Home Builder Developer - Interior Renovation and Design
-
November 1, 2014 by
Mr HomeBuilder
PANICKED motorists were left fuming after discovering their cars had been moved to another street by workmen who were repainting road markings.
Some drivers were on the verge of tears, believing their vehicles had been stolen after returning to find their vehicles missing from the Southampton street where they had left them.
In fact workmen had hoisted the cars on to a transporter and parked them in nearby streets to allow them to continue painting lines on the recently resurfaced road.
Drivers spent hours searching for their vehicles last night while making frantic calls to the police in a bid to find their cars.
After being reunited with them, drivers hit out at Southampton City Council asking how they were allowed to move their vehicles without warning and without any notification as to where they had moved them to.
Letters from the council had gone out to residents three days before the lines were due to be painted by Balfour Beatty, contractors for Southampton City Council.
The letter reads: We have made several attempts to complete this work but have found that motorists are removing the cones and parking cars in the spaces which has prevented work starting.
No waiting cones will mark the working area. Please be advised that any cars parked on the eastern side of Carlton Road between Wilton Avenue and Archers Road will be removed to the nearest available area, a record of which will not be noted.
"If your car is removed we will not be responsible for its safety and location or for any costs incurred by its relocation.
A spokesperson for the AA said that the action was pretty dramatic but that the council do have the right to remove cars if warning has been given.
Link:
VIDEO: Driver 'loses' car - after roadworkers take it away
Category
Painting Contractors | Comments Off on VIDEO: Driver 'loses' car – after roadworkers take it away
-
November 1, 2014 by
Mr HomeBuilder
Best Outdoor Lighting Specialist in Naples, FL - (239) 273-1802
Best Outdoor Lighting Specialist in Naples, FL - (239) 273-1802 For expert landscape lighting, look no further than Vision Landscape Lighting in Naples, Flor...
By: Bombora Local Community
The rest is here:
Best Outdoor Lighting Specialist in Naples, FL - (239) 273-1802 - Video
Category
Outdoor Lighting | Comments Off on Best Outdoor Lighting Specialist in Naples, FL – (239) 273-1802 – Video
-
November 1, 2014 by
Mr HomeBuilder
A thirty-four-year-old local woman, who posed as an employment agent, was sentenced to jail for twenty four months and ordered to pay BND$22,920 in compensation to a group of people who paid her money to secure the services of maids.
Nazura Garip has to serve an additional eighteen months and two weeks in jail if she fails to pay the compensation, which is equivalent to the amount of deposit money she received from 11 clients between October 2011 and May 2013.
She convinced her clients to hand over the money after they selected maids from a list of biodata, which she had created. The deposits varied from BND$500 to BND$2,500.
Nazura used to pick foreign women, who were in the country on social visit passes, to send to her clients' houses to work as maids.
However, after a few days she would take them away on the pretext that the maids had to undergo a medical examination and apply for an identity card.
She used to replace the maids several times to convince her clients that she is an authorised maid agent. When Nazura could not find a foreign woman to work as a maid, she would stop contacting her clients.
A police report was lodged by one of her clients, who did not get a maid after paying money, which prompted a probe into the case.
Nazura had asked the court for a fine instead of a jail term, however, Magistrate Hajah Ervy Rahman ruled that imprisonment is justified as her crime is serious. BRUDIRECT.COM
View post:
Faux Maid Agent Sentenced to 2-Year Jail
Category
Maid Services | Comments Off on Faux Maid Agent Sentenced to 2-Year Jail
-
November 1, 2014 by
Mr HomeBuilder
A 44-year-old worker died and three others were injured Saturday afternoon when a brick facade fell from a West Lawn neighborhood building and injured workers, officials said.
The accident happened shortly before 1 p.m., at a single-story commercial building that houses several different businesses across the street from a Mexican restaurant in the 4100 block of West 63rd Street, Chicago Fire Department officials said.
Workers were making changes to the buildings facade when it came tumbling down. Stacks of fallen bricks remained piled on the sidewalk an hour after the accident, attracting a group of gawkers who stood in the parking lot across the street.
A 44-year-old man and a 30-year-old man were taken in serious-to-critical condition to Advocate Christ Medical Center in Oak Lawn, where the older man later died. A 44-year-old man was taken to Holy Cross Hospital in fair-to-serious condition. According to police officials, a 41-year-old man was injured but refused treatment.
Chicago Department of Buildings spokeswoman Mimi Simons said the work at the site was being performed by unlicensed contractors without building permits.
When a full inspection is complete, we expect that we will issue the building owner several violations, said Mimi Simons, spokeswoman for the Chicago Department of Buildings.
The building owner must remove the debris and erect a canopy for the public's safety, she said.
Ramona Lopez, 55, runs a bakery and a small shop selling religious artifacts and plants inside the building. Lopez, who is a tenant in the building, said the workers had been there for three days and described them as hard-working, humble people.
Lopez was working inside the building when she heard a loud crash and saw the accident, she said.
Fighting back tears, she said she was nervous about the future of the building and what its closure could mean for her family.
Originally posted here:
3 workers injured, 1 killed after brick facade falls from building
Category
Lawn Treatment | Comments Off on 3 workers injured, 1 killed after brick facade falls from building
-
November 1, 2014 by
Mr HomeBuilder
ROCKY HILL, CT (WFSB) -
Since childhood, my love of the outdoors has always been a part of me. And as an adult, I hope to share that passion with my own children.
So, I offered this challenge to my family, to join me in exploring the hidden treasures and more popular gems Connecticut and the surrounding region have to offer.
From hiking to biking to kayaking, I hope my window into the outside world inspires you to explore as well.
DIVIDEND POND TRAILS
Rocky Hill
Connecticut is steeped in history and there is no clearer vision of this than at Dividend Pond Trails and Archaeological District in Rocky Hill. Located off of Old Forge Road, it is an ideal spot to explore the wooded 68-acre parcel which includes two ponds, trails, and industrial relics harkening as far back as the 1600s.
I settled on hiking the White Trail with my four-year-old, who tagged along for the 2.5-mile adventure. It begins at the parking lot and heads left down the trail past Lower Dividend Pond. But before starting, it pays to study the map at the kiosk at the park's entrance. It details the 10 archaeological gems that dot the property. All showcase the area's rich manufacturing heritage from the late 1600's to the mid 1880's.
And, as we soon discovered, the moment we strolled past the lower pond, some of these shadowy artifacts began to emerge. I found the presence of what was once a powerful industry built on factories and mills gels nicely with its natural surroundings.
As we rounded the pond and began to head uphill, the sound of the cascading waterfall soon greeted us. A dam dividing the lower pond from its upper pond neighbor is a dramatic, and worthwhile stop on this journey. Here, is where the true pieces of Rocky Hill's past come alive. Broken remnants of an 1884 manufacturing plant hugs the falls, with its looming columns and steep steps following the landscape down to the brook below.
Go here to read the rest:
Dividend Pond in Rocky Hill steps hikers back in time
Category
Landscape Hill | Comments Off on Dividend Pond in Rocky Hill steps hikers back in time
-
November 1, 2014 by
Mr HomeBuilder
Land clearing before
Land clearing.
By: Louis Palacios
More:
Land clearing before - Video
Category
Land Clearing | Comments Off on Land clearing before – Video
-
November 1, 2014 by
Mr HomeBuilder
Land Clearing Usaha Bersama
LC Pertama.
By: bangunprima usaha
Go here to see the original:
Land Clearing Usaha Bersama - Video
Category
Land Clearing | Comments Off on Land Clearing Usaha Bersama – Video
-
November 1, 2014 by
Mr HomeBuilder
By Mabell, Dave on October 29, 2014.
Dave Mabell
LETHBRIDGE HERALD
dmabell@lethbridgeherald.com
The legacy of a pioneering Lethbridge home builder and developer will be celebrated this afternoon. Walter Stewart is remembered as an innovator who fostered the home construction industry while building scores of homes as the city grew.
The longtime Lethbridge businessman also developed the northside St. Edwards and St. James neighbourhoods, and went on to launch the West Highlands subdivision along with its now-booming commercial district.
A memorial service will be held at 3:30 p.m. today at the Martin Brothers chapel.
Tosh Kanashiro, a Lethbridge development officer during many of Stewarts busiest years, remembers him as creative but trustworthy.
His word was as good as a contract.
Stewarts initiatives to build affordable housing, Kanashiro says, included starter homes without basements and zero lot line blocks, allowing a wider home on a small lot. Walter Stewart Contracting Ltd. and then his Nu-Mode Homes also built many northside duplexes a home style that other local builders followed, Kanashiro notes.
Link:
City loses pioneering home builder
Category
Home Warranty | Comments Off on City loses pioneering home builder
-
November 1, 2014 by
Mr HomeBuilder
Reinforce your old house joists Hey Handy Handyman Services in Austin
Reinforce your old house joists. Tighten up insulation, clean up debris, and enjoy! Hey Handy Handyman Services in Austin.
By: Hey Handy Handyman Services Austin
See the rest here:
Reinforce your old house joists Hey Handy Handyman Services in Austin - Video
Category
Handyman Services | Comments Off on Reinforce your old house joists Hey Handy Handyman Services in Austin – Video
-
November 1, 2014 by
Mr HomeBuilder
DEADWOOD The journey to Deadwoods Highway 85 construction project has been just as bumpy and windy as the 1.5-mile road really is, but Monday crews will begin working to improve the major thoroughfare, looking to improve the ride for locals and tourists, alike.
With city, South Dakota Department of Transportation (DOT) and Oftedal officials in attendance, the project was discussed in detail Wednesday night at a public meeting in Deadwood.
Construction on Deadwoods Highway 85/Cemetery Street Reconstruction Project will begin in November and has an anticipated completion date of September, 2016.
The project timeline includes three phases.
Phase 1 will run from November through March of 2014 and includes four sub-phases, none of which involve highway reconstruction. Phase 1A includes Cemetery Street storm sewer and utilities work. Phase 1B includes constructing a retaining wall near the Mickelson Trail, and Phase 1D includes a rock cut in the vicinity of Twin City Hardware. Phase 1C includes a rock cut in the vicinity of Mollmans gas station.
Phase 1 traffic control involves closing down a portion of Cemetery Street; a temporary pedestrian access detour on the Mickelson Trail; one lane of traffic through the rock cut 1 and 2 areas using flaggers and temporary signals.
Chris Audiss, project manager for the principal contractor on the project, Oftedal Construction, said that Monday, crews will begin setting up barriers at the site of the first rock cut, near Mollmans corner.
Well be setting up concrete barriers along the south edge of the highway, Audisss said. The barriers are to protect any rocks that may fall down from up top, as we are starting to excavate this rock cut.
On Monday, motorists should expect 10 minute delays.
Tuesday, the project begins in earnest, and motorists will experience two weeks of 30-minute delays between the hours of 9 a.m. and 3 p.m.
See original here:
Highway 85 construction starts Monday in Deadwood
Category
Gutter Installation | Comments Off on Highway 85 construction starts Monday in Deadwood
« old Postsnew Posts »