Home Builder Developer - Interior Renovation and Design
-
June 23, 2012 by
Mr HomeBuilder
OLD BRIDGE, N.J., June 22, 2012 /PRNewswire/ --The retail vacancy rate along central New Jersey's major shopping corridors fell to 9.1% in April from a 10-year-high of 10.5% a year ago and 9.8% in 2010 as a series of 'big box' absorptions triggered improvements on three highways and a stable picture on the fourth, according to R.J. Brunelli & Co., LLC. The performance snapped a string of five consecutive years of rising vacancies, but the region's current rate remains well above the 10-year low of 3.4% attained in 2006.
In its 23rd annual study of the central New Jersey market, the Old Bridge-based retail real estate brokerage found 2.79 million square feet of vacancies in the 30.53 million square feet of space studied along State Highways 1, 9, 18 and 35 in Mercer, Middlesex and Monmouth counties, and a small section of Ocean County. Route 18 posted the steepest drop in its vacancy factor, while Routes 1 and 35 also improved and Route 9 held even.
Vacancies were seen in 195 of the 785 sites evaluated throughout the region. The study evaluated shopping centers and freestanding buildings exceeding 2,000 square feetincluding restaurants, auto service facilities and vacant auto dealerships whose location and configuration makes them viable for retail use. Regional malls and centers under construction or major redevelopment are excluded.
Taken together with the slight increase to 8.2% from 8.1% in the vacancy rate along six northern New Jersey highways announced by R.J. Brunelli last week, the vacancy factor for the 10 retail corridors surveyed by the firm in the central and northern parts of the state declined to 8.7% from 9.3% in 2011. All told, the firm found 5.11 million square feet of empty space in the 58.87 million square feet evaluated. Big box spaces accounted for 2.41 million square feet, or 47.0%, of the vacancies.
"The improved picture in central New Jersey over the past 12 months is largely due to positive activity on the big-box front, where full or partial absorptions of 10 spaces more than offset three fresh vacancies," said Richard J. Brunelli, president of the firm. "Still, lingering vacancies in nearly 30 other big-box spaces along the corridors continued to keep the region's vacancy rate elevated."
By virtue of those absorptions, vacant big boxes of 20,000 square feet or more combined for approximately 1.31 million square feet, or 47.1%, of available retail space along the four corridors, down from a 54.5% share in the firm's 2011 study. Notably, 1.20 million, or 91.4%, of the region's big-box space has been on the market for a year or moreand, in a number of cases, for several years. These longer-term vacancies primarily emanated from bankruptcies or downsizings at such retailers as The Great Atlantic & Pacific Tea Co. (which subsequently emerged from Chapter 11), Levitz, Linens 'n Things, Circuit City, Office Depot, Value City, and, more recently, Borders. All told, those chains accounted for approximately 726,000 square feet of vacant space along the four corridors this year, down from 953,000 square feet in 2011a net absorption of 227,000 square feet.
A&P's Chapter 11 remained the biggest contributor to the region's big-box vacancies, with four Pathmark stores aggregating approximately 218,000 square feet still available since last year. The only location absorbed since the 2011 survey was a 59,700-square-foot former A&P in East Brunswick that was snapped up by Stop & Shop.
Among the other chains that shed multiple locations in the region, Office Depot's five stores totaling approximately 118,000 square feet are all still empty; three Linens 'n Things totaling 98,000 square feet remain available following the absorption of two locations aggregating 69,000 square feet on Route 35 to Best Market in Holmdel and Lord & Taylor Home in Shrewsbury; the long-vacant 82,000-square-foot Levitz on Route 35 in Wall is still unclaimed, while Ashley Furniture took the chain's 70,000-square-foot showroom in Eatontown; the former 126,000-square-foot Value City at Seaview Square on Route 35 is still available, but the bulk of the remaining 53,000 square feet in the chain's former building at the Manalapan Epicenter on Route 9 is now being subdivided for Sports Authority and a 6,000-square-foot tenant that's in negotiations, leaving just 5,300 square feet. These newcomers to Manalapan will join the PC Richard and Son that opened last year in a deal brokered by R.J. Brunelli, which is the exclusive leasing agent for the property. Meanwhile, the region's one remaining former Circuit City--a 32,000-square-foot space at Woodbridge Crossing on Route 1--remains available, while two Borders along the corridors totaling over 52,000 square feet are empty, as the West Windsor location closed in last year's survey was joined this past year by the site in Eatontown.
The other major bankruptcy contributing to the spike in 2011 vacancies, Blockbuster, continued to have an impact in 2012. Of the 13 locations aggregating 74,000 square feet that were closed along the corridors last year, just one on Route 35 in Ocean Township was leased to a 3,600-square-foot yogurt shop.
"The drop in central New Jersey's retail vacancy rate from 10.5% to 9.1% this year confirms that fact that the retail space market has 'bottomed out.' I believe its recovery will accelerate through 2013, especially if the national Presidential election results in business friendly regulations with no increase in taxes and if the financial crisis in Europe is solved," Mr. Brunelli said.
See original here:
Retail Vacancy Rate In Central NJ Drops To 9.1% Following Numerous 'Big Box' Absorptions, According To R.J. Brunelli ...
Category
Retail Space Construction | Comments Off on Retail Vacancy Rate In Central NJ Drops To 9.1% Following Numerous 'Big Box' Absorptions, According To R.J. Brunelli …
-
June 23, 2012 by
Mr HomeBuilder
DENVER--(BUSINESS WIRE)--
In a dedication ceremony held today with national and regional customers, Johns Manville (JM), a Berkshire Hathaway company and a leading global manufacturer of energy-efficient building products, celebrated the opening of its new commercial roofing single-ply membrane manufacturing facility in Milan, Ohio. The production facility will manufacture Ethylene Propylene Diene Monomer (EPDM) roofing products.
During the dedication, JM Chairman, President and CEO Todd Raba said, We are delighted to deliver on our commitment to our customers and dedicate JMs newest manufacturing facility one of 40 JM facilities across the globe. Our new EPDM plant here in Milan is a state-of-the-art facility with world-class capabilities and were proud to showcase it today. The facility is the companys third manufacturing operation in Ohio, and establishes a Roofing Systems presence to join JMs Insulation Systems and Engineered Products businesses, which have facilities in Defiance and Waterville, Ohio, respectively.
This is the right time to invest in enhancing our product portfolio and JM now has the broadest offering of commercial roofing products in the industry, added Bob Wamboldt, vice president and general manager of JMs Roofing Systems business. With over $125 million invested in our commercial roofing business over the past five years, we are truly stepping up to our commitment to our customers. JM has dedicated substantial resources to underscore our commitment to the single ply business and ensure a strong future for our customers in this segment of the commercial roofing industry.
EPDM is a thermoset synthetic rubber single-ply roofing membrane known for its durability, ease of installation and superior weathering characteristics. Approximately 80 percent of the EPDM market is located in the Midwest and Northeast. JM strategically selected a location close to the majority of its customers to ensure the most efficient delivery. The new facility, a former rubber manufacturing plant, has approximately 100 million square feet of manufacturing capacity and is the second Roofing Systems facility opened by JM since 2008 when the company opened its Thermoplastic Polyolefin (TPO) plant in Scottsboro, AL.
About Johns Manville
With over 150 years of success that began in the roofing business, Johns Manville, a Berkshire Hathaway company (NYSE: BRK.A, BRK.B), is a leading manufacturer and marketer of premium-quality products for building insulation, mechanical insulation, commercial roofing, and roof insulation, as well as fibers and nonwovens for commercial, industrial, and residential applications. JM serves markets that include aerospace, automotive and transportation, air handling, appliance, HVAC, pipe and equipment, filtration, waterproofing, building, flooring, interiors, and wind energy. In business since 1858, the Denver-based company has annual sales of approximately $2.5 billion and holds leadership positions in all of the key markets that it serves. JM employs approximately 6,600 people and operates 40 manufacturing facilities in North America, Europe and China. Additional information can be found at http://www.jm.com.
Photos/MultimediaGallery Available: http://www.businesswire.com/cgi-bin/mmg.cgi?eid=50321045&lang=en
MULTIMEDIA AVAILABLE:http://www.businesswire.com/cgi-bin/mmg.cgi?eid=50321045&lang=en
Read more from the original source:
Johns Manville Opens New Commercial Roofing Systems Facility in Milan, Ohio
Category
Roofing | Comments Off on Johns Manville Opens New Commercial Roofing Systems Facility in Milan, Ohio
-
June 23, 2012 by
Mr HomeBuilder
By RONNIEBLAIR | The Tampa Tribune
Published: June 22, 2012
NEW PORT RICHEY - When school resumes in August, anytime Principal Ken Miesner wants to make sure his students are where they are supposed to be it might not be that difficult.
He can just step out onto a second-story balcony overlooking a courtyard between two classroom buildings at Richey Elementary.
Most of the student comings-and-goings will be right before his eyes.
That view wasn't a possibility in the past. But then, the 2012-13 version of Richey Elementary won't be the same school the community has known since the 1950s.
Richey is undergoing a $15.6 million reconstruction. The project began after the school district conducted a study to determine whether it was more cost effective to renovate the aging school or tear it down and start over.
The verdict: Tear it down.
That meant this past school year, much of the campus was blocked off to students and teachers. They remained in the old Richey Elementary while construction workers from Cutler Associates Inc. of Tampa were building the new Richey Elementary on the other side of a fence.
John Petrashek, the school district's director of new construction, said it can be difficult, but worth it, for a principal to give up most of the campus over the course of a school year while construction crews swarm the place.
More:
New school passes
-
June 23, 2012 by
Mr HomeBuilder
A donation of $2,600 from Bremer Bank in Crookston to the Mount Saint Benedict will go toward the replacement of windows in the Good Shepherd Hall.
Together with funds raised by Mount Saint Benedict and funding from the Tri-Valley Opportunity Council, Inc. work will now begin in replacing many of the windows in the Good Shepherd Hall, allowing for energy conservation, warmth and comfort to the residents of this facility for aging sisters at the Mount.
In an energy audit of the Good Shepherd Hall done in the spring and summer of 2009 it was discovered that significant energy conservation measures were needed to bring the facility up to new and modern standards of energy conservation.
Tri-Valley initiated the energy audit and sought funding from the Minnesota Department of Commerce through the American Recovery and Reinvestment Act of 2009. It was later determined by the funding source that the work could not go forward due to technicalities of eligibility.
Still, with the commitment of the Mount Saint Benedict, Great Plains Natural Gas and the work of Tri-Valley, funds were raised from private individuals and groups to afford the attic insulation and air sealing of the Good Shepherd Hall with work completed in the spring of 2011. Nearly $5,000 in cost savings were achieved the first year. Left to be completed was the replacement of sixty-eight windows.
Read the original here:
Bremer donation boosts comfort, efficiency at Mount St. Benedict
Category
Window Replacement | Comments Off on Bremer donation boosts comfort, efficiency at Mount St. Benedict
-
June 23, 2012 by
Mr HomeBuilder
Making a few easy changes around the house can mean substantial savings. Here are sixsimple fixes we found courtesy of Real Simple.
1. Seal sneaky leaks. Seal electrical outlets in the exterior walls of your house. Foam insulating gaskets act as a barrier so conditioned air stays in, rather than leaking out. Just unscrew the outlet cover, install the gasket, and replace the cover.
2. Go with the flow. Install a high-performance showerhead. This uses 1 gallons of water per minuterather than 2 gallons. By switching, a family of four (each person taking daily 10-minute showers) could save about $88 a year on water and energy costs with gas water heating and $135 a year with electric, according to figures from the DOE Federal Energy Management Program.
3. Swap out bulbs. Replace incandescent bulbs with CFLs (compact fluorescent lightbulbs). A $10 CFL uses about a quarter of the wattage of an incandescent bulb, which amounts to more than $30 in savings per replaced bulb over the lifetime of the CFL.
4. Wash clothes in cold water. You may already know that this saves energy, but do you know how much? "Up to 90 percent of the cost of washing clothes comes from heating the water, so use hot water only for very dirty clothes," says Adam Gottlieb of the California Energy Commission. Another tip: "Match the water level to the amount of clothes, or wait to wash full loads," suggests Clement. "The water savings can be enormous."
5. Close (or open) your blinds. Leave blinds down on south- and west-facing windows on hot summer days to keep your space cool. "This prevents the sun from warming your home and making your cooling system work harder," says Clement. "In winter, leave blinds up to allow the sun to help heat your home."
6. Upgrade your heating (and cooling) system. Install (and properly program) a programmable thermostat. A programmable thermostat costs $50 to $80, is easy to install, and can save about $180 a year. You can shave 2 percent off your heating (or cooling) bill for each degree you lower (or raise) the thermostat for at least eight hours a day while you're away from home or asleep.
For more ways to cut your energy bill, click here.
See original here:
6 simple energy-saving home fixes
-
June 23, 2012 by
Mr HomeBuilder
Printer-friendly versionSend to friend
BISBEE City buildings will be getting some insulation to help cut heating and cooling bills at city hall, public works and the library thanks to an $11,936grant.
Andy Haratyk, operations manager of Public Works, explained that the state called the city and said there was some money left in the Energy Efficiency Conservation Block Grant pot from the governorsoffice.
The city was granted money from a previous EECBG to provide new double-pane windows for city hall to save on heating and coolingbills.
They were so impressed with us and the good work weve done weve sort of become a poster child for our handling of this grant, addedHaratyk.
He was asked if there was any additional energy conservation work that the city could do and he indicated there was. The money from this grant, which requires no city match of dollars, will add insulation to city hall, the public works building and the Copper Queen Library, according to the grantapplication.
Wasting no time, public works immediately put the project out to bid and the council awarded Arizona Comfort Systems the contract to install the insulation for $10,934. The company will use a natural blend of cellulose and fiber insulation. The company also agreed to repair a few holes in one of the ceilings at cityhall.
The truth in taxation hearing was held as required by law raising the property tax from $2.0363 to $2.1577 per $100 of assessed value that will generate an additional $27,857 for the general fund. The raise was necessary to make up for the $1 million loss in city property values as determined by the county Assessors Office, explained city Finance Director DeeFlanagan.
No one from the public offered an opinion during the publichearing.
The council unanimously approved the 2012/2013 budget of $24,869,653, again with no publicinput.
See the original post:
Grant to help cut costs to cool, heat Bisbee City Hall
-
June 23, 2012 by
Mr HomeBuilder
DOWNTOWN LOS ANGELES - One of the most notorious blight spots in Downtown may not only be getting a new federal courthouse in a few years. There could also be a second building coming to the hole in the ground at the southwest corner of First Street and Broadway.
Officials with Congresswoman Lucille Roybal-Allards office announced on Friday afternoon that the General Services Administration plans to transfer ownership of the Spring Street Courthouse, which is set to be vacated, to a developer.
The developer, in exchange, would be required to build a new federal office building with a similar value to the Spring Street courthouse on the First and Broadway site.
I applaud GSA Acting Administrator Dan Tangherlini for finding an innovative,practical, and fiscally responsible solution to meet our judiciary and federal workspace needs in downtown LA, said Roybal-Allard in a statement.
According to a spokesman for Roybal-Allards office who did not want to be identified, the 1938 building at 312 N. Spring St. is valued at $53 million. That means a developer would have to build an approximately 150,000 to 175,000-square-foot building on the 3.6 acre site that will also house a $400 million federal courthouse set for completion in 2017.
Once the new federal office building is completed, the developer would then be the new owner of the Spring Street Courthouse building. If the plan comes through, it could be a stunning turnaround for a Civic Center property that has been a vacant blight for years.
Congress had long ago appropriated $400 million to build a 41-room courthouse on the site immediately west of the Los Angeles Times headquarters.
Since then, the General Services Administration, which acts as a landlord for federal agencies, spent $16.9 million to acquire and prepare the site, and another $16.3 million on designs for a 41-room courthouse. The project hit a wall in 2008 when due to delays and design changes, estimated costs tripled, making a 41-room courthouse impossible to build.
The Downtown community was surprised when in January Roybal-Allards office announced that that project was back on track with plans to build a smaller, $400-million federal courthouse with 110 parking spots, 24 courtrooms and 32 judges chambers.
As part of the new federal courthouse plan the 1938 Spring Street Courthouse, which along with the 1992 Roybal Federal Building currently house federal courthouse operations, would be vacated with all its operations relocated to the new courthouse.
More:
New Federal Office Building Planned at Civic Center Site
-
June 23, 2012 by
Mr HomeBuilder
wwltv.com
Posted on June 22, 2012 at 10:46 AM
WASHINGTON A new building for the coroner's office and help shoring up some buildings on Tulane's campus will all come from $7.9 million in federal funding, it was announced by U.S. Senator Mary Landrieu and U.S. Rep. Cedric Richmond Friday.
The money is for hurricane recovery efforts in Louisiana with the grants being provided by FEMA.
A news release from Landrieu detailed the money to be spent, including:
- $1.9 million to the administrators of the Tulane Educational Fund for measures to protect the Wilson Athletic Center Facility, located on Tulanes campus, from future flood damage. The grant will fund the hardening of the facilitys exterior walls, implement self-activating vehicular and personnel flood gates, and add pumps that will work to remove any water accumulation due to leakage or rainfall.
- $3.3 million to the city of New Orleans for flood damage to the Orleans Parish Courthouse building. The money allocated from the grant will go toward the relocation and construction of a new Coroners Office and Morgue, which will be situated at a higher elevation. The Coroners Office and Morgue was located on the first and second floors of the courthouse and suffered flood damage during Hurricane Katrina. The vacated areas of the courthouse will serve as open space once stabilized.
- $2.7 million to the administrators of the Tulane Educational Fund to repair the power plant located on Tulanes campus that sustained up to two feet of floodwater destruction during Hurricane Katrina. The power plant is the source of electrical power distribution, emergency power generation and temperature control for Tulanes facilities.
Visit link:
FEMA grant to help build new coroner's office building in N.O.
-
June 23, 2012 by
Mr HomeBuilder
The regional office of Cornish & Carey Commercial Newmark Knight Frank has sold a long-vacant, bank-owned Roseville office building at 400 Sunrise Ave. along the eastbound lanes of Interstate 80, just south of Douglas Boulevard.
The buyer, Mourier Land Investment Corp. in Roseville, paid $2.75 million.
The three-story building has 53,000 square feet of available office space. Construction on the building ceased three and a half years ago.
Despite the prolonged vacancy, eight offers were received when marketing began on May 2, according to Brian Barnes, the Cornish & Carey senior vice president who brokered the deal.
Copyright The Sacramento Bee. All rights reserved.
Call The Bees Mark Glover, (916) 321-1184.
Read more articles by Mark Glover
What You Should Know About Comments on Sacbee.com
Sacbee.com is happy to provide a forum for reader interaction, discussion, feedback and reaction to our stories. However, we reserve the right to delete inappropriate comments or ban users who can't play nice. (See our full terms of service here.)
Here are some rules of the road:
Read more:
Roseville buyer for long-vacant office building
-
June 23, 2012 by
Mr HomeBuilder
WOLFE ISLAND, ONTARIO, June 22, 2012 Volunteer paramedics on Wolfe Island can now enjoy a brand new accommodations building, which provides them with the amenities of home while on duty.
WolfeIslands volunteer paramedic service is one of only six of its kind in Ontarioand provides essential services to the local community. The new building includes sleeping space, washrooms, a small kitchen and a common room, and will provide off-island volunteers with a dedicated space to prepare meals and rest during prolonged shifts.
Volunteer paramedics provide a vital service to local residents and thanks to Canadas Economic Plan, Wolfe Island volunteers now have a comfortable, safe and secure space to call their own, said Gord Brown, Member of Parliament for Leeds-Grenville, on behalf of the Honourable Denis Lebel, Minister of Transport, Infrastructure and Communities. Our Government is proud to invest in infrastructure projects that contribute to the local economy and promote to the health and safety of families in this region.
The Government of Ontario is committed to investing in infrastructure projects that build stronger communities, strengthen Ontarios economy, and create jobs, said John Gerretsen, Member of Provincial Parliament for Kingston and the Islands. The new ambulance accommodations building will help our volunteer paramedics, support the community and keep residents safe and healthy.
The ambulance accommodations building has improved the quality of life for Wolfe Island volunteer paramedics and in turn has made it easier to attract quality volunteer paramedics to the service, said Janet Gutowski, Warden of Frontenac County. The project has improved the community ofWolfeIslandand is a great example of successful collaboration between the three levels of government.
The governments of Canada and Ontario each contributed $34,000 through the Infrastructure Stimulus Fund toward eligible project costs. The County of Frontenac contributed the balance of the total project cost of $236,402.
As part ofCanadas Economic Action Plan, the Infrastructure Stimulus Fund supported more than 4,100 projects across the country, including over 2,000 key infrastructure projects inOntario.
Investing in infrastructure is a key part of the Government of Canadas plan to create jobs, generate economic growth and ensure long-term prosperity. Over the course of the summer, the Government of Canada will be engaging provinces, territories and stakeholders in a series of roundtables to develop a new long-term infrastructure plan. This plan will focus on investments that support job creation and economic growth, while building strong, prosperous communities across the country. In addition, the Government of Canada will hold a roundtable with national stakeholders and representatives of the private sector at the end of the summer. Working together to develop this plan will provide new opportunities for all orders of government and the private sector to build partnerships to improve public infrastructure inCanada.
This project also supports Building Together, the Government of Ontarios long-term infrastructure plan to repair, rebuild and renew the provinces roads and highways, bridges, public transit, schools and postsecondary institutions, hospitals and courthouses.Ontariois investing $12.8 billion in infrastructure projects in 2011-12, bringing the governments total infrastructure investments since 2003 to $75 billion. Building modern, efficient infrastructure has created or preserved close to 100,000 jobs each year, on average, makingOntarios economy more productive and improving quality of life, now and in the future.
Excerpt from:
Construction Complete on Wolfe Island's New Ambulance Accommodations Building
« old Postsnew Posts »