CAPE GIRARDEAU, MO (KFVS) - ?

Here is a list of road projects around the Heartland scheduled for Saturday, September 13.

Route CC in Butler County will be reduced to one lane as Missouri Department of Transportation crews perform pavement repairs. This section of roadway is located from Route 51 to Route FF. Weather permitting, work will performed Tuesday, Sept. 9 through Wednesday, Sept. 10 from 8 a.m. to 3:30 p.m. daily.

East and westbound traffic will be restricted. Existing lanes of Route 67 from CR 323 to Route 160/158 will be signed as Route C. The north end of Route C (existing Route 67) will remain closed for about two months as work is completed at the intersection of Route 67, Route C, and CR 323.

US 60 in Butler County will be reduced to one lane as Missouri Department of Transportation crews repair the shoulder. The section of roadway is located between US 67 and County Road 409. Weather permitting, work will take place Monday, Sept. 15 through Friday, Sept. 26 from 7 a.m. to 4 p.m.

Cape Girardeau County, MO

Route EE will be closed while crews perform work on the railroad crossing. This section of road is located between Route 25 and County Road 264. Weather permitting, crews will be working on Friday, Sept. 12 and then again on Monday, Sept. 29 through Thursday, Oct. 2 from 8 a.m. to 5 p.m. daily.

Route Y in Cape Girardeau County will be closed as Missouri Department of Transportation crews replace a pipe under the roadway. The section of roadway to be closed is located between County Road 621 and Route V. Weather permitting, work will take place Monday, Sept. 15 from 8 a.m. to 3 p.m.

Eastbound Route 34/72 in Cape County will be reduced to one lane as contractor crews perform work on the railroad crossing in Jackson.The railroad crossing is located at the intersection of Route 34/7 and Routes 61 and 25. Various lane closures will be performed from 11 p.m. Friday, Sept. 12 to 7 a.m. Saturday, Sept. 13, weather permitting. The work zone will be marked with signs. Motorists are urged to use extreme caution while traveling near the area.

MoDOT plans to replace the bridge on Route 61 over Hughes Creek - two miles from Route CC. Construction is set to begin in 2015. Property owners adjacent to the bridge will have access to their properties. A marked detour is proposed here:

Continued here:
Heartland road projects for 9/13

Related Posts
September 12, 2014 at 10:17 pm by Mr HomeBuilder
Category: Water Fountain Install