Home Builder Developer - Interior Renovation and Design
-
December 14, 2019 by
Mr HomeBuilder
One of Windsors worst street bottlenecks and longstanding complaints from the cycling community is finally being remedied with construction of a bike-pedestrian tunnel under a CN Rail overpass.
The area is in the heart of the citys major north-south thoroughfare on Dougall Avenue a four-lane artery that feeds traffic from Windsors southern suburbs into Ouellette Avenue and the citys downtown, and vice versa.
While there are paths and sidewalks north and south of the overpass, there are only a couple of dirt goat paths used precariously by cyclists and the occasional pedestrian located immediately beside the busy commuter route.
In fact, the bottleneck has been dubbed the Dougall Death Trap, mainly a cautionary description because no actual cycling or pedestrian deaths have occurred there in recent memory.
However, after years of lobbying by the cycling community and others, city council approved the project and a related one immediately north that will create a signalized intersection at a merging corner that in fact has been the citys top non-signalized intersection for motor vehicle accidents.
The underpass, with local Amico the contractor, comes in at $6.2 million, and the intersection, with nearby LaSalles Sterling Ridge undertaking the work, is $1.3 million. The two sites are located within what city planners officially describe as Windsors Central Box.
But it took many months of negotiations with CN Rail before work could begin. Thats because the roughly 30-metre long tunnel had to be cut at an angle under the busy CN track which sees back and forth shunting to the nearby Van de Water rail yard.
But instead of boring through the embankment engineers on the design-build project thought it more efficient to excavate from the top down to the ground.
To do this they had to temporarily remove over 30 meters of rail track. To impede train movements as little as possible this work had to be done in a marathon 48-hour weekend blitz. This occurred in late November when the rail line was shut down at noon on a Friday and re-opened Sunday night.
Crews used two-352 excavators and, for safety reasons, dug in a trapezoidal fashion from 33 metres wide at the top to a depth of eight metres and six metres wide at base.
Roughly at 12:15 p.m. we started excavating the material and hauling it to our dumping site and that roughly took about 6.5 hours, Amicos project manager Dan Krueger said. Some contaminated soil, expected after decades of railway use, was found and disposed of.
This was followed by the laying of a granular base which took about three hours. Then Amico installed the precast box culvert sections, which took about 20 hours.
The 14 sections 4.1 metres tall and six metres wide (with inside dimensions three metres tall by five metres wide) and manufactured by Anchor Concrete of Kingston, ON. were lifted into place by a 200-tonne crane.
We just rigged it up with some little hooks on the top and just move into place, Krueger said.
The final step was waterproofing with a rubberized membrane along with the installation of protection and drainage boards to prevent water intrusion. The water will drain along the sides to sub drains and then into roadside catch basins on Dougall Ave.
Meanwhile crews had already completed work building the 300-metre retaining wall along the CN embankment, separating the hill from the new multi-use bike and pedestrian trail which will flow from the tunnel.
The trail itself will be 3.5 metres wide bordered from the street by a one-metre wide stamped concrete buffer and separated from the retaining wall by a 0.75-metre concrete buffer. And the retaining wall varies in height between 1.5 metres and 2.5 metres with a 1.2-metre high railing on top.
We will have a one-metre stamped concrete buffer strip so it just provides a little delineation between the edge of the trail and the curb, City of Windsor project manager Paul Mourad said.
Much of the underpass and trail work will be finished this fall with at least a granular trail laid, with final paving work and an official site opening next spring.
And, a project discussed for decades likely will be well received by pedestrians and especially the cycling community. They heavily promote active transportation so theyll be happy when this is done, Mourad said.
Read the original here:
Construction of tunnel to end Windsor's 'Dougall Death Trap' - Daily Commercial News
Category
Retaining Wall | Comments Off on Construction of tunnel to end Windsor’s ‘Dougall Death Trap’ – Daily Commercial News
-
December 14, 2019 by
Mr HomeBuilder
Following Alton City Council meetings has never been the highlight of excitement in ones life. However, cruising through the minutes and the agendas of 11-23-2019s meeting, we can read that Altons City Councill has approved TEMPORARY shelters and warming centers for the homeless and I can honestly say I dont know if this is a topic of conversation every winter, or if its because our homeless population has increased so much in the past few years, that it now has to be a topic of discussion.
Either way, I find myself torn with the word temporary. If you put tape over a leaky hole in a dam, thats a temporary fix, it will not hold for any extended period of time, eventually it will give away to the pressure. If we give the homeless population a temporary place to hunker down this winter, thats a great start, but what about their futures? Can we actually help them to receive public assistance? SSI? Housing? Free cell phones? Help them become independent members of society.
No, we are not responsible for their choices in the past, but as productive members of society I think we have a duty to help those less fortunate. After all, we dont know what their fight is; maybe they are fighting addiction, domestic violence, mental illness, sickness or theyre runaways looking for a place where they can be accepted; in any of these cases we should make getting help easier. Theres a 6 months wait at Centerstone, one of the only places that takes state insurance and offers MAT for addicts wishing to be in recovery and cant go cold turkey, they have mental health counseling, possible housing, transportation and free phones for clients. Alton Memorial offers a three-day detox, but there is at least a weeks wait to get a bed and even then its not coordinated with any clinics around here. While we should be grateful to have those services it is nowhere near good enough.
Prime example: There is a man I see sitting at Centerstone every day on my way to work. He lives at night in a doorway of a church that is blocked from the wind, hidden from view, a dumpster on one side and a cold brick wall on the other. I run into him all over town, but every day he gets up at 6 am, rolls up his house and walks over to Centerstone. I asked him one day last summer, why are you always up here? he replied, I signed up for housing, and theres a years wait. I come here every day hoping today's the day I get in and dont have to sleep outside. Six months later I still see him there every day. It made me realize how much we all take for granted, the simplest of things like heat, a house, a car, money to buy food. The basic necessities that separate us from an animal chained up outside in the winter. It saddens me that instead of our city headed in a direction of rejuvenation, of small business and its people -we have tried to ignore this problem for too long. Spring, summer, and fall the homeless are fine, cooling centers? We had none. Cold weather hits, our neighbors across the river have warm-up St. Louis that really starts at the end of summer, here it is December and Alton has just now approved warm centers and temporary shelters.
Educate yourself and drive through upper Alton, downtown and middle town, at any time of day (not the housing projects). Perhaps youll see People walking and carrying their belongings, their houses, pushing shopping carts, huddled in the back of stores by the dumpsters trying to keep warm, sitting on benches with their backs turned to the world trying to be invisible, panhandlers, people searching trash cans, beggars for food and drug addicts nodded out at bus stops or on the sidewalks leaned up against trees and retaining walls. The number of homeless seems to multiply by 2 every month, and as this problem becomes more prevalent I believe its time for a more permanent solution than the City Council TEMPORARY relief.
We have space, the buildings, and even places that throw all cooked unsold food out at the end of the day instead of donating it, and many restaurants use this practice. There is so much waste in this town, a waste of food, material objects, money, houses and time. Someone in power needs takes control and do something constructive about the suffering this population faces.
Text @RB to 618-202-4618 to sign up for Text Alerts from RiverBender!
Print Version Submit a News Tip
Read the original:
Letter to the Editor: A Millennial Problem in This Old City - RiverBender.com
Category
Retaining Wall | Comments Off on Letter to the Editor: A Millennial Problem in This Old City – RiverBender.com
-
December 14, 2019 by
Mr HomeBuilder
Before long, we will be ringing in a new decade and celebrating the start of 2020. A great deal of progress has been made within and surrounding Murdo this past year. Major projects for the community in 2019 included new sidewalks, a new facility for Jones County Elementary School (JCES) and the state Highway 83 highway improvement project.
These projects serve the community well, contribute to the curb appeal and invoke civic pride. Now, the communitys elders can use their walkers on the sidewalks to safely go down the street. Parents send their children to a school knowing they are being educated in a safe and secure facility. For those who travel between the communities of Murdo and White River, South Dakota Highway 83 will offer a new, safe roadway.
Before the contractors began the sidewalk project, the city submitted grant applications to the South Dakota Department of Transportation (SD-DOT). The planning for this project began approximately seven years ago and encountered snafus in funding approval. Finally, the city received approval for a program that encompassed a variety of smaller-scale transportation projects such as pedestrian and bicycle facilities, recreational trails [and] safe routes to school projects.
Krysti Barnes, finance officer for the city of Murdo, noted the program entails a split of the total cost18% to the city, 82% to the stateestimated at approximately $560,000. Anderson Contractors, Inc., Ft. Pierre, received the contract for the total construction of the project that encompassed eight blocks, including a retaining wall located south of JCES. The elements of this unusually wet year, delayed the start and affected project progress.
Anderson formed and poured the sidewalks with crosswalks that provide a smooth transition to the street, sloping to street level with a safety traction approach. This project is a work in progress and brings a better quality of life to many residents. If the weather doesnt present significant delays, the projected completion of this project is the spring or summer of 2020. In the future, the city hopes to obtain funding to proceed with installation of more sidewalks, interconnecting the community and offering a safe way to walk through the community to visit or to just take a stroll with friends.
JCES staff and students recently moved from the old school into the new, 16,900 square foot facility. It is a gem for the community and will serve the educational needs of children today and future generations. The former school opened in 1965 during the age of George Jetson. The new school boasts technology similar to that seen in the treasured 1962 sitcom. The new JCES utilizes wireless network technology and a public address system featuring two-way intercommunications in each classroom. The fire protection system includes sprinklers, smoke and heat detectors in addition to the security of a locked down facility. A central foyer allows administrators to properly vet visitors before obtaining access to the building.
Concerns for integrity of the structure arose in 2013, prompting an inspection of the building. The findings indicated damage to the masonry block structure, a result of the nature of shifting soils within the region. After extensive planning, the Jones County School Board committed to a final design, secured financing and hired a contractor in June 2017. The contractor projected a completion date to coincide with the start of the 2019 school year but extreme weather conditions caused delays. Lorrie Esmay, JCES principal and superintendent for Jones County Schools, shared the positive comments as everyone enjoys the new facility noting that staff and students quickly settled into the new building.
In the entry hall, an antique bell is proudly displayed along with its history in the Jones county educational system. The first school, built in 1906, started as a humble, three room structure clad in tar paper. As the need arose for a larger school, a two-story, clapboard sided structure replaced the three room school house in 1909. The new JCES sits upon the site of the former 1909 two-story schoolhouse and the bell, used to summon children to school a century ago, is returned to its original location.
The next project consists of razing the old JCES to make way for a new playground. Asbestos abatement crews plan to remove hazardous materials and demolition is slated for the summer of 2020. The school plans to install playground equipment and fencing on the 50 x 200 lot. The brick from the old school will be sold to raise funds for new playground equipment and used to build a new JCES sign. The new JCES provides a wonderful facility for the staff and students of today and tomorrow.
The South Dakota Department of Transportation (SD-DOT) commenced with a paving project on state Highway 83 from Murdo to White River earlier this year. Zandstra Construction, Inc., Rapid City, received the contract spanning from Jones into Mellette county over the course of two years. Zandstra continued with work until the arrival of cooler weather. According to Doug Sherman, SD-DOT area engineer, the project progresses in phases and includes a new bridge and two box culverts on the Jones county side. On the Mellette county side, there are two new bridges spanning the Little White and Big White Rivers and one box culvert. An interim surface, consisting of milled asphalt and gravel, receives a primer coat, oiling the roadway in a petroleum based product, then it receives a blotter finish, consisting of a thickened chip seal finish.
Next spring, construction crews plan to apply a finished surface over the established roadway as the traffic compacts the interim surface over time with varying temperatures, providing a solid and well established base resulting in a better finished surface. The distance of the paving project is from Murdo to White River is approximately 20 miles.
These three projects brought improvements to the infrastructure of the community, offering a facility to educate its children and improving transportation between the two communities. Murdo plans to continue with improving its infrastructure, to actively seek funding for other projects and further commit to developing and investing within the community.
Read the original post:
Murdo Projects Improve Infrastructure in Transportation and Education - Philip Pioneer Review
Category
Retaining Wall | Comments Off on Murdo Projects Improve Infrastructure in Transportation and Education – Philip Pioneer Review
-
December 14, 2019 by
Mr HomeBuilder
Report Synopsis
XploreMRoffers a 9-year forecast for the foundation repair services market between 2018 and 2027. In terms of value, the foundation repair services market is expected to register a lower single-digit CAGR during the forecast period.
This study demonstrates the global foundation repair services market dynamics and trends across six regions: North America, Latin America, Europe, Japan, APEJ and MEA, which influence the current nature and the future status of the foundation repair services market over the forecast period.
Report Description
This research report provides a detailed analysis of the foundation repair services market and offers insights on the various factors driving the popularity of foundation repair services. The report includes an extensive analysis of the key industry drivers, challenges, trends and structure of the foundation repair services market.
The foundation repair services market study provides a comprehensive assessment of stakeholder strategies and imperatives for succeeding in the foundation repair services business. The report segregates the foundation repair services market based on the end user, service type and different regions globally.
The foundation repair services report starts with an overview of the foundation repair services market in terms of value. In addition, this section includes an analysis of the key trends, drivers and challenges from the supply, demand and economy side, which are influencing the foundation repair services market.
The foundation repair services market is classified on the basis of end-user, service type and region. Based on end user, the foundation repair services market is segmented into residential and commercial. Based on service type, the foundation repair services market is segmented into settlement repair, wall repair, chimney repair, floor slab repair and others (retaining walls, slope stabilisation, grouting and soil nailing).
A detailed analysis has been provided for every segment of the foundation repair services market in terms of market size analysis for the foundation repair services market across different regions. This section provides a detailed analysis covering the key trends.
The next section of the foundation repair services market report contains a detailed analysis of the foundation repair services market across various countries and regions across the world. This study discusses the key trends within countries, which are contributing to the growth of the foundation repair services market, as well as analyses the degrees at which the drivers are influencing the foundation repair services market in each region.
The key regions and countries assessed in this report include North America (U.S. & Canada), Latin America (Brazil, Mexico & the rest of Latin America), Europe (Germany, U.K., Spain, France, Italy & the Rest of Europe), Japan, APEJ (China, India, Malaysia, Singapore, Australia and the rest of APEJ) and MEA (GCC Countries, Israel, South Africa, & the rest of MEA). The foundation repair services market report evaluates the present scenario and the growth prospects of the foundation repair services market across various regions globally for the forecast period.
To offer an accurate forecast, we have started by sizing the current market, which forms the basis of how the foundation repair services market will grow in the future. Given the characteristics of the foundation repair services market, we have triangulated the outcome of different types of analysis based on the technology trends.
In the final section of the report, we have included a competitive landscape to provide clients a dashboard view based on the categories of providers in the value chain, their presence in the foundation repair services market and key differentiators. This section is primarily designed to provide clients an objective and detailed comparative assessment of the key providers specific to a market segment in the foundation repair services supply chain and the potential players for the same.
Key Segments
By End User
Residential
Commercial
By Service Type
Settlement Repair
Wall Repair
Chimney Repair
Get Sample Copy of this report at https://www.xploremr.com/connectus/sample/3940
Floor Slab Repair
Others (retaining walls, slope stabilization, grouting, & soil nailing)
Key Regions covered:
North America
U.S.
Canada
Latin America
Brazil
Mexico
Rest of Latin America
Europe
Germany
U.K.
France
Spain
Italy
Rest of Europe
APEJ
China
India
Malaysia
Singapore
Get Discount on this report at https://www.xploremr.com/connectus/check-discount/3940
Australia
Rest of APEJ
Japan
MEA
GCC Countries
Israel
South Africa
Rest of MEA
Key Companies
BASIC FOUNDATION REPAIR
Foundation Repair Services, Inc.
Connecticut Basement Systems
Erics Concrete & Masonry Services Ltd.
Dwyer Companies
Supportworks, Inc.
SOS Foundation Repair
GROUNDWORK
MASTER SERVICE COMPANIES
RAM JACK SYSTEMS DISTRIBUTION
ADVANCED FOUNDATION REPAIR
BDRY
Maryland Building Industry Association
ARIZONA FOUNDATION SOLUTIONS
DFW FOUNDATION REPAIR SERVICES
ESOG.
Buy Full Report at https://www.xploremr.com/cart/3940/SL
More:
Foundation Repair Services Market : Report analyzes the segments and provides the relative contribution to the development 2018-2027 - Weekly Spy
Category
Retaining Wall | Comments Off on Foundation Repair Services Market : Report analyzes the segments and provides the relative contribution to the development 2018-2027 – Weekly Spy
-
December 14, 2019 by
Mr HomeBuilder
Rescue personnel were busy Friday night responding to a series of accidents from Rennies Mill Road to Portugal Cove Road.
911 calls started coming in around 8:30 p.m. after a pickup truck had smashed into a utility pole. The driver, a man in his 40s, was out of the vehicle and walking around when rescue crews arrived. He was taken to hospital. He will be chargedwith failing to remain at the scene of an accident, police say further charges are anticipated.
The cap of the truck was located not far away. It appears it was ripped off the vehicle when it struck a brick retaining wall. Bricks and stones were thrown into the street.
Farther south a number of parked cars had been struck. The entire route from the parked cars to the trucks final resting place was littered with fluids and vehicle parts.
Continued here:
Driver charged after pickup truck leaves path of destruction through St. John's - NTV News
Category
Retaining Wall | Comments Off on Driver charged after pickup truck leaves path of destruction through St. John’s – NTV News
-
December 14, 2019 by
Mr HomeBuilder
Beautiful Brick 2 Story offering over 2,500 of finished square feet located on a cul-de-sac. This home has many updates & features incl: Wood floors, updated kitchen w/ granite counters, tile backsplash, under mount sink, island w/ breakfast bar & butcher block top, SS appliances, walk in pantry, built in coat bench, kitchen coffee bar/hutch, updated 1/2 bath on main, large great room w/updated WB fireplace, mf laundry, french doors leading to large deck & fenced-in yard w/ basketball court/patio, & oversized, rear entry 2 car garage. Upstairs is complete with 4 beds, 3.5 baths, & a loft perfect for a playroom or office. Wood floors throughout upstairs too! Updated master bath w/ plank tile flooring, separate whirlpool tub + shower. Master bedroom features crown molding and a walk-in closet w/ custom built in shelving. All this plus new roof 16, new windows 14. The basement includes a rough-in and is the perfect space for your custom finishes. Call today for your private showing!
View Listing
View post:
Homes Recently Listed in the St. Louis Area - Kenosha News
Category
Retaining Wall | Comments Off on Homes Recently Listed in the St. Louis Area – Kenosha News
-
December 14, 2019 by
Mr HomeBuilder
Photo by Earl Noble
The driver of a pickup truck left a trail of destruction after crashing multiple times last evening.
The driver of the truck, a man, was taken to hospital with unknown injuries after crashing his vehicle at least three separate times. The first collision, which happened on Rennies Mill Road near Bannerman Park, left a parked car with significant damage and debris strewn across the road. A third vehicle was also, struck, causing only minor damage.
A short while later the same truck left the road and crashed into a retaining wall at the intersection of Portugal Cove Road and Glenridge Crescent , sending stone flying and dislodging the cap from over the trucks bed.
Photo by Earl Noble
The truck finally came to a stop up the road at the corner of First Avenue and Portugal Cove Road, after it crossed oncoming traffic and collided with a telephone pole. The three separate impacts caused extensive damage to the vehicle.
A resident in the area reported hearing tires squealing prior to a loud bang, which was followed by squealing tires once again.
The driver, a man in his 40s, has been charged with failure to remain at the scene of an accident. Police say further charges are anticipated.
Photo by Earl Noble
Read this article:
Driver Charged Following Three Separate Crashes in St. John's - VOCM
Category
Retaining Wall | Comments Off on Driver Charged Following Three Separate Crashes in St. John’s – VOCM
-
December 14, 2019 by
Mr HomeBuilder
Cantilever walls are commonly built to retain soil or similar earth material to ensure the structural integrity of a project site. There are several important factors that need to be considered when designing a retaining wall using a cantilever block system.
When calculating the pressures exerted at any point of the cantilever wall during the design process, its important to consider factors such as the height of the water table, the nature and type of soil, the subsoil water movements, type of wall being constructed, and the materials used in the construction of the wall, all of which can have an impact on the stability of the structure.
Failure to do so can result in problematic outcomes post-construction including the wall moving into a sloping position or exhibiting a curve on its surface, appearance of a crack, or collapse of the entire wall. Consulting with a professional such as a builder or an engineer on the correct methods of preparation and installation is recommended.
The cantilever block systems from Baines Masonry Blocks deliver the structural integrity required to secure a project while providing an aesthetically pleasing design to suit any style.
Baines Masonry provides a one-stop-shop solution for all retaining wall needs, with a range of supplementary SRW products including geofabrics and other soil containing solutions.
Image: Mackintosh Photography
Read the original here:
Designing retaining walls using cantilever block systems - Architecture and Design
Category
Retaining Wall | Comments Off on Designing retaining walls using cantilever block systems – Architecture and Design
-
December 14, 2019 by
Mr HomeBuilder
Kitchen upgrades are among the most popular home improvements, and even a modest renovation will likely replace any outdated cabinets. When completing this work, it helps to consider the environmental impact of the project and what steps you can take to minimize any adverse effects.
Going green with this renovation won't just benefit the planet. Using the right materials can prevent glues and finishes from releasing unpleasant fumes into the home, thus improving the interior air quality.
Check the material to see if it bills itself as a more eco-friendly choice. Michelle Jeresek, writing for the home design site Houzz, says materials like particleboard and plywood are more likely to contain formaldehyde, which is carcinogenic and prone to off-gassing. Look for choices that are formaldehyde-free.
Similarly, some cabinet finishes or paints will give off fumes known as volatile organic compounds. Water-based finishes are preferable, as are finishes rated as having few or no VOCs.
When you use wood for your cabinets, there will naturally be some risk that you're contributing to deforestation. The home improvement site HomeAdvisor recommends that you look for wood that has been certified by the Forest Stewardship Council. This approval signifies that the wood used in the cabinet has been harvested using sustainable practices.
Consider environmentally friendly alternatives to harvested wood as well. Sage Builders, a company based in Newton, Mass., says one option is to use salvaged wood to create your new cabinets.
You can also opt for a more renewable wood source. Jeresek says bamboo has become a popular choice due to its durable quality and rapid growth. More recently, the engineered product Lyptusmade from a hybrid eucalyptus species that replenishes more quickly than traditional hardwoodhas been gaining ground.
Decide whether you want your cabinets to be made entirely from wood or if you just want to use wood veneer, which uses only a small amount of material to coat a substrate and give the appearance of a completely wooden product. HomeAdvisor says you could also preserve your old cabinets and give them a new look by repainting or refacing them.
Don't forget to keep green practices in mind when choosing hardware for the cabinets. Maureen Blaney Flietner, writing for the home improvement professional Bob Vila, says you can easily utilize recycled materials such as antique metal or glass knobs.
Environmentally friendly choices will often result in a bit of a higher price tag on the project. HomeAdvisor says the cost will be worth it, since you can enjoy a healthy and long-lasting upgrade to your kitchen.
Read this article:
Go green with eco-friendly kitchen cabinets - News from southeastern Connecticut - theday.com
Category
Cabinet Refacing | Comments Off on Go green with eco-friendly kitchen cabinets – News from southeastern Connecticut – theday.com
-
December 14, 2019 by
Mr HomeBuilder
Investors sentiment decreased to 0.98 in 2019 Q3. Its down 0.06, from 1.04 in 2019Q2. It worsened, as 32 investors sold The Home Depot, Inc. shares while 645 reduced holdings. 150 funds opened positions while 516 raised stakes. 731.21 million shares or 0.43% less from 734.39 million shares in 2019Q2 were reported.Stock Yards Comml Bank And Trust Com holds 2.37% or 111,840 shares. Mitchell Mcleod Pugh And Williams invested 2.2% of its portfolio in The Home Depot, Inc. (NYSE:HD). 1.61M were reported by Credit Suisse Ag. Osborne Prns Capital Mngmt Ltd reported 12,692 shares. Pure Financial Advsr Inc owns 0.17% invested in The Home Depot, Inc. (NYSE:HD) for 4,027 shares. Pictet & Cie (Europe) has invested 0.47% in The Home Depot, Inc. (NYSE:HD). 4,053 were reported by Fiera Cap. Barclays Public Ltd Com owns 1.66M shares or 0.24% of their US portfolio. 964,652 were accumulated by Envestnet Asset Mgmt Incorporated. Registered Advisor Inc stated it has 1.56% in The Home Depot, Inc. (NYSE:HD). Contravisory Inv Mgmt reported 342 shares. Rhumbline Advisers reported 2.04M shares. Connor Clark Lunn Mngmt Ltd accumulated 176,641 shares. Credit Agricole S A owns 83,487 shares. Torch Wealth Limited Company holds 1,758 shares.
Among 12 analysts covering Home Depot (NYSE:HD), 9 have Buy rating, 0 Sell and 3 Hold. Therefore 75% are positive. Home Depot has $26900 highest and $21300 lowest target. $237.38s average target is 10.88% above currents $214.08 stock price. Home Depot had 30 analyst reports since July 11, 2019 according to SRatingsIntel. The rating was maintained by Morgan Stanley on Thursday, August 22 with Overweight. The rating was downgraded by Gordon Haskett on Thursday, December 12 to Accumulate. Credit Suisse maintained The Home Depot, Inc. (NYSE:HD) on Wednesday, November 6 with Neutral rating. The stock of The Home Depot, Inc. (NYSE:HD) earned Neutral rating by Nomura on Thursday, December 12. Citigroup maintained it with Buy rating and $26900 target in Friday, September 13 report. The stock has Hold rating by SunTrust on Thursday, November 21. On Thursday, December 12 the stock rating was maintained by JP Morgan with Overweight. The firm has Outperform rating by Wells Fargo given on Tuesday, November 5. The company was maintained on Wednesday, August 21 by Credit Suisse. Nomura maintained it with Hold Neutral rating and $23700 target in Wednesday, November 20 report. Below is a list of The Home Depot, Inc. (NYSE:HD) latest ratings and price target changes.
12/12/2019 Broker: Wedbush Rating: Neutral Old Target: $230.0000 New Target: $225.0000 Maintain12/12/2019 Broker: JP Morgan Rating: Overweight Old Target: $252.0000 New Target: $241.0000 Maintain12/12/2019 Broker: RBC Capital Markets Rating: Outperform Old Target: $246.0000 New Target: $232.0000 Maintain12/12/2019 Broker: Nomura Rating: Neutral Old Target: $237.0000 New Target: $224.0000 Maintain12/12/2019 Broker: Gordon Haskett Old Rating: Buy New Rating: Accumulate New Target: $230.0000 Downgrade12/12/2019 Broker: Credit Suisse Old Rating: Neutral New Rating: Outperform Upgrade04/12/2019 Broker: BidaskScore Rating: Sell Downgrade25/11/2019 Broker: Morgan Stanley Rating: Overweight Old Target: $245.0000 New Target: $235.0000 Maintain21/11/2019 Broker: SunTrust Rating: Hold Old Target: $208.0000 New Target: $225.0000 Maintain20/11/2019 Broker: Nomura Rating: Hold Neutral Old Target: $240.0000 New Target: $237.0000 Maintain
The stock increased 0.96% or $2.04 during the last trading session, reaching $214.08. About 6.35 million shares traded or 54.15% up from the average. The Home Depot, Inc. (NYSE:HD) has risen 21.78% since December 14, 2018 and is uptrending. It has outperformed by 21.78% the S&P500.
The Home Depot, Inc. operates as a home improvement retailer. The company has market cap of $233.53 billion. It operates The Home Depot stores that sell various building materials, home improvement products, and lawn and garden products, as well as provide installation, home maintenance, and professional service programs to do-it-yourself, do-it-for-me , and professional customers. It has a 21.32 P/E ratio. The firm offers installation programs that include flooring, cabinets, countertops, water heaters, and sheds; and professional installation in various categories sold through its in-home sales programs, such as roofing, siding, windows, cabinet refacing, furnaces, and central air systems, as well as acts as a contractor to provide installation services to its DIFM clients through third-party installers.
More notable recent The Home Depot, Inc. (NYSE:HD) news were published by: Fool.com which released: Home Depot Inc (HD) Q3 2019 Earnings Call Transcript The Motley Fool on November 19, 2019, also Seekingalpha.com with their article: Home Depot: Still Great But Might Stagnate Seeking Alpha published on December 02, 2019, Investorplace.com published: A 10% Correction Might Not Be Enough to Get Investors Into Home Depot Stock Investorplace.com on December 05, 2019. More interesting news about The Home Depot, Inc. (NYSE:HD) were released by: Seekingalpha.com and their article: Home Depot: Another Dip To Buy Seeking Alpha published on November 21, 2019 as well as Fool.coms news article titled: If You Had Invested $1,000 in Home Depots IPO, This Is How Much Youd Have Now The Motley Fool with publication date: December 13, 2019.
Receive News & Ratings Via Email - Enter your email address below to receive a concise daily summary of the latest news and analysts' ratings with our FREE daily email newsletter.
See the rest here:
Were Analysts Bullish The Home Depot, Inc. (NYSE:HD) This Week? - The Lamp News
Category
Cabinet Refacing | Comments Off on Were Analysts Bullish The Home Depot, Inc. (NYSE:HD) This Week? – The Lamp News
« old Postsnew Posts »