support and enhance day-use
    recreation that already includes canoeing, fishing, hiking,
    picnicking and bicycling."

    Work will include installation of 10 miles of crushed stone
    trails along an existing railway bed and a portion of abandoned
    Old State Road. A new trail and bridge near Sand Siding Road
    will connect the former rail bed and roadway. Another bridge
    will span Mill Creek on the rail trail.

    Four new trailheads, or parking areas, also are planned,
    affording easy access to the trails and launch areas for
    canoeing and kayaking.

    Financed through state capital budget funds, the $4.67 million
    project undertaken by Kinsley Construction of York County is
    expected to be completed by mid-July.

    State acquisition of lands that were to become Swatara State
    Park began in 1971 and was completed in 1987. Totaling 3,520
    acres, the state
    park
    was subject of numerous surveys, environmental
    assessments, Bureau of State Parks research efforts, and
    governmental and user-group committee studies. The input shaped
    the park's future and best utilizes its recreational potential.

    "With its increased network of trails and access to Swatara
    Creek launching areas, we see park visitation growing
    significantly," Allan said. "We know more than 84,000 visitors
    came last year to float and fish its waters and hike and bike
    its scenic woodlands."

    Park visitors are advised construction work may affect access
    to certain areas. Closings may be required along Old State
    Road/Bear Hole Trail, Rail Trail, the Lickdale Spur, and the
    boat launch near Swopes Valley Road. Mountain bike trails, the
    Appalachian Trail, and Waterville Bridge will remain open, as
    will sections of the rail trail. The Swatara Water Trail will
    require portage around bridge construction.

    Updated information can be obtained by contacting Memorial Lake
    State Park Office, 717-865-6470; or by email at memorialsp@pa.gov[1].

    Most of Swatara State Park is located along Interstate 81
    between Second and Blue mountains. An 8-mile stretch of the
    Swatara Creek Water Trail winds through the park, and two miles
    of the Appalachian Trail, which stretches from Georgia to
    Maine, cross its southern sector.

    Part of the Memorial Lake State Park Complex, Swatara Creek is
    a popular destination for canoeing, kayaking, and tubing
    enthusiasts, especially in the spring. Designated launches in
    the northern and southern ends of the park provide access to
    the creek for boaters.

    For more information on Swatara and Pennsylvania's other 119
    state parks, visit http://www.dcnr.state.pa.us[2]
    (select "Find a Park").

    Media contact: Terry Brady, 717-772-9101

    SOURCE Pennsylvania Department of Conservation and Natural
    Resources

    -0-

    References

    1. ^ memorialsp@pa.gov
      (news.yahoo.com)
    2. ^ http://www.dcnr.state.pa.us
      (us.lrd.yahoo.com)

    More here:
    PA Swatara State Park Targeted for Trail Installation, Other Improvements

    Double Hung Replacement Windows – Video

    - January 28, 2012 by Mr HomeBuilder

    19-01-2012 14:14 http://www.FindReplacementWindows.com Looking to replace the windows in your home? Double hung replacement windows may be the right choice for you! Let Renee from Renewal by Andersen teach you more about the features of double hung replacement windows, and the benefits of having double hung windows installed in your home! The double hung replacement window by Renewal by Andersen will bring a classic look to any home, and are quite easy to clean. Let Renee from Renewal by Andersen show you how double hung windows operate and function, and help you learn whether or not double hung replacement windows are right for you! To learn more about double hung replacement windows or other replacement windows in NJ, visit us at http

    Read more here:
    Double Hung Replacement Windows - Video

    Gilbert Glass Window Repair – Video

    - January 28, 2012 by Mr HomeBuilder

    22-01-2012 20:50 gilbertglass.com CALL US TODAY! (480) 892-1557 Gilbert Glass Window Repair Gilbert Glass is a licensed Bonded

    More:
    Gilbert Glass Window Repair - Video

    Window Replacement – A Wise Investment – Video

    - January 28, 2012 by Mr HomeBuilder

    27-01-2012 02:42 Detailed analysis of a window replacement project viewed as an investment. Discusses the financial benefits of replacing older windows with new energy efficient windows. Includes information about cash incentives and rebates, how they affect the overall window price, and how long it will take for an example window installation project to pay for itself through energy savings. This video is part of a homeowner education series developed by Windows Only, Inc, Portland, OR. 503-657-8439 For more information or to view other videos visit http://www.windowsonly.net This video can be viewed on our web site at http://www.windowsonly.net

    Originally posted here:
    Window Replacement - A Wise Investment - Video

    Tamara Browning: Mary Bryant Home raising funds for updates

    - January 28, 2012 by Mr HomeBuilder

    The MARY BRYANT HOME FOR
    THE BLIND AND VISUALLY IMPAIRED
    [1] has
    kicked off a three-year campaign to raise $250,000 for updates
    at the home, 2960 Stanton St.

    Among plans are to install a more energy-efficient heating and
    cooling system. New library materials and dining room furniture
    also are planned.

    The fundraising campaign officially kicked off with an Elvis
    Himselvis show sponsored by the home Jan. 7 at the Hoogland
    Center for the Arts. The show raised about $7,000.

    A total of $38,500 has been raised for the campaign so far,
    through the show, a chili supper and a Christmas appeal.

    The first of about three phases is under way to replace the
    home’s pneumatically controlled heating and air conditioning
    system with an electronic system.

    The home’s current system is original to the building, which
    was constructed in 1983.

    “The boilers are 2 million BTU boilers that they’re telling us
    are between 60 and 65 percent efficient. The new ones that
    we’re looking at are 92 to 93 percent efficient,” said JERRY
    CURRY, executive director. “The fuel savings alone there will
    be cost-effective.”

    With the pneumatic system, because each apartment at the home
    has separate thermostats for heating and cooling, there is a
    potential for mistakes to be made in climate adjustment. The
    heating and cooling could battle each other.

    “So, you have the air conditioner blowing air into their room
    trying to cool it down to 65 at the same time you’ve got the
    boiler trying to pump in 85-degree air to heat it up,” Curry
    said.

    New chairs and tables also are needed for the dining room, and
    new library materials are needed.

    “Some, not all, the Braille books that we have are 30- to
    40-year-old Braille books, and the bumps are starting to
    flatten out. We’ve been getting donations for new, large-print
    books and Braille books,” Curry said.

    The Mary Bryant Home has 38 residents. The home, which has a
    yearly budget of about $1.1 million, receives funds from
    residents’ rent payments and donations.

    “We’ve operated 65 years without state or federal funding,”
    Curry said.

    Donations can be mailed to Mary Bryant Home, 2960 Stanton St.,
    Springfield, IL 62703-4385 (make a note for the boiler fund or
    capital campaign fund). Credit card donations may be made by
    calling 529-1611.

    The SPRINGFIELD LOW VISION AWARENESS DAY will be held from 9
    a.m. to 2 p.m. Thursday, Feb. 2 at the home. Demonstration of
    products will be available. It’s open to the public.

    The home’s Low Vision Store is open to the public from 9 a.m.
    to 3 p.m. Mondays through Fridays. It offers items like
    large-print calendars, talking watches, talking kitchen items
    and canes.

    Charity Honor Roll

    FLIRTING FOR DISASTER, a benefit for the ILLINOIS CAPITAL
    AREA CHAPTER OF THE AMERICAN RED CROSS,
    [2] will
    be held from 6 to 10 p.m. Thursday, Feb. 16, at Erin’s Pavilion
    at Southwind Park, 4965 S. Second St.

    The event will be a cocktail party atmosphere with
    entertainment by the country band STILL
    KICK’N
    [3].

    A raffle and silent auction will be held.

    Tickets are $30 per person or $35 at the door. For tickets,
    visit il-redcross.org or visit the chapter office at 1045 Outer
    Park Drive.

    Tamara Browning is a columnist and feature writer for The
    State Journal-Register. She can be reached at 788-1534 or at
    tamara.browning@sj-r.com.

     

    References

    1. ^ MARY BRYANT HOME FOR THE BLIND
      AND VISUALLY IMPAIRED

      (www.marybryanthome.org)
    2. ^ ILLINOIS CAPITAL AREA CHAPTER OF
      THE AMERICAN RED CROSS,

      (www.il-redcross.org)
    3. ^ STILL KICK’N
      (www.stillkickn.com)

    View original post here:
    Tamara Browning: Mary Bryant Home raising funds for updates

    Another office building proposed in South Lake Union

    - January 28, 2012 by Mr HomeBuilder

    Originally published January 27, 2012 at
    5:40 PM | Page modified January 27, 2012 at 7:36 PM

    Developer Skanska USA has filed preliminary paperwork for a
    12-story office building on a half block in South Lake Union
    that it bought earlier this week.

    The building, on Fairview Avenue North between Harrison and
    Republican streets, would have about 339,000 square feet of
    office space, shops or restaurants on the ground floor, and
    four or five levels of underground parking, according to city
    records.

    Skanska acquired the one-acre property, now the site of a
    vacant warehouse, for about $11.6 million.

    Zoning now limits buildings on the site to 65 feet, about half
    what Skanska is proposing. But city officials are considering
    zoning changes for South Lake Union that would allow Skanska to
    construct an office building up to 160 feet tall.

    A Skanska spokeswoman said the firm, a subsidiary of a Swedish
    construction giant, hopes to start building next year, but
    couldn't say whether construction would start without a signed
    lead tenant.

    Skanska is the latest firm to join what has become a
    development stampede in Seattle's South Lake Union
    neighborhood.

    Amazon.com[1] is
    completing the last building in its 1.7-million-square-foot
    headquarters complex.

    Spear Street Capital of San Francisco recently broke ground on
    a 130,000-square-foot office/retail building, and Seattle
    developers Touchstone and Vulcan Real Estate are seeking
    permits for office projects totaling another 1 million square
    feet.

    UW Medicine is expanding its South Lake Union research center,
    and another 100,000-square-foot biotech building recently won
    city approval.

    Nearly 400 apartments are under construction in South Lake
    Union, and another 1,300 are in the pipeline.

    Eric Pryne: 206-464-2231 or epryne@seattletimes.com[2]

    References

    1. ^ Amazon.com
      (amazon.com)
    2. ^ epryne@seattletimes.com
      (seattletimes.nwsource.com)

    More:
    Another office building proposed in South Lake Union

    Charming New Bedford home steps from Buttonwood Park

    - January 28, 2012 by Mr HomeBuilder

    By

    January 28, 2012 12:00 AM

    QUICK FACTS

    19 Clarendon St.

    New Bedford

    Price: $245,000

    Style: Cottage

    Lot Size: .14 acres

    Living Area: 1,630 square feet

    Taxes: $3,060

    Listing Agent: Patti Conway, Anne Whiting Real Estate,
    508-944-7548

    Details

    Built in 1928

    Three bedrooms

    Two bathrooms

    Walk to Buttonwood Park

    Master suite

    Deck and patio

    Gardens

    Detached garage

    Sunroom

    Highway access

    NEW BEDFORD — Beautiful even in winter, the Home of the
    Week must be a sight to behold in warmer weather. The arts and
    crafts-style home has well-maintained gardens surrounding it.
    In the spring and summer, perennials fill the yard with color,
    complementing the shrubs and mature trees.

    "This is really nice in the summertime," said Patti
    Conway, the listing agent for the home with Anne Whiting Real
    Estate. "The gardens are gorgeous."

    The house has natural wood shingles and a new roof. In
    addition to the lawn, there is outdoor space in the form of a
    deck and two patios. The home is made all the more charming by
    its proximity to Buttonwood Park, which can be seen from the
    eastern side of the house and is only about 200 feet away. The
    house is also close to several highways, including Routes 6,
    140 and I-195. Past the yard, there is a detached oversized
    one-car garage.

    Inside, modern updates have been tastefully paired with
    some of the home's older features, such as the exposed
    whitewashed radiators and high baseboards. Add to this the
    current owner's simple, elegant d?cor, and the home takes on
    the cottage feel it exudes from the outside.

    The front door opens into a small hardwood floor foyer
    area, with stairs to the left and the rest of the home to the
    right. An open living room and dining room area lets in plenty
    of light with two sets of mullioned windows and a sunroom,
    which is positioned off the living area. From the sunroom, you
    can see the lilies that are out on the deck each spring, and
    the pond at Buttonwood Park is visible.


    Off of the dining area is the house's first bedroom. It
    has hardwood floors as well as built-ins and a closet for
    plenty of storage. A ceiling fan is another attractive feature.
    At the back of the house is a den which could also count as a
    bedroom, as it has a closet.

    Currently, the closet has the doors removed and is acting
    as an alcove for a television, which is another creative use
    for the space.

    Positioned next to the kitchen, this room could also be a
    dining room.

    A full bath with a corner cabinet and a window over the
    tub is a charming and relaxing spot.

    The kitchen has been updated to include some stainless
    appliances, modern cherry cabinets and plenty of counter space.
    It is large enough to be an eat-in kitchen if desired. A
    microwave is built in, and the stove is electric. Off the
    kitchen is a set of steps. Take a few steps down to access the
    side door and the deck. After this landing, continue down the
    stairs to the unfinished basement.


    "You can live on one level," Conway said.

    Two first-floor bedrooms will appeal to many potential
    buyers, though the second floor master suite is a major draw as
    well.

    The stairs near the front door lead to a private second
    floor master suite, which includes skylights and two closets,
    one of which is a walk-in. Across from the walk-in closet,
    there is an alcove that fits a sofa. The space measures about
    19 feet by 18 feet. It also includes a private bath with a
    walk-in shower, double sinks and a small octagonal window that
    adds light and style to the room. The bathroom closet holds the
    washer and dryer, although there are additional hookups in the
    basement.

    A winning location that is close to both peaceful
    recreation and major highways is the icing on the cake for this
    delightful home.

    "It's a charming house," Conway said.




    Reader Reaction
    We reserve the right to remove
    any content at any time from this Community, including
    without limitation if it violates the Community
    Rules
    . We ask that you report content that you in good
    faith believe violates the above rules by clicking the Flag
    link next to the offending comment. New comments are only
    accepted for two weeks from the date of publication.

    Not sure how to add your comment? Here's
    how
    [1][2]

    References

    1. ^ Community Rules
      (www.southcoasttoday.com)
    2. ^ Here's how
      (www.southcoasttoday.com)

    The rest is here:
    Charming New Bedford home steps from Buttonwood Park

    « old Postsnew Posts »ogtzuq

    Page 14,998«..1020..14,99714,99814,99915,000..15,01015,020..»


    Recent Posts