Categorys
Pages
Linkpartner

    Home Builder Developer - Interior Renovation and Design



    Page 4,741«..1020..4,7404,7414,7424,743..4,7504,760..»



    Site plan approved for new Pottsboro apartments

    - January 13, 2015 by Mr HomeBuilder

    POTTSBORO Another step was taken toward Pottsboros newest apartments at the meeting Monday night of the Pottsboro Planning and Zoning Commission. The commission met to approve the site plan for the Abbington Junction apartments, plans which were already approved by the citys fire department, City Secretary Denise Smith said.

    There is one hiccup in the plans to which City Manager Kevin Farley alerted the commission: The plats drawn up by the apartment engineer include a driveway entering the apartments from Spur 316 a driveway that has not yet been approved.

    Between the architects and maybe the city and TxDOT, there was a miscommunication on the access driveway permit, he said.

    Normally the city issues the access permits on Pottsboro highways, but with a project such as this, Farley said that TxDOT and city regulations require a traffic impact analysis to be performed on the proposed driveway.

    This survey will be conducted by the engineer and the property owner, Cole Philips Engineering. Farley said he believes a traffic impact analysis will indicate that a turn lane will be necessary, so the exercise will be more of a formality.

    Commissioners expressed their appreciation to Farley for keeping them informed before approving the site plans for the Abbington Junction Apartments, paving the way for construction to begin.

    The building permit is approved now, but (the entrance needs) a driveway permit; (the engineers) cant build that driveway without that permit, City Secretary Denise Smith said. If they request variance, (that could be approved) by the first of February.

    The apartments will be located at 601 Spur 316 and will consist of 56 units at both market-rate and below market-rate rents.

    Go here to see the original:
    Site plan approved for new Pottsboro apartments

    GTA V Online Funny Moments: Air thrusting, Jizz Machine, Car racing, Demolition derby – Video

    - January 13, 2015 by Mr HomeBuilder


    GTA V Online Funny Moments: Air thrusting, Jizz Machine, Car racing, Demolition derby
    A compilation of some funny moments with my friends. Hope you enjoy 🙂 Undead x Odin x https://www.youtube.com/channel/UCNSzucuihhZOR0A364VRQBA HawkxxRising ...

    By: Undead x Thor x

    Continue reading here:
    GTA V Online Funny Moments: Air thrusting, Jizz Machine, Car racing, Demolition derby - Video

    Demolition Derby – Trailer – Video

    - January 13, 2015 by Mr HomeBuilder


    Demolition Derby - Trailer
    Demolition derby is a server for the popular GTA: San Andreas multiplayer modification called San Andreas Multiplayer (SA-MP). Visit demolition derby: http://www.dderby.net Download SA-MP from ...

    By: Miss Heartfire

    Visit link:
    Demolition Derby - Trailer - Video

    Complete Demolition Derby – Video

    - January 13, 2015 by Mr HomeBuilder


    Complete Demolition Derby
    I created this video with the YouTube Video Editor (http://www.youtube.com/editor)

    By: Kids Network Studios

    View post:
    Complete Demolition Derby - Video

    Demolition Swanson Street 2 – Video

    - January 13, 2015 by Mr HomeBuilder


    Demolition Swanson Street 2
    Saturday 10 January 2015; the demolition begins in Swanson Street, Auckland CBD.

    By: Kathrine Ross

    Continued here:
    Demolition Swanson Street 2 - Video

    Driveclub Demolition – Video

    - January 13, 2015 by Mr HomeBuilder


    Driveclub Demolition
    DRIVECLUB https://store.sonyentertainmentnetwork.com/#!/tid=CUSA00003_00.

    By: Alex Chown

    Continued here:
    Driveclub Demolition - Video

    Demolition underway at Beavercreek mall

    - January 13, 2015 by Mr HomeBuilder

    Workers have begun to demolish the portion of the Mall at Fairfield Commons that previously held an Elder-Beerman store to pave the way for five new restaurants.

    The demolition began Monday morning and will take about 30 days, mall manager Bruce Goldsberry said this morning, Jan. 13. After demolition is complete, workers will build a new entrance to the mall and do some of the site work for the restaurant sites.

    Two restaurant chains Chuys, an Austin, Texas-based Tex-Mex chain, and Huntington Beach, California-based BJs Restaurant & Brewhouse have filed plans with the city of Beavercreek to open free-standing locations in the newly created space. The Beavercreek locations will be the second Dayton-area restaurants for both chains, which chose Austin Landing for their first in the region.

    BJs opened an 8,300-square-foot stand-alone facility at Austin Landing in Miami Twp. in September 2013. Chuys is building a 7,460 square foot restaurant with a 2,150 square foot patio at the corner of Austin Landing Boulevard and Innovation Drive. Its scheduled to open in the late spring of 2015, according to Ann Cleator, director of development for Chuys Restaurants, said Monday.

    Three other restaurants, not yet identified, will be attached to the mall after the demolition and renovation are complete.

    Elder-Beerman had operated stores on both ends of the Mall at Fairfield Commons for several years but consolidated into its store on the north side of the mall. The consolidation left vacant the portion of the mall that once housed a Parisian department store.

    View post:
    Demolition underway at Beavercreek mall

    WAVES GOODBYE: Demolition of iconic Blackburn swimming baths to be confirmed

    - January 13, 2015 by Mr HomeBuilder

    THE demolition of Blackburns iconic Waves Water Fun Centre is expected to be confirmed by councillors this week.

    The 25-year-old baths, in Nab Lane, will close this spring and Blackburn with Darwen Council is expected to sell the site.

    Work on a modern 13.5 million leisure centre, backed by Blackburn College, is already under way in nearby Feilden Street.

    MORE TOP STORIES:

    A report before the councils executive board, which meets on Thursday, recommends that councillors approve the demolition and give regeneration bosses the go-ahead to tender the demolition contract.

    The report reads: The new leisure centre being developed in partnership with Blackburn College is nearing completion. It is anticipated that the current Waves Centre will cease operations in spring 2015 and become vacant.

    The costs of holding empty property, its vulnerability, lack of alternative use for the building and the potential for a new development point to a requirement for early demolition.

    Waves currently costs 32,000 per month to run, and even after demolition the holding costs of the site are expected to be around 17,000 per month costs which will be met by the councils leisure department.

    Councillor Maureen Bateson, executive member for regeneration, said: The opening of the leisure centre in the spring and the demolition of Waves will create a new site for redevelopment and regeneration in the town centre.

    Regeneration bosses will look to use the same contractor to demolish The Exchange Offices once home to the councils childrens services department the report added.

    See original here:
    WAVES GOODBYE: Demolition of iconic Blackburn swimming baths to be confirmed

    Demolition begins at Veterans Memorial

    - January 13, 2015 by Mr HomeBuilder

    The Daily Briefing Buckeye Forum Podcast

    The Dispatchpublic affairs team talks politics and tackles state and federal government issues in the Buckeye Forum podcast.

    While some in Columbus were just waking up this morning, a piece of the citys history was coming down.

    Crews began the first public stage of demolition at Franklin County Veterans Memorial today, starting work that should leave the site bare by the end of March.

    A 100-ton excavator began tearing into the northern-most end of the building just before 9 a.m.

    Crews from S.G. Loewendick & Sons excavation contractors, of Grove City, began even earlier, cutting steel beams with torches to make the machines job easier.

    Resembling something like the jaws of a steel dinosaur, the excavators hydraulic shear bit into the wall of the building, easily separating concrete and steel as it began to munch away at the north exhibition hall of Veterans.

    The demolition is expected to cost just under $900,000 and be wrapped up by March 31. The county will then turn the site over to the Columbus Downtown Development Corporation, which plans to build a $55 million Ohio Veterans Memorial and Museum in its place.

    James Goodenow, director of the countys public facilities management agency, said this morning that the demolition of Veterans is bittersweet.

    Goodenow, who used to be general manager there, said the site holds many great memories for Columbus residents.

    Continued here:
    Demolition begins at Veterans Memorial

    WAVES GOODBYE: Demolition of iconic Blackburn water park to be confirmed

    - January 13, 2015 by Mr HomeBuilder

    THE demolition of Blackburns iconic Waves Water Fun Centre is expected to be confirmed by councillors this week.

    The 25-year-old baths, in Nab Lane, will close this spring and Blackburn with Darwen Council is expected to sell the site.

    Work on a modern 13.5 million leisure centre, backed by Blackburn College, is already under way in nearby Feilden Street.

    MORE TOP STORIES:

    A report before the councils executive board, which meets on Thursday, recommends that councillors approve the demolition and give regeneration bosses the go-ahead to tender the demolition contract.

    The report reads: The new leisure centre being developed in partnership with Blackburn College is nearing completion. It is anticipated that the current Waves Centre will cease operations in spring 2015 and become vacant.

    The costs of holding empty property, its vulnerability, lack of alternative use for the building and the potential for a new development point to a requirement for early demolition.

    Waves currently costs 32,000 per month to run, and even after demolition the holding costs of the site are expected to be around 17,000 per month costs which will be met by the councils leisure department.

    Councillor Maureen Bateson, executive member for regeneration, said: The opening of the leisure centre in the spring and the demolition of Waves will create a new site for redevelopment and regeneration in the town centre.

    Regeneration bosses will look to use the same contractor to demolish The Exchange Offices once home to the councils childrens services department the report added.

    Original post:
    WAVES GOODBYE: Demolition of iconic Blackburn water park to be confirmed

    « old Postsnew Posts »ogtzuq

    Page 4,741«..1020..4,7404,7414,7424,743..4,7504,760..»


    Recent Posts