Home Builder Developer - Interior Renovation and Design
-
March 1, 2017 by
Mr HomeBuilder
Kenneth Fosag of Des Moines works on the Confluence on Third apartment project in downtown Des Moines on Tuesday, June 21, 2016.(Photo: Rachel Mummey/The Register)Buy Photo
Des Moines' commercial real estate industry is still basking in healthy growth, with another strong year ahead, according to a leading market survey.
Rental rates for office and retail space are increasing, while apartment and warehouse construction continues to boom, the 2017 CBRE/Hubbell Commercial Market Survey reports.
"We're firing on all cylinders," said Kyle Gamble, senior vice president and managing director at CBRE/Hubbell Commercial. "We may be closer to the plateau than we were a year ago, but I think 2017 will be a lot like 2016."
The report provides anannual measuring stick for the local real estate industry. Here's a look at three trends highlighted in the report:
The office market has been characterized by slow and steady growth, said Bill Wright, a senior vice president with CBRE Hubbell Commercial.
Much growth is being driven by owner-occupied office expansions. EMC Insurance Cos., IMT Group, Holmes Murphy, Kum & Go, Hy-Vee, KeminIndustriesand Two Rivers Bank are all building or planning office expansions.
But the metro has seen some speculative office construction. R&R Realty is buildingan 180,000-square-footoffice at Country Club Plaza in West Des Moines, and new office buildings are planned in downtown's Gray's Landing area and in Ankeny's Prairie Trail.
Employee recruitment and retention are the biggest factors driving office development, Wright said.
"Right now, it's about creating an office culturewhere their employees are excited to come to work and will want to stay, so they can retain those employees," he said.
Rental rates for office space have been steadily increasing, and landlords have begun requiring annual escalators, or yearly increases in rental rates for tenants, Wright said. Annual escalators make Des Moines-area office space more attractive to outside investors and, as aresult, have driven up the value of local office space.
"It's been a huge change for our market," he said.
MORE:Des Moines-area renters may finally be getting a break
Small retail centers and strip malls have been popping up around the metro, too. Tyler Dingel, a first vice president with CBRE/Hubbell Commercial, says there are at least 36 of such retail projects under construction or being planned.
"I don't expect all of those to be built. In fact, if 50 percent of them get built, that would be a lot of space to add to our market at one time," he said.
Much of the growth is being driven by demand for quick-serve restaurants (think Chipotle, Five Guys Burgers, Potbelly Sandwich Shop), fitness centers and experience-related retailers like golf simulators and painting studios, Dingel said.
Owners of retail space are also charging higher rents than ever seen in the metro area, he said.
The development of neighborhood retail centersisevidence that the Des Moines real estate market is in a growth cycle, Gamble said.
"Retailers are aware that the consumer is very active and confident today and that drives retail tenants to want to expand," he said.
Gamble said the sector with the most room for growth is the warehouse market.
Developers have added nearly 2 million square feet of warehouse space in the past two years, according to the report, and Gamble said there is demand for more.
"The supply has been fairly conservative and, for the most part, has been absorbed," he said.
Nearly 1 million square feet of warehouse space will be under construction in 2017, according to the report. The projects are concentrated in Ankeny and around Highway 141, near Grimes.
E-commerce is indirectly driving the demand for warehouse space, Gamble said. While Amazon and other online retailers have not opened facilities in Iowa, the growth of e-commerce affects the entire supply chain, creating demand for suppliers, distributors and third-party logistics companies, he said.
Warehouse owners are also seeing demand from less conventional users. Recreation businesses, such as gymnastic studios, trampolinecentersand batting cages, are leasing warehouse space.
Office tenants also arefindingusesfor warehouse space. Hy-Vee is leasing 130,000 square feet in Grimes to create a hip office for its technology and creative staffs.
Read or Share this story: http://dmreg.co/2mCjKKM
Original post:
Des Moines real estate 'firing on all cylinders,' survey says - DesMoinesRegister.com
Category
Office Building Construction | Comments Off on Des Moines real estate ‘firing on all cylinders,’ survey says – DesMoinesRegister.com
-
March 1, 2017 by
Mr HomeBuilder
Indianapolis Mayor Joe Hogsett has selected the site of the former Citizens Energy coke plant at 2950 Prospect St. for a new criminal justice center.(Photo: James Briggs / IndyStar)Buy Photo
Construction of Mayor Joe Hogsett's proposed criminal justice center could cost up to $575 million, according to figures released by the city.
Hogsett'scriminal justice task force on Tuesday recommended a four-building campus, includingan assessment and intervention facility, a consolidated county jail, a courts building and an office building. The campus is slated to be builtat the former Citizens Energy coke factory siteat 2950 Prospect St. on the east side.
The estimated construction price tag for Hogsett's plan ismore than $160 million higher than a similar proposal from former Mayor Greg Ballard. Ballard in 2014 called for a criminal justice center at the former General Motors stamping plant site that would have cost $408 million to build. Ballard's plan had an overall price of $1.75 billion thatincludedthe price ofinterest, maintenance and day-to-day operations.
Democrats on the City-County Council criticized Ballard's plan as unaffordable, and itdied in 2015. Joey Fox, executive director of the Marion County Republican Party, said the county will end up paying morefor a new jail because of rising interest rates.
"Once the mayor provides enough details, the taxpayers can do an honest analysis," Fox said. "There's a lack of transparency in the numbers he's providing because they're not an apples-to-apples comparison."
But Andy Mallon, corporation counsel for the city,emphasized that Hogsett's plan is still forming.
"We're at fundamentally different stages in the process," Mallon said. "We're talking about estimates. They got all the way down to bids. We anticipate, once we get this project out on the street and bid, it willbe a different project."
The latest proposal is more comprehensive than Ballard's, Mallon added. Hogsett's plan includes a 70 percent larger courthouse, including civil, criminal and juvenile courts, he said.
"They didn't have any sort of estimates for what it would cost to move the crime lab or coroner," Mallon said.
City-County Council President Maggie Lewis, a Democrat, said in a statement that the council is "continuing to examine our processes for managing our criminal justice system."
"I support the work being done by the task force and look forward to our discussions about their recommendations of how we finance and construct the new justice center," Lewis said. "There is still a lot of work to be done.This is a lengthy process, but I am confident that we will create a campus that will meet the needs of our community."
The Hogsett administration has yet to say how the county would pay for a new criminal justice center. The county is scheduled to release financing details by the end of March.
The task force estimatesa new criminal justice center would save county offices at least$35 million a year that could be used to pay for development and construction of the campus over 30 years.
Under Ballard, the county spent more than $16 million on studies and planning in an effort to move the countyjail out of Downtown. The county might reap at least some benefits from that spending. The Hogsett administration has retained HOK, an architecture and engineering firm that worked on the Ballard plan.
"HOK drafted the original (requests for proposals) for that project and gained a great deal of familiarity with project cost estimates, as well as space and other requirements of the project," the criminal justice task force said in a memo.
The construction estimate does notinclude an office building for the prosecutor or public defender, which eventuallycould be part of the campus. The price tag also excludes an estimated $74 million cost for "off-site renovation projects for other agencies," according to the memo.
Judges in the Marion County court system have yet to announce whether they would move their operations to the proposedcriminal justice center. Judges have until May 1 to decide whether they want to move from Downtown to theTwin Aireneighborhood.
Call IndyStar reporter James Briggs at (317) 444-6307. Follow him on Twitter:@JamesEBriggs.
Read or Share this story: http://indy.st/2m5ESef
See the rest here:
New Marion County jail could cost $575M - Indianapolis Star
-
March 1, 2017 by
Mr HomeBuilder
Category
Office Building Construction | Comments Off on Fresno-area office building sales and leasing hit highest volume in a decade – Fresno Bee (blog)
-
March 1, 2017 by
Mr HomeBuilder
Rockports Planning Board will begin its review March 1 of a new physicians building proposed for the Pen Bay Medical Center campus on Route 1 in Rockport. The two-story, 41,566-square-foot building has been sited for the northwest corner of the 63-acre hospital parcel, just southwest of the Sussman House, on Glen Cove Drive.
The meeting begins at 5:30 p.m. at theRockport Opera House meeting room.
Preceding the meeting, the board will conduct a 5 p.m. sitewalk at Camden Glass, at the corner of routes 17 and 90, in West Rockport, where that business wants to add a new used car sales area to its existing parking lot.
The physicians building is designed by SMRT Architects and Engineers, the Portland-based, privately-owned company with offices in Virginia, New York, New Jersey, New Hampshire and Massachusetts.
With a proposed footprint of 20,888 square feet, the medical office building is positioned in an area of undeveloped woods with southerly slopes toward the ocean. There will be no clearcutting, according to the plans on file at the town office.
According to Rockport zoning, the parcel is in the townsSection 909 Hospital and Resort district.
Plans call for the building to contribute approximately 1,700 gallons per day of wastewater to the sewer system that runs to the City of Rockland.
In 2011, the average daily flow to Rockland was 82,313 gallons per day, and Rockports current agreement with Rockland allows the town to send 100,000 gallons per day to the Rockland sewer treatment plant.
Of the current average flow, Pen Bay Medical Center sends approximately 32,376 gallons per day to Rockland.
According to the plans filed at the town office, construction of the new physicians building will entail some blasting.
The engineers are also pursuing permits from the Maine Department of Environmental Protection (air license amendment and a Natural Resources Protection Act amendment), the Department of Transportation, and the U.S. Army Corps of Engineers (Tier 2 Wetlands permit).
Originally posted here:
Plans for new Pen Bay Medical Center office building to get reviewed - PenBayPilot.com
Category
Office Building Construction | Comments Off on Plans for new Pen Bay Medical Center office building to get reviewed – PenBayPilot.com
-
February 28, 2017 by
Mr HomeBuilder
In forecasting offensive success, a key indicator is returning rushing yardage from the previous season. Last year Alabama had 639 runs for 3,675 yards (5.8 yards per carry, 33 touchdowns, and 245.0 yards per game. Take out the rushing yards of men who are not returning and the Crimson Tide returns 96.4 per cent of that rushing yardage, 3,542 yards, and 32 of the 33 rushing touchdowns. The average per rush from those returning is 5.9 yards per carry and 236.1 yards per game. Not all of that came from the tailbacks. Quarterback Jalen Hurts was Bamas second leading rusher with 954 yards. He had the most carries (191) and TDs (13). But the tailbacks did their part. Damien Harris (5-11, 214, Jr) was Alabamas leading rusher with 146 carries for 1,027 yards (7.1 per rush) and had 2 rushing touchdowns; Bo Scarbrough (6-2, 228, Jr) was third with 125 carries for 812 yards (6.5 ypr) and 11 TDs; Josh Jacobs (5-10, 204, So) fourth with 125 for 812 (6.7 ypr) and 4 TDs; and B.J.Emmons (6-0, 206, So) fifth (in just 7 games before being injured) with 325-173 (4.9) and 1 touchdown. Thats a pretty good base at tailback. This is part of a series looking at all Alabama positions prior to the start of spring drills. In addition to those, Bama returns all-around athlete Ronnie Clark (6-2, 215, Jr), who is listed as a tailback but can also play other positions, and walk-on Avery Reid (6-0, 192, So). Moreover, there is much interest in three true freshmen, signees who entered The University this semester and will be taking part in spring practice. Najee Harris, 6-2, 225, was ranked the nations No. 1 overall prospect regardless of position. Brian Robinson, 6-1, 224, was a star at Hillcrest High in Tuscaloosa. Chadarius Townsend, 6-0, 190, is considered an all-round athlete capable of playing several positions, but is expected to start spring with the tailbacks. Under Assistant Coach Burton Burns, Alabama has had excellent success from the tailback position in the Nick Saban Era. Notably, in the past 10 years Bama has had two Heisman Trophy winners in tailbacks Mark Ingram (2009) and Derrick Henry (2015). Alabama will have its fifth offensive coordinator (not counting one-gamer Steve Sarkisian) this year as Brian Daboll comes in from the New England Patriots. But as Saban has said in the past, a new coordinator doesnt come in to run his offense; he comes in to run the Alabama offense. That offense has changed in recent years and last year quarterback became a running position with the arrival of Hurts, who returns for his sophomore year. Although Hurts will have competition, the offense is not expected to have significant change. The running backs also benefit from a talented offensive line that returns three starters. There are some injury issues going into the spring. Scarbrough suffered a broken leg in the College Football Playoff National Championship Game. Although he has had several injuries in his football career, he has also proved to be a fast healer. Emmons missed the last half of the 2016 with a foot injury. Najee Harris played his senior year with a partially torn meniscus and had a procedure to repair it after arriving at Alabama. It remains to be seen how much (if any) these players will be limited in spring practice.
Excerpt from:
All Alabama tailbacks return for spring practice along with additions - Scout
Category
Second Story Additions | Comments Off on All Alabama tailbacks return for spring practice along with additions – Scout
-
February 28, 2017 by
Mr HomeBuilder
Category
Second Story Additions | Comments Off on Knicks Get Younger in a Hurry, but Aren’t Quick to Abandon Playoff Hopes – New York Times
-
February 28, 2017 by
Mr HomeBuilder
Miguel Gonzalez had 12 family members in attendance for his first Cactus League appearance of the year Sunday.
He posed for pictures on the field before the game and even gave his grandfather a tour around the training facility at Camelback Ranch.
"I showed him around a little bit, and he was excited," the White Sox pitcher said. "He was like a little kid when they go in for some candy."
Gonzalez expects many more family and friends to be in attendance when he pitches for Team Mexico in the World Baseball Classic next month. The games will take place in Estadio Charros de Jalisco, near his hometown of Guadalajara.
"In Mexico, theres going to be a lot more than that, thats for sure," Gonzalez said. "More than anything (Im excited) to get together with the guys I played with in Mexico when I played winter ball down there. Obviously the family, I get to see my family, I dont get to see them all the time."
Sox left-hander Jose Quintana was also tuning up for his start for Colombia against Team USA in the World Baseball Classic, and so Gonzalez pitched in relief Sunday. He treated his pregame preparation the same way, and finished with two scoreless innings, with one hit and one strikeout.
"Im a little ahead of the game right now," Gonzalez said. "I started a little earlier this year in the offseason to work out, thinking I wanted to go to the WBC and get ready for that, but I think the most important thing right now is getting ready for April 1 with the White Sox."
Gonzalez was pleased to say Sunday that the Sox have become a second home to him.
Last year at this time, Gonzalez was in spring training with the Orioles, but they released him before the season, and he signed with the Sox on a minor-league deal.
Though he had his "ups and downs" in the first half after making his Sox debut April 25, he was happy with how he settled in late in the year. He finished with a 3.73 ERA over 135 innings in 24 appearances, including 23 starts.
"Second half was a better season for me, and you always want to finish strong," Gonzalez said. "Hopefully I can keep that going and minimize damage when I need to."
While plenty of additions went the wrong way for the Sox last year, Gonzalez as a fifth starter was a pleasant development. Manager Rick Renteria said it wasnt necessarily a surprise tothe Sox, however.
"It was probably a surprise (for others) because maybe people just didnt have any expectations," Renteria said. "But when you talk to him and see him prepare and see him pitch, hes pretty focused. He enjoys what he does. Hes very relaxed. But really he has an intent to go out and attack the strike zone.
"Hes a strike thrower, stays down in the zone, mixes his pitches well. Hes a veteran pitcher that has an idea of what he needs to do to get through the ballgame."
ckane@chicagotribune.com
Twitter @ChiTribKane
See the rest here:
Miguel Gonzalez at home with White Sox after late arrival in 2016 - Chicago Tribune
Category
Second Story Additions | Comments Off on Miguel Gonzalez at home with White Sox after late arrival in 2016 – Chicago Tribune
-
February 28, 2017 by
Mr HomeBuilder
-
February 28, 2017 by
Mr HomeBuilder
At Universal Windows Direct we pride ourselves in the beauty, value and performance of all of our vinyl replacement windows. All of our windows are custom made in Northeast Ohio to fit your home's unique style and your budget. Schedule a free in-home estimate today and have one of our highly trained representatives find the perfect window for you!
The most popular product at Universal Windows Direct; our double hung windows will improve your home's beauty and energy efficiency.
Read more ...
Casement and awning windows from Universal Windows Direct crank out for easy cleaning from the inside and provide maximum ventilation to your home.
Read more ...
Custom engineered bay and bow windows from Universal Windows Direct are the perfect way to add depth, light and charm to any room.
Read more ...
Sliding windows from Universal Windows Direct create a wide viewing area in any room with the convience of operable sashes for ventilation.
Read more ...
Whether your looking for a picture window, garden window or a custom shape; Universal Windows Direct has a window to fit your home's unique needs.
Read more ...
Link:
Replacement Windows - Universal Windows Direct
Category
Window Replacement | Comments Off on Replacement Windows – Universal Windows Direct
-
February 28, 2017 by
Mr HomeBuilder
CARSON CITY Assemblywoman Heidi Swank says Nevada could save money by considering alternatives before replacing windows in state buildings.
Swank, D-Las Vegas, told members of the Assembly Committee on Government Affairs that retrofitting options can save money over new window replacement, be just as energy efficient, and provide a greater return on investment for taxpayers.
The big motivating factor for this is we need to stretch our meager public dollars, Swank said Monday.
Swank said options such as window inserts, surface film or insulated cell shades can be just as effective.
Assembly Bill 160 would require the Division of Public Works to evaluate options before replacing windows in state government buildings.
The state would also have to work with and obtain approval from the Office of Historic Preservation before using an alternative in buildings at least 50 years old.
No action was taken by the committee.
Contact Sandra Chereb at schereb@reviewmournal.com or 775-461-3821. Follow @SandraChereb on Twitter.
Continue reading here:
Nevada assemblywoman wants to save money on window replacement - Las Vegas Review-Journal
Category
Window Replacement | Comments Off on Nevada assemblywoman wants to save money on window replacement – Las Vegas Review-Journal
« old Postsnew Posts »