Categorys
Pages
Linkpartner


    Page 46«..1020..45464748..60..»



    EagleView Technologies Launches GutterReport - March 18, 2014 by Mr HomeBuilder

    Bothell, WA (PRWEB) March 17, 2014

    EagleView Technologies, Inc., a leading technology provider of aerial imagery, data analytics and GIS solutions, introduces the GutterReport, an EagleView measurement report designed specifically to help with the sales, marketing and installation of gutter systems.

    The new GutterReport supplies contractors with the measurements needed to prepare an estimate for gutter replacement or repair jobs, explained Rishi Daga, EagleView executive vice president of commercial sales. The report gives the contractor confidence that their gutter estimate will be on target due to the technology of EagleView.

    The report is offered on both commercial and residential properties and provides eave measurements, downspout and miter corner count, as well as total number of stories by direction. The customized cover page and color photos of the property turn the report into a professional presentation tool that can lead to increased sales closing rates and positions contractors as innovative business practitioners.

    The GutterReport is available now and can be ordered online at http://www.eagleview.com or through EagleViews mobile applications for smart phones and tablets.

    About EagleView EagleView Technologies is the unparalleled provider of aerial imagery, data analytics and GIS solutions serving the commercial, government and public utility sectors. The companys patented image capture processes and 3D modeling algorithms coupled with property-centric analytic tools empower end-user workflows with scalable, efficient and highly accurate answer sets in support of property claims, risk management, emergency response, assessment, corridor mapping and more. For more information contact (866) 659-8439 or visit http://www.eagleview.com or http://www.pictometry.com.

    Go here to read the rest:
    EagleView Technologies Launches GutterReport

    Widening of Olive Branch highway picking up speed with warmer weather - March 17, 2014 by Mr HomeBuilder

    Hold on for just a moment while we finish setting up your account..

    Your Digital Subscription to the The Memphis Commercial Appeal is now active. Enjoy unlimited access to CommercialAppeal.com and the The Commercial Appeal smartphone and tablet apps.

    Note: your login information will be needed the first time you access CommercialAppeal.com and the The Commercial Appeal smartphone and tablet apps.

    Your Premium Subscription to The Memphis Commercial Appeal is now active. In addition to your home delivery service, enjoy unlimited access to CommercialAppeal.com and the The Memphis Commercial Appeal smartphone and tablet apps.

    Note: your login information will be needed the first time you access CommercialAppeal.com and the The Memphis Commercial Appeal smartphone and tablet apps.

    Read the rest here:
    Widening of Olive Branch highway picking up speed with warmer weather

    Project 13-18 Jefferson St - March 12, 2014 by Mr HomeBuilder

    CITY OF BLAINE NOTICE OF PUBLIC HEARING BEFORE THE BLAINE CITY COUNCIL ANOKA COUNTY PARTIAL RECONSTRUCTION OF JEFFERSON STREET FROM 125TH LANE TO NORTHERN CITY LIMIT IMPROVEMENT PROJECT NO. 13-18 TO WHOM IT MAY CONCERN: NOTICE is hereby given that the City Council of the City of Blaine, Minnesota, will meet on Thursday, April 3, 2014, at 8:00 p.m. in the Council Chambers at the City Hall, 10801 Town Square Drive NE to consider the making of the following improvement: Spot concrete curb and gutter replacement, installation of concrete sidewalk, storm sewer structures, asphalt surface, traffic control signage, striping, and appurtenant construction. The property to be assessed pursuant to Minnesota Statutes Chapter 429, for such improvement, is within the following described area: Jefferson Street from 125th Lane to Northern City Limits The estimated total cost of such improvement is $938,150. A reasonable estimate of the assessment cost will be available at the hearing. Such persons as desire to be heard with reference to the proposed improvements will be heard at this meeting. Hearing impaired persons planning to attend who need an interpreter or other persons with disabilities who require auxiliary aids should contact Rebecca Olson at (763) 785-6120 no later than March 28, 2014. For questions regarding the proposed project, contact Assistant City Engineer, Dan Schluender, 763-785-6158. DATED: March 13, 2014 Jane M. Cross, CMC, City Clerk Published in the Blaine/Spring Lake Park Life March 21, 28, 2014 188345

    See the article here:
    Project 13-18 Jefferson St

    13-19 Able St - March 12, 2014 by Mr HomeBuilder

    CITY OF BLAINE NOTICE OF PUBLIC HEARING BEFORE THE BLAINE CITY COUNCIL ANOKA COUNTY RECONSTRUCTION OF ABLE STREET FROM CSAH 10 TO 89TH AVENUE IMPROVEMENT PROJECT NO. 13-19 TO WHOM IT MAY CONCERN: NOTICE is hereby given that the City Council of the City of Blaine, Minnesota, will meet on Thursday, April 3, 2014, at 8:00 p.m. in the Council Chambers at the City Hall, 10801 Town Square Drive NE to consider the making of the following improvement: Installation of concrete curb and gutter, spot concrete sidewalk replacement, storm sewer and structures, asphalt surface, traffic control signage, striping, and appurtenant construction The property to be assessed pursuant to Minnesota Statutes Chapter 429, for such improvement, is within the following described area: Able Street from CSAH 10 to 89th Avenue The estimated total cost of such improvement is $773,140. A reasonable estimate of the assessment cost will be available at the hearing. Such persons as desire to be heard with reference to the proposed improvements will be heard at this meeting. Hearing impaired persons planning to attend who need an interpreter or other persons with disabilities who require auxiliary aids should contact Rebecca Olson at (763) 785-6120 no later than March 28, 2014. For questions regarding the proposed project, contact Assistant City Engineer, Dan Schluender, 763-785-6158. DATED: March 13, 2014 Jane M. Cross, CMC, City Clerk Published in the Blaine/Spring Lake Park Life March 21, 28, 2014 188365

    Excerpt from:
    13-19 Able St

    TRAFFIC ADVISORY: Roadwork underway from Charlotte to Manatee - March 12, 2014 by Mr HomeBuilder

    Published: Monday, March 10, 2014 at 1:00 a.m. Last Modified: Sunday, March 9, 2014 at 2:09 p.m.

    Drivers in Sarasota, Manatee and Charlotte counties are advised to use caution in the following areas where the Florida Department of Transportation says road construction or other projects are underway:

    SARASOTA COUNTY

    Interstate 75 from Sumter Boulevard in North Port to River Road. Crews widening the highway to six lanes. Expect lane closures from 9 p.m. to 5 a.m.

    I-75 at mile markers 200, 213, 224 and 228. Crews repairing overhead signs and highway lighting. from 9 p.m. to 5 a.m. tonight and Tuesday night.

    I-75 from University Parkway to the Charlotte County line. Expect delays. Crews are installing closed-circuit cameras, roadside sensors and other equipment for an intelligent transportation system.

    I-75 overpass at Jacaranda Boulevard. Crews painting the overpass. Overnight, single Lane closures on Jacaranda.

    I-75 at Fruitville Road, Laurel Road, Jacaranda Road and Sumter Boulevard. Crews replacing overhead signs. Lane closures between 10:30 p.m. and 6 a.m.

    U.S. 41 between Shamrock Boulevard and the Lowes entrance in Venice. Southbound outside lane closed from 10:30 p.m. to 6 a.m. Friday and Saturday nights while crews construct a new driveway.

    U.S. 41 over Phillippi Creek. Turn lane closures from 9 p.m. to 5 a.m. tonight through Friday night during bridge maintenance.

    The rest is here:
    TRAFFIC ADVISORY: Roadwork underway from Charlotte to Manatee

    Rainwater gutter installation by Gutter People – Video - March 11, 2014 by Mr HomeBuilder


    Rainwater gutter installation by Gutter People
    Gutter People - Well known as the leaders in seamless gutters, seamless barge boards, seamless fascias, eave ceilings and roof spray in Gauteng.

    By: Gutter People

    Go here to see the original:
    Rainwater gutter installation by Gutter People - Video

    New Orleans Professional Gutter Installation – J L Remodeli – Video - March 11, 2014 by Mr HomeBuilder


    New Orleans Professional Gutter Installation - J L Remodeli
    http://www.gutterstech.com/ J L Remodeling Inc. 8400 Old Gentilly Road New Orleans, LA 70126 504-305-0325.

    By: ASN Loop

    See the rest here:
    New Orleans Professional Gutter Installation - J L Remodeli - Video

    See a New Gutter Installation 7 months later! – Video - March 11, 2014 by Mr HomeBuilder


    See a New Gutter Installation 7 months later!
    Watch and see what gutters look like just 7 months after installation, you might be surprised!!!

    By: Everything Gutter

    See more here:
    See a New Gutter Installation 7 months later! - Video

    State readies for Omaha Street reconstruction - March 11, 2014 by Mr HomeBuilder

    A stretch of Omaha Street is due for reconstruction and the department in charge is getting a more than two-year head start on an approximately $11.8 million project.

    The Department of Transportation and Rapid City's CETEC Engineering Services hosted an open house Monday on the project that will rebuild Omaha Street from 12th Street to Mountain View Road, starting in the fall of 2016.

    The project also reconstructs Omaha Street from Mountain View Road west to Sheffer Street on West Chicago Street, which the DOT refers to as Highway 231.

    Both roads are state highways, so the DOT is leading reconstruction efforts and will spend an estimated $10.3 million on the project.

    The city, which has contracted Rapid City's Ferber Engineering, meanwhile, will spend around $1.5 million on work that coincides with the DOT project, including the installation of new water and sewer utilities, according to the engineering services department.

    Federal funding will pay for around $8 million of the DOT's $10.3 total cost.

    With around 35 residents in attendance Monday evening, project staff covered the scope of the work and its construction schedule. Additional meetings will start this spring over the acquisition of land in the area for needed public right-of-way.

    "The project is in August of 2016," DOT Regional Operations Manager Tom Horan said before the meeting. "That's when it will go to construction so, absolutely, there will be more public meetings."

    The project includes a widening of Omaha Street that will require up to 10 feet of additional public right-of-way, new curb, gutter, sidewalks, storm sewer improvements, lighting and signals.

    "It will look more like Omaha to the east," Horan said.

    More here:
    State readies for Omaha Street reconstruction

    Culvert replacements dominate 2014 highway projects - March 9, 2014 by Mr HomeBuilder

    A lot of culverts, is how Dave Halbersma, Pipestone County highway engineer, described the highway departments plans for 2014 during Pipestone Countys annual road and bridge public hearing held to gather input from local units of government and the public.

    About 30 people attended the hearing including Pipestone County commissioners, the county administrator and representatives from the countys cities and townships.

    Three people asked questions during the meeting regarding the county Highway 267 (cemetery road) project, wear on roads used as detour routes during the Minnesota Department of Transportations (Mn/DOT) state Highway 75 project last summer, and possible paving of a county road that has heavy traffic due to a nearby dairy.

    Halbersma said he would review the areas of concern and discuss them with the county commissioners as the county updates its five-year plan. He said there was no significant wear to the roads used for the Hwy. 75 detour last summer, but that they would be reviewed again this year.

    Halbersma reviewed the existing five-year plan that includes projects planned up through 2017.

    Tentative construction plans for this summer are expected to cost around $4.5 million and include 16 box culverts or bridge replacements. Halbersma planned to tackle eight of those in conjunction with a CSAH 10 widening project originally planned for this summer. The widening project will likely be delayed until 2015, however, due to appraisals that took longer than anticipated, but the culvert replacements are still planned for this year.

    Other culvert and bridge replacements include four on CSAH 6 northwest of Woodstock, L3677 on 160th Avenue northwest of Woodstock, L3671 on 120th Avenue southwest of Holland, L3597 on CSAH 16 in Hatfield and bridge 92469 on 221st Street two miles south of the Lincoln County border west of U.S. Highway 75.

    The 2014 plans also include seal coating of about 27.5 miles of road, primarily in the southern portion of the county, reconstruction of .1 miles of County State Aid Highway (CSAH) 19 near Ruthton, and reconstruction of .75 miles and the addition of a bike path on the cemetery road northwest of Pipestone.

    Cemetery road project

    The cemetery road project will widen the road from 22-to 24-feet, add curb and gutter on the east side and add a 10-foot wide biking path from CSAH 15 north to the Wildlife Management Area parking lot, using a $500,000 state park road fund grant received last year. Halbersma said the county is still waiting for approval of the project from Pipestone National Monument, U.S. Fish and Wildlife Service and Minnesota Department of Natural Resources (DNR) before advertising for bids.

    Read the original:
    Culvert replacements dominate 2014 highway projects

    « old entrysnew entrys »



    Page 46«..1020..45464748..60..»


    Recent Posts