Categorys
Pages
Linkpartner

    Home Builder Developer - Interior Renovation and Design



    Page 5,163«..1020..5,1625,1635,1645,165..5,1705,180..»



    "Big Picture" presents Eastside Rising Bennett Street Demolition – Video

    - December 13, 2014 by Mr HomeBuilder


    "Big Picture" presents Eastside Rising Bennett Street Demolition
    This show gives viewers a chance to see entire Press Conferences and Events from beginning to end with no interruptions. Giving you the #39;Big Picture #39;. Thanks for watching Paul Paul...

    By: WITN22 Wilmington

    Visit link:
    "Big Picture" presents Eastside Rising Bennett Street Demolition - Video

    GTA V EPISODE #8 | DEMOLITION DERBY! – Video

    - December 13, 2014 by Mr HomeBuilder


    GTA V EPISODE #8 | DEMOLITION DERBY!
    Another hilarious GTA V episode made with me and my gooooood friend, BarmiiBear!! Check out his YouTube channel via the link below! BarmiiBear: https://www.youtube.com/user/BarmiiBear This...

    By: JusBanter

    See the article here:
    GTA V EPISODE #8 | DEMOLITION DERBY! - Video

    House demolition time lapse: 310 N. Mill Street, Decorah, Iowa. – Video

    - December 13, 2014 by Mr HomeBuilder


    House demolition time lapse: 310 N. Mill Street, Decorah, Iowa.
    House demolition time lapse. 310 N. Mill Street, Decorah, Iowa. Demolition: December 2013.

    By: jkjome85

    The rest is here:
    House demolition time lapse: 310 N. Mill Street, Decorah, Iowa. - Video

    2014 CDL World Cup of (toy car) Demolition Derby Round 2 Day 2 – Video

    - December 13, 2014 by Mr HomeBuilder


    2014 CDL World Cup of (toy car) Demolition Derby Round 2 Day 2
    Time to bring the 2nd round of this World Cup to an end. 8 more teams will make their way to the sweet 16 today. Here are today #39;s match-ups Honduras VS Dominica United States VS Saudi Arabia...

    By: James Hulse

    Go here to read the rest:
    2014 CDL World Cup of (toy car) Demolition Derby Round 2 Day 2 - Video

    Demolition of Winchester House in Bracknell, Berkshire, UK – Video

    - December 13, 2014 by Mr HomeBuilder


    Demolition of Winchester House in Bracknell, Berkshire, UK
    This iconic building which has been a major part of the Bracknell landscape for about 40 years is finally being demolished by crane in December 2014 after having laid derelict since 2003. This...

    By: Mark Jerram

    See the original post:
    Demolition of Winchester House in Bracknell, Berkshire, UK - Video

    GTA5 demolition car – Video

    - December 13, 2014 by Mr HomeBuilder


    GTA5 demolition car
    SHAREfactory https://store.sonyentertainmentnetwork.com/#!/tid=CUSA00572_00.

    By: Favalli CZE

    Read more here:
    GTA5 demolition car - Video

    Demolition Jobs – Employers

    - December 13, 2014 by Mr HomeBuilder

    You are here: Home > Employers

    We have designed this website to be as straightforward and simple to use as possible. Simply use the search boxes (left) to select the relevant geographic location/NFDC region, preferred qualifications and ideal level of experience to be taken to a list of suitable candidates.

    The content here will change constantly so please be sure to check back regularly to view the very latest candidates.

    Furthermore, if you are required to make job cuts yourself, can we please ask you to direct your former employees to this site to help them find alternative employment; and to safeguard their valuable experience here within the demolition industry.

    Search our database to find demolition workers by qualification, experience level and geographic location/region.

    Region Any London and Southern North East North West Midlands and Welsh Scotland and Northern Ireland

    Qualifications Any NVQ Level 2 - Demolition-Demolition (QUA729) Demolition Engineer 5 day PMSTS (Plant Management Safety Training Scheme) 5-day SMSTS (Site Management Safety Training Scheme) IOSH (Institute of Occupational Safety and Health). NEBOSH (National Examination Board of Occupational Safety and Health) NVQ Level 4 - Construction Site Management (Demolition) NVQ Level 3 - Construction Site Supervision (Demolition) NVQ Level 2 - Demolition-Demolition Plant (QUB729) Project Manager

    Last Job Role Any Demolition Operative 1 Contracts Manager Dismantling Foreman Asbestos Foreman Asbestos Stripper Explosives Engineer Shot Firer Soft Stripper Reclamation Operative Demolition Engineer Labourer Driller Demolition Operative 2 Mattockman Topman Demolition Supervisor Demolition Manager Burner Top Burner Ground Burner Brick Dresser

    Read more here:
    Demolition Jobs - Employers

    Demolition Jobs – Jobs

    - December 13, 2014 by Mr HomeBuilder

    You are here: Home > Jobs

    The Jobs section on demoltion-jobs.co.uk is brought to you by:

    demolition-jobs.co.uk - the fastest way to find work and workers in the UK demolition industry

    Subscribe to our RSS feed

    Search our database to find demolition jobs by region and role.

    Region Any London and Southern Midlands and Welsh North East North West Scotland and Northern Ireland

    Role Any Asbestos Foreman Asbestos Manager Asbestos Stripper Assictant to CEO Assistant Demolition Manager Brick Dresser Burner Business Development Executive Business Development Manager CCDO Demolition Labourer Commercial Manager Contracts Manager Demolition Engineer Demolition Foreman Demolition Machine Operator Demolition Manager Demolition Operations Manager Demolition Operative 1 Demolition Operative 2 Demolition Plant Engineer Demolition Plant Operative Demolition Project Manager Demolition Site Foreman Demolition Supervisor Dismantling & Demolition Manager Dismantling Foreman Divisional Manager Driller Equipment Operator Estimator Excavator Operator Explosives Engineer Fitter/Welder Ground Burner Health & Safety Advisor Health & Safety Co-Ordinator Health & Safety Manager Health & Safety Officer High Reach Operator Labourer Machine Operator Manager Mattockman Operations Manager Operations Technician Operative Plant Fitter/Welder Plant Operator Project Co-ordinator Project Engineer Project Manager Quantity Surveyor Reclamation Operative Senior Estimator/Bid Manager Senior Project Manager Senior Quantity Surveyor/Project Co-Ordinator Shot Firer Site Document Controller Site Manager Soft Stripper Standards Verifier - NVQ Structural Engineer Top Burner Topman Trainee Estimator Transport Manager

    Follow this link:
    Demolition Jobs - Jobs

    Demolition date set for former Grand Rapids Press building

    - December 13, 2014 by Mr HomeBuilder

    Demolition allows MSU to build a facility that best achieves the goals inherent in biomedical research -- Vennie Gore

    EAST LANSING, MI. The former Grand Rapids Press building will be demolished next spring, making room for a new Grand Rapids Biomedical Research Center on a portion of the site at 155 Michigan Street NE.

    The $3 million demolition plan was approved on Friday, Dec. 12, by the Michigan State University Board of Trustees. The university, which operates the College of Human Medicines Secchia Center just up the Michigan Street hill, acquired the property from the Press owners in 2012.

    Demolition allows MSU to build a facility that best achieves the goals inherent in biomedical research that requires high-tech laboratories and allows for the site to have maximum flexibility for future development, said Vennie Gore, MSU vice president for auxiliary enterprises, in a statement. RELATED: MSU to replace old Grand Rapids Press building with state-of-the-art labs

    The building to be razed is 173,384 square feet on a site of approximately 4.3 acres. It was built in 1966 and served as the Press headquarters until 2012. Demolition is scheduled to begin in March 2015, with final completion of demolition by December 2015.

    Pending approvals, the new Grand Rapids Biomedical Research Center is planned to open late 2017.

    At a future MSU Board of Trustees meeting this winter, the MSU administration plans to recommend construction of the Grand Rapids Biomedical Research Center on a portion of this site. The remainder of the site may be divided into parcels for future development by the university and/or private developers.

    Last April, Dick Temple, architect and project manager for MSU's College of Human Medicine, said officials are planning for a 145,000-square-foot building that will be five or six stories tall. He said the Grand Rapids Research Center's design will reflect a gateway to both the Medical Mile and the North Monroe neighborhood.

    Funding will be provided through the universitys general fund and tax-exempt financing with debt repayment from a variety of sources including the general fund. RELATED: MSU plans to demolish former Grand Rapids Press headquarters to build biomedical research center

    Jim Harger covers business for MLive/Grand Rapids Press. Email him at jharger@mlive.com or follow him on Twitter or Facebook or Google+.

    Read the original here:
    Demolition date set for former Grand Rapids Press building

    Demolition begins on Crowell-Collier site in downtown Springfield

    - December 13, 2014 by Mr HomeBuilder

    Demolition started Friday on part of the massive Crowell-Collier complex in downtown Springfield, part of a more than 15-year effort to make the aging building safer.

    Three of the complexs 11 buildings will be torn down by owner Mosier Industrial Services as part a court order. Work began Friday on a building in the center of the structure called Building F, removing brick walls and windows.

    The city has focused on Crowell-Collier because of the scale of the complex and several safety and maintenance concerns, including two fires, falling bricks, lack of maintenance for 60 years and a large amount of unknown materials that were jammed in it, City Law Director Jerry Strozdas said.

    There are just aspects of this building that, all told, made it a significant threat to public safety, he said.

    Mosier had been ordered to tear down Building F by Oct. 31 and Buildings J and K by the end of the year. The court order was revised last month to adjust those deadlines and remove a completion date. The company now is to proceed continuously until the demolition is done, Strozdas said, but may take some weather-related breaks.

    It reversed the order of some of the demolition, Strozdas said, doing interior work such as removing pipes first and then switching to the exterior.

    The city would have liked the demolition to have moved quicker, Strozdas said, but is pleased that its progressing.

    Its been an ongoing process. At each of the steps along the process, the building became less and less of a threat to the public safety and that was our mission all along, he said.

    Part-owner of the building Carl Carroll said Friday that crews only had one working elevator to remove all of the material.

    Every time we would get it empty, we would find a new room that had more in it, Carroll said. It would be semi loads after semi loads It took Harry 27 elevators and 40 years to fill it up and we emptied it in 3 years.

    More:
    Demolition begins on Crowell-Collier site in downtown Springfield

    « old Postsnew Posts »ogtzuq

    Page 5,163«..1020..5,1625,1635,1645,165..5,1705,180..»


    Recent Posts