Home Builder Developer - Interior Renovation and Design
-
May 6, 2012 by
Mr HomeBuilder
Saturday, May 5, 2012
MAYOR Mauricio Domogan expressed concern over the unreleased funds for the Irisan Controlled Dump Facilitys retaining wall.
Funds that were promised by the National Government are needed badly to rehabilitate the damaged portion of the wall where the trash spilled over. The amount of P80 million will come from the Department of Public Works and Highways fund, Domogan said.
Have something to report? Tell us in text, photos or videos.
The mayor said documentary requirements asked by the National Government have been complied, including the program of work for the rehabilitation of the retaining wall.
We really need to repair the wall immediately, hopefully funds will be released before the onset of the rainy season, Domogan said.
City Environment and Parks Management head Cordelia Lacsamana is now coordinating with the City Engineers Office for the possibility of re-profiling its present slope. (Paul Rillorta)
Published in the Sun.Star Baguio newspaper on May 05, 2012.
Here is the original post:
Mayor prays for release of funds for dumpsite
Category
Retaining Wall | Comments Off on Mayor prays for release of funds for dumpsite
-
May 6, 2012 by
Mr HomeBuilder
The Massachusetts Land Court decision issued last month affirms what was established two years ago that Borden Light Marina Inc. built a 630-foot concrete retaining wall without permits while the marina president, Michael Lund, was a member of the City Council.
The finding of facts and decision by Associate Justice Judith Cutler in favor of The Landing at South Park Condominium Association said Borden Light did not obtain permits before doing the work.
Director of Inspectional Services Joseph Biszko supplied the building permit Borden Light obtained on April 29, 2010 months after the wall was built.
They had already put it up. They put it up without a permit, Biszko said.
He said the department issues a verbal warning for a first-time offense and doubles the permit fee for a second one.
Biszko issued the building permit to Robert Guay of Fall River, the structural engineer, based on an estimated $76,000 cost for the wall.
The permit fee was $702, and James Furtado Excavating of Swansea built the wall, according to city records.
There are also questions both in Cutlers court decision and in Guays engineering report about the walls safety.
Guay wrote on April 22, 2010, that a section of wall is higher than the existing design of the wall will allow, and there is no geo-fabric at each level. ... The wall in this section will have to be down and rebuilt per design drawings also submitted, according to inspection records.
There are no indications replacement work has taken place in the past two years.
Read the original post:
Judge says Borden Light Marina built wall without permits
Category
Retaining Wall | Comments Off on Judge says Borden Light Marina built wall without permits
-
May 6, 2012 by
Mr HomeBuilder
A portion of a stone retaining wall between a house at 66 Adams Ave. and 83 Hill St., caved in Thursday, leaving big hunks of debris in the driveway at the Hill Street residence.
The wall is on the Adams Avenue property. A neighbor said there was no question the wall would eventually collapse, the only question was when.
Im glad no one got hurt, commented Karen Booth, who has lived at 83 Hill St. for about 19 years.
Booth said young children were playing near the wall Wednesday night.
As you can see, more is going to come down anytime now, she added.
A portion of the wall gave away early Thursday afternoon. A worker who said he was employed by the landlord of the Adams Avenue property arrived shortly after the wall collapsed to do the clean up. That work was completed, and yellow caution tape was strung around the area.
Jeff Johnson, Hornell codes enforcement officer, said he spoke with landlord Dean Hoag Thursday to make sure the debris would be cleared away. Johnson also spoke with Booth. Johnson also said the landlord must find a permanent solution for the wall.
I am going to stay on it and see to it that it gets fixed, Johnson said.
The rest is here:
Portion of retaining wall collapses in Hornell, no one hurt
Category
Retaining Wall | Comments Off on Portion of retaining wall collapses in Hornell, no one hurt
-
May 6, 2012 by
Mr HomeBuilder
LITTLE FERRY - Plans have been made by the borough to replace a retaining wall at Indian Lake Park. The project went out to bid April 26.
"As things get older, they become less safe and need to be replaced," said Borough Administrator Michael Capabianco. "The [existing wall's] timbers are 20 to 30 years old and starting to decay."
Borough Engineer Ken Job noted the retaining wall is necessary.
"The old one is falling over," he said. "There's a difference in grade between the walkway and park and adjacent ground. The wall works between the change in grade. The wall is vertical."
"The ground is on one level. Then there's a vertical wall and the ground at another level," he explained.
Concrete blocks will be used in the new wall, Job said, adding it is referred to as a modular block reinforced-earth retaining wall.
"With reinforced earth, when soil is put behind it, they compact the soil so it also acts as support," he said.
The new wall will be the same dimensions as the existing one: roughly 730 feet in length by 3 feet in height, according to Job.
The wall is located along Indian Lake Road.
Bids for the new retaining wall are due May 8. Capabianco said the project will be paid for with an approximately $110,000 county Open Space grant from two years ago as well as with borough capital funds.
Go here to read the rest:
Little Ferry out to bid for park retaining wall
Category
Retaining Wall | Comments Off on Little Ferry out to bid for park retaining wall
-
May 6, 2012 by
Mr HomeBuilder
COURTHOUSE A Phoenixville home-improvement contractor has admitted to deceiving his Upper Merion customers by falsely claiming to have the proper permits to build decks to their homes.
Joseph L. Brown, 49, of the 200 block of Carolina Avenue, pleaded guilty in Montgomery County Court to a misdemeanor charge of deceptive business practices in connection with his contact with two Upper Merion residents who hired him to build outdoor decks in 2010.
Judge Garrett D. Page deferred sentencing until a restitution hearing can be held. Brown, who remains free on bail pending sentencing, faces a possible maximum sentence of 2 to five years in prison on the charge.
This case involves a contractor who entered into an agreement with two different homeowners to build decks on their homes and the decks were not completed and construction was stopped because the proper permits were not in place, alleged Assistant District Attorney Bradford Richman.
Richman characterized the incidents as quality-of-life crimes because the victims spent their hard-earned money to invest in their homes and were duped.
Other charges of theft by deception and receiving stolen property are set to be dismissed against Brown, whom defense lawyer Daniel McCartney is representing, when he is sentenced.
An investigation began on May 24, 2010, when an Upper Merion building official got an anonymous complaint that decks were being built on homes in the Copper Mill Station development on Lawndale Avenue.
When building officials investigated the complaint, they saw a deck under construction at one home in the 200 block of Lawndale Avenue while a new deck ledger board was installed at a second nearby home, according to the criminal complaint that Upper Merion Det. Steven E. Geckle filed.
Inspection of the records indicated that no permits were applied for or issued for any construction at the properties, Geckle alleged in the arrest affidavit.
Township officials saw Brown working on one of the decks. When they asked him about the decks, he told them he was building them some friends, according to arrest documents. Township officials then stopped the jobs and instructed Brown to apply for permits and to provide the township with his contractor licensing information, according to the criminal complaint. Continued...
Continue reading here:
Contractor admits to deceptive business practices in Upper Merion
Category
Decks | Comments Off on Contractor admits to deceptive business practices in Upper Merion
-
May 6, 2012 by
Mr HomeBuilder
Event kicks off outdoor eating season
Despite the steady rain, patrons enjoy lunch at The River House in Portsmouth on Friday as part of the Greater Portsmouth Chamber of Commerce's Hit the Decks day.Rich Beauchesne/rbeauchesne@seacoastonline.com
PORTSMOUTH A lack of sunshine did little to deter Seacoast residents from flocking to local dining establishments and merchants Friday on the second annual Hit the Decks day.
Despite the rainy weather, diners hit some of the indoor decks downtown, as well as several other restaurants taking part in the day.
Organized by the Greater Portsmouth Chamber of Commerce, Hit the Decks is considered to be the official opening of the decks and patios for eateries throughout the downtown.
Restaurants and business offered special deals to attract customers.
Although no one was on the outside deck of the Old Ferry Landing on Friday afternoon, owner Jack Blalock said the day was not a bust. Diners wandered in to take advantage of food and drink specials, he said.
"That's the nature of my business anyway," Blalock said.
Over at The River House, owner Peter Labrie was still able to offer outdoor seating thanks to a retractable roof on his upstairs and downstairs decks.
Labrie said the weather made little difference in the attitudes of his customers on Friday.
Continued here:
Rain doesn't deter deck diners
Category
Decks | Comments Off on Rain doesn't deter deck diners
-
May 6, 2012 by
Mr HomeBuilder
ESSEX Monday's Town Meeting has 40 articles on the warrant.
But the primary focus of the debate is expected to center on one issue the future of the properties at Conomo Point.
The first six articles are devoted to Conomo Point issues, a proposed town budget of $15.6 million with $6.4 million for education, and a sewer service bylaw.
The annual gathering of the town's registered voters will be held Monday at 7:30 p.m. at Essex Elementary School, with registration to begin at 6:30 p.m.
Townspeople are encouraged to show up early, since the turnout is expected to be very high, town officials said; if the meeting runs too late, it may be extended to Tuesday.
At Special Town Meeting, just held April 25, an article that would allow the town to offer the current tenants the right of first refusal to buy the properties an article some officials expected to pass easily barely squeaked through at 144-141.
Monday, Town Meeting will take up the issue of allowing the possible sale of the properties south of Robbins Island Road, with the article authorizing the selectmen to take any and all actions relating to the properties.
Another potential flashpoint will be the proposed zoning bylaw for Conomo Point. The version contained in the warrant that is publicly available, however, has undergone significant changes enough so that the Planning Board is not recommending the article's approval Monday night.
"The board has specific concerns relative to the proposed dimensional requirements and the time available to review the documents," the Planning Board said in its report.
Resident Bruce Fortier said he did not think enough time was given to read the proposed changes, though Town Administrator Brendhan Zubricki said the town's Boston-based law firm of Kopelman and Paige ruled the edits acceptable and that changes would be made at Town Meeting. Members of the Planning Board agreed with Fortier, and voted not to recommend the article, without prejudice.
Link:
Essex Town Meeting has Conomo Point focus
-
May 6, 2012 by
Mr HomeBuilder
Stephanie Klein-Davis | The Roanoke Times
Robert Morris, 83, of northwest Roanoke, dances to music on Saturday in front of the former Claytor Clinic in the Gainsboro neighborhood.
In the old days, people would gravitate to their front porches in the summertime, where they would talk to their neighbors and interact with the community.
"Air conditioning has been our worst enemy, said Bob Clement, neighborhood service coordinator for Roanoke. "When it was invented, everybody started hanging out indoors."
But during the next few weeks, neighborhoods across Roanoke are coming together to pull people outside for block parties and picnics, yard sales and street fairs. These events are in honor of Neighborhood Month, a celebration of community and neighborhood pride hosted by Roanoke's neighborhood organizations.
The Gainsboro neighborhood of northwest Roanoke helped kick off the celebrations Saturday with its first community celebration and block party. Streets were blocked off near the Gainsboro library for free hot dogs, music, face painting and a martial arts show. Free health screenings and voter registration also were available.
"I see a whole lot of people here I haven't seen in a long time," said Calvin Bradshaw, who has been a resident of the Gainsboro neighborhood for 54 years, as he waved to a friend. "Anything like this is good for the neighborhood. It brings people together to talk about things and ways to improve the neighborhood. I wish they'd have more of these events."
In 2003, eight to 10 organizations were participating in National Night Out to fight neighborhood crime every year in August. However, every celebration was on the same night, at the same time, which meant city council members couldn't support all of them and neighborhood residents couldn't attend one another's events.
"I thought, why not do something in the spring where neighborhoods come out, not just to fight crime, but celebrate their accomplishments," Clement said. Roanoke first celebrated Neighborhood Month the next May, with events scattered throughout the month.
Although Gainsboro hasn't had an event like this in years, all ages of neighborhood residents and visitors were out in full force. Children got their faces painted like tigers and butterflies, adults and clowns did line dances together in a cul-de-sac, and balloon animals dotted the crowd.
Continued here:
Community camaraderie: Gainsboro block party could become annual event - http://www.roanoke.com
Category
Porches | Comments Off on Community camaraderie: Gainsboro block party could become annual event – www.roanoke.com
-
May 6, 2012 by
Mr HomeBuilder
MOBILE, Ala. (WALA) - Historic Mobile Preservation Society will host the first annual Oakleigh Porch Tour on Saturday, May 5, from 10:00 a.m. until 4:00 p.m. in the Oakleigh Garden Historic District.
Come, visit, sit a spell and see why our porches are truly the Parlors of the South, stated Renea Greene, Oakleigh Porch Tour Chair. Listen to stories, chat with neighbors and absorb the history of how some of these porches came to be. Start your summer on the right foot; step back in time and enjoy the day in Oakleigh. We are looking forward to your visit.
This event allows HMPS to showcase the lifestyle of this very historic and close-knit neighborhood in a casual presentation, stated Rhonda Davis, executive director of HMPS. May is National Historic Preservation Month and we want to celebrate Mobiles preservation legacy by creating a fun event that allows the public to meander through and explore one of our most loved historic districts. This tour will do just that.
Twelve beautifully restored and decorated porches will be open for the tour, along with lemonade stands, dog watering stations, and surprise entertainment along the way. The afternoon will end with a Porch Play at the Cox-Deasy Cottage at 4:00 p.m.
The Benson Home 202 Rapier Avenue 1908 Italianate
The Burns Home 1160 Church Street 1896 eclectic Queen Anne
The Cummings Home 1011 Augusta Street 1904 Coastal traditional and Colonial
The Garrett-Cumbie Home 1104 Palmetto Street 1927 Arts & Crafts Craftsman Cottage
The Grill Home 1124 Palmetto Street 1930 Arts and Crafts Bungalow
The Harrell Home 1156 Palmetto Street 1899 Queen Anne transitional to Colonial Revival
Follow this link:
Take the Oakleigh Porch Tour
Category
Porches | Comments Off on Take the Oakleigh Porch Tour
-
May 6, 2012 by
Mr HomeBuilder
Category
Church Construction | Comments Off on Cerca Church Construction Assembly Line Pour – Video
« old Postsnew Posts »