Compact the soil in the trench bottom with a hand tamper or vibrating plate compactor. This step is often neglected. The excavator, and even hand shovels, can disturb and loosen the top inch or two of soil, and thats enough to make your wall settlesettling is bad!

Our experts prefer crushed stone for the base rather than naturally occurring gravel dug from a pit. Crushed stone is a little more expensive. However, it provides better drainage, and because of the sharper angles on the stone, it requires less compacting, and once its compacted, it stays that way.

Joe and Jake have found that crushed stone sized between 1/2 in. and 3/4 in. is best suited to handle the heaving forces created by the harsh freeze/thaw cycles here in Minnesota. Avoid rounded stones like pea gravel or river rock; they dont form strong interlocking bonds like angular stone.

Leave the stone no more than 1/2 in. higher than you want the final height to be, and then make a couple passes with a hand tamper or plate compactor. Youll notice the stone is almost 100 percent compacted as soon as its laid in the trench. The same type of stone will be used for backfilling, which also eliminates the need for hauling in multiple materials.

Use a torpedo level to level each block front to back and a 4- or 6-ft. level to keep each course level and even. Set the blocks with a heavy rubber or plastic mallet. Getting the first course flat and level is extremely important, so take your time. Try to lay the course as close to the center of the trench as possible.

Original post:
Build a Sturdy Retaining wall that will last a lifetime

Related Posts
November 2, 2018 at 6:47 pm by Mr HomeBuilder
Category: Retaining Wall