Home Builder Developer - Interior Renovation and Design
-
April 8, 2015 by
Mr HomeBuilder
Plus: Herbal Remedy Ah, spring, when Columbians thoughts turn to eating outdoors. Unfortunately, if youre like me, your porches are coated in pollen and your porch chairs from Target are gobbed with robin poop, so your thoughts are turning to eating on someone elses porch.
Fortunately, any number of local restaurants and bars have nicer porches than us. Here are some favorites, new and old.
Downtown
Just last week, the Marriott on Main Street set up outdoor tables at Main and Hampton, with a full menu and wait service from Midlands Food Arts outside.
Other places to dine outdoors on Main Street include longtime favorite Hampton Street Vineyard and newcomers Oak Table, Bourbon, Cantina 76, Michaels, Good Life Caf and Cowboy.
Just want to drink? The Sheraton Rooftop Bar is a gorgeous place to be, with a 280-degree view of the city. (Why isnt this bar open during the day? Why doesnt it have draft beer? Serious missed opportunity.)
Vista
In the Vista, al fresco options include World of Beer, Wild Hare Sports Bar and the nice big second-story deck at Carolina Ale House. Flying Saucer has a covered porch; so does Motor Supply Co. Bistro. And the new Hickory Tavern has a two-story deck.
Across the river in Vista West, Terra has a nice outdoor area, @116 State has some sidewalk tables and Caf Strudel has a deck.
Five Points
Read more from the original source:
Where to Eat Outside
Category
Porches | Comments Off on Where to Eat Outside
-
April 8, 2015 by
Mr HomeBuilder
Our house is built up off the ground with the first floor at about 10 feet up. Two sides of the house have porches that are underpinned with wooden lattice, an ideal surface for growing a number of perennial vines. By planting an assortment of evergreen and deciduous vines that flower at different times, we (and the birds, bees and butterflies) are able to enjoy foliage and flowers almost year-round.
Here is a list of the vines: Cross vine (Bignonia capreolata), Carolina jessamine, Confederate jasmine, autumn clematis, three native honeysuckles, an akebia and Lady Banks rose (not a vine but a runner).
Of all the vines, two of the honeysuckles are the least vigorous in our situation, most likely because they are located on the shadier side of the house. The cross vine and the Confederate jasmine have been the most vigorous and have to be periodically cut back quite severely. Two years ago, the cross vine had its heavy pruning. This year it was the jasmines turn.
This winter was rough on the jasmine. There were a lot of dead leaves and vines with only a few of the main vines showing signs of life. Working from the porch at the top and then from the ground level, I cut and pulled and raked until all that was left were three or four main vines with a couple of sprouts on them. A 20-year-old vine can put on a lot of growth, and I had just removed a pickup truckload of debris off this one.
Stepping back to take a look, I saw that the section of trellis where the jasmine was cut back looked naked, but a few feet over was a cascade of foliage and flowers where the cross vine thrived. I knew it would not be long before the jasmine grew back out, healthier than ever, just as the cross vine had.
Cutting back an old, overgrown vine can be even more daunting than doing a heavy pruning on a shrub or tree. It can be hard to distinguish the live wood from the dead or damaged vines. Removing what you cut out is like getting the knots out of a wad of string it takes patience and sometimes a few extra snips.
Dont be afraid to take the clippers to a vine that has gotten so overgrown that it no longer thrives. A woody vine that has outgrown its support structure is not only unattractive but is likely to end up in a heap, taking the lattice work or trellis with it.
Most woody, perennial vines are best cut back in late winter. I really was running a bit late for doing a heavy cut-back on the jasmine, but now it is done. I dont expect much bloom out of it this year. But by next year, the foliage should be lush once again and come late spring, the sweet fragrance of a multitude of blooms should waif up and into our home.
To learn more about some great vines for our area, see Clemson Extension's publication at http://www.clemson.edu/extension/hgic/plants/ landscape/groundcovers/hgic1101.html.
Excerpt from:
Digging In: Vine control
Category
Porches | Comments Off on Digging In: Vine control
-
April 8, 2015 by
Mr HomeBuilder
Fire forces bridge players to evacuate Portsmouth church
PORTSMOUTH Crews descended on the First United Methodist Church Tuesday to begin making repairs and cleaning up after a fire broke out in the area of a wall around a front door Monday afternoon.
Fire damage was confined to the wall and door that leads to a hallway outside an activities room, but smoke filled the church, leaving soot in the sanctuary and other rooms and a smoky smell throughout the stone building that dates to the early 1900s.
Fire officials continue to investigate the cause of the blaze, which began just before 1:30 p.m. at the church on Miller Avenue.
Workers from Insurcomm Construction of Portsmouth spent Tuesday scrubbing the inside walls, floors, ceiling and stained glass windows to remove the soot and the odor of smoke.
Outside, carpenters began rebuilding the damaged doors that were removed from the arched front doorway.
Pastor Sue Ellery said the work is expected to be completed in time for the church to hold a memorial service on Saturday, and its weekly worship service on Sunday.
We have a building full of people at work, she said.
Clear plastic was placed over the pews and other furniture as crews cleaned up. Rugs, cushions and fabrics also had to be treated while equipment was brought in to remove the smell of smoke.
Ellery isnt sure how much the repairs and cleanup will cost, but said the church has insurance that should cover the bill.
See the rest here:
Cleanup begins after Portsmouth church fire
-
April 8, 2015 by
Mr HomeBuilder
Kansas City firefighters rescued two workers overcome by fumes at a church under construction on Tuesday.
Six firefighting units were called to 201 Westport Road at 9:45 a.m. for what was called a "confined space" rescue.
Authorities said that two construction workers were overcome by fumes while they were waterproofing a basement area at Westport Presbyterian Church.
James Garrett of the Kansas City Fire Department said the rescue took a while. He said it was difficult figuring out exactly what the situation was before they could go down and rescue the men.
We had to get our meters down there and check the atmosphere to see exactly what we had and get guys down there with air packs to recover the individuals, Garrett said.
Firefighters lowered equipment down to the two men. They said one of them was up and moving, but the other man was unconscious. Crews were able to lift both men out and got them to a hospital for treatment of respiratory stress. Both men are expected to be OK.
Crews said the workers were using chemicals that contain acetone. They said the men should have been wearing masks, but they were not.
Read more from the original source:
Emergency crews rescue 2 workers at church construction site
Category
Church Construction | Comments Off on Emergency crews rescue 2 workers at church construction site
-
April 8, 2015 by
Mr HomeBuilder
Blue skies and warmer temperatures enabled construction workers to apply shingles to the new sanctuary Friday.Beth Mlady/Special to Sun News
BAY VILLAGE, Ohio - New construction continues on schedule and without issue at St. Raphael Catholic Churchon Dover Center Road. Roofers could be seen applying shingles to the new buildings during warmer temperaturesFriday.
The Phase 2 Expansion Projectreceived Bay Village Planning Commission approval in July 2013 and included plans to build a much larger, fan-shaped worship space to allow for 1,100 pew seats and up to 100 choir members. In addition, large gatherings and funeral luncheons will take place in a new community room.
A capital campaign continues to accumulate pledges toward a nearly attained $7 million goal. Ground was broken last summer, and construction was expected to last up to 15 months. The original altar, stained glass windows and crucifix will be reused in the new sanctuary.
Parishioner and project manager Kris McGivney recently expressed her happiness with the way the project is proceeding.
"Things are going extremely well, and we're very excited about it," McGivney said. "I think one of the highlights was a couple of weeks ago when we let people take a walk through the construction to see where we are. They were all very excited about it, to get a feel for what the new church will look like."
Those March 14 and 15 after-Mass visits enabled parishioners to place decorated stones under the location of the future altar,providing a personal and poignant foundation. People also wrote messages and prayers on the unfinished cement floor.
The Rev. Tim Gareausaid Monday he can't wait for the congregation to become permanently settled in its new home. Before then, he added with a laugh, he will need a new pair of shoes to replace his dust-covered ones due to repeatedly walking daily to and from the construction site.
"There is such living faith here," Gareau said about his parishioners. "People are really on board and excited and enthused. We have such a nice team ... here at St. Raphael. It's the hands and hearts of our people. From the smallest among us to the oldest, we're just all working together as a family to make this happen."
Even priests, he explained, have moments of "fear and trepidation" when faced with a task of this magnitude.
View post:
St. Raphael church construction proceeds smoothly in anticipation of August dedication
Category
Church Construction | Comments Off on St. Raphael church construction proceeds smoothly in anticipation of August dedication
-
April 8, 2015 by
Mr HomeBuilder
NEW YORK (CBSNewYork) Good Friday was anything but good for a Bronx church involved in an ongoing rent dispute with its landlord.
The Osborne Association, a nonprofit group that helps men and women coming out of jail to reform their lives, owns the building located at 813 Westchester Ave. in the Morrisania section of the borough.
They lease a portion of the bottom floor to the Word of Life Church, which operates a food pantry that feeds hundreds in the community every week.
The organization claims the church is behind on its rent and started the eviction process last week.
We worked for more than a year to resolve ongoing issues of non-payment with our tenant, but ultimately began eviction proceedings, the group said in a statement.
Marshals went to execute the warrant last Wednesday, but the church got an emergency stay order until April 7.
Osobrne said it hadnt received the papers when they noticed the church back in the building on Good Friday, which is when a representative from the group along with the NYPD came to see what was going on.
Rev. John Udo-Okon told 1010 WINS he was conducting Good Friday service when the property manager tried to break down the door with a sledgehammer.
We were having service and we heard this heavy banging on the door and people began running, Udo-Okon said. Children were running and my wife and I ran from the pulpit.
Udo-Okon said the two police officers had their guns drawn.
Excerpt from:
Landlord Breaks Down Churchs Door On Good Friday Over Rent Dispute
Category
Church Construction | Comments Off on Landlord Breaks Down Churchs Door On Good Friday Over Rent Dispute
-
April 8, 2015 by
Mr HomeBuilder
Crews begin work on sidewalks despite Church Street remaining open on Monday. /Matthew Thielke
OTTUMWA, IOWA -- Rain is already causing some delays to another major reconstruction project on Ottumwas south side before it even started.
Church St. was scheduled to be closed from five corners to Ransom St. starting Monday, but the threat of rain caused crews to push the closure back to possibly Monday night.
Once Church St. closes, it will not reopen until full completion in an estimated 10 weeks.
The city will be taking out all of the street and sidewalk to install new water and sewer lines, as well and installing new sidewalks and streetscape designs.
All of this is starting while city is in the middle of another major project on Richmond Ave., just a few blocks away.
There's also a big project going on through the Richmond Ave. corridor, so really that portion of the Southside is very difficult to travel, said Tom Rodgers, Ottumwa Public Information Officer. Drivers do need to be aware of the detours and plan ahead when traveling to avoid delays.
Businesses on Church St. will remain open during the project and access for cars will be available behind the stores.
Anyone with questions about the construction projects is encouraged to contact the Ottumwa City Engineering Department.
Continued here:
Threat of rain delays Church Street construction
Category
Church Construction | Comments Off on Threat of rain delays Church Street construction
-
April 8, 2015 by
Mr HomeBuilder
Appliance Repairs In Yonkers - Certified Appliance Repair Provider New York
Appliance Repairs In Yonkers, New York (888) 884-4918 http://ApplianceDoctorX.com When your washer or fridge isn #39;t working, the Appliance Doctor professional appliance repair services in Yonkers.
By: Donald Richmond
See the rest here:
Appliance Repairs In Yonkers - Certified Appliance Repair Provider New York - Video
Category
Appliance Repair | Comments Off on Appliance Repairs In Yonkers – Certified Appliance Repair Provider New York – Video
-
April 8, 2015 by
Mr HomeBuilder
Appliance Repairs In White Plains - Appliance Repair Certified Service Provider New York
Appliance Repair In White Plains New York (888) 884-4918 http://ApplianceDoctorX.com When your washer or fridge isn #39;t working, the Appliance Doctor professional appliance repair services in...
By: Donald Richmond
View post:
Appliance Repairs In White Plains - Appliance Repair Certified Service Provider New York - Video
Category
Appliance Repair | Comments Off on Appliance Repairs In White Plains – Appliance Repair Certified Service Provider New York – Video
-
April 8, 2015 by
Mr HomeBuilder
Appliance Repairs In Briarcliff Manor NY - Appliance Repair Certified Service Provider New York
Appliance Repairs In Briarcliff Manor New York (888) 884-4918 http://ApplianceDoctorX.com When your washer or fridge isn #39;t working, the Appliance Doctor professional appliance repair services...
By: Donald Richmond
More here:
Appliance Repairs In Briarcliff Manor NY - Appliance Repair Certified Service Provider New York - Video
Category
Appliance Repair | Comments Off on Appliance Repairs In Briarcliff Manor NY – Appliance Repair Certified Service Provider New York – Video
« old Postsnew Posts »