Hardwood floor installation can take anywhere from a few days to more than two weeks, depending on demolition, wood type, the condition of your subfloor, total square footage of the project, and installation method. Demolition is necessary if you have existing flooring you want to replace with hardwood floors. New-construction homes do not require this step, as the subfloor is primed and ready for floor installation. During demolition, the flooring crew may find that your subfloor has damaged wood, uneven surfaces or other problems that must be addressed before the new wood can be laid down. Crews may charge on an hourly rate for subfloor repair, and the work can take a few hours to several days, depending on whats hiding underneath your floor. The wood for your new floor generally arrives a few days before any work begins. This allows the wood to acclimate to the relative humidity in your house, which prevents it from shrinking or expanding after installation and causing gaps or buckling. The actual wood installation may take several days or more, depending on the size of your home and what type of custom cutting and designs are desired. If your flooring is not prefinished, the unfinished wood must then be sanded and stained in the home to treat and protect your new investment. Typically, stain takes a full day to dry, and multiple coats are applied. Baseboards and trim must also be installed. With all these variables at play, you can see why its important for a wood installation pro to provide an estimate only after seeing your home.

View original post here:
The 10 Best Hardwood Floor Installers in Jacksonville, FL 2020

Related Posts
March 16, 2020 at 11:46 pm by Mr HomeBuilder
Category: Flooring Installation