Categorys
Pages
Linkpartner

    Home Builder Developer - Interior Renovation and Design



    Page 7,308«..1020..7,3077,3087,3097,310..7,3207,330..»



    2G Flooring Installation – Video

    - July 26, 2014 by Mr HomeBuilder


    2G Flooring Installation
    Wicanders cork flooring 2G Valinge Lock Floating Floor Supplied by Ecologic http://www.ecologiconline.com.au.

    By: Ashley Lochland

    Read the original:
    2G Flooring Installation - Video

    Tile Flooring Installers Hinesburg Vermont (802) 310-5284 Vermont Hardwood Flooring Installation – Video

    - July 26, 2014 by Mr HomeBuilder


    Tile Flooring Installers Hinesburg Vermont (802) 310-5284 Vermont Hardwood Flooring Installation
    http://www.chittendenbuilders.com (802) 310-5284 Tile Flooring Installers Hinesburg Vermont (802) 310-5284 Vermont Hardwood Flooring Installations Chittenden Builders your premier Flooring...

    By: VTBuilders

    Read more from the original source:
    Tile Flooring Installers Hinesburg Vermont (802) 310-5284 Vermont Hardwood Flooring Installation - Video

    Owens Corning Basement Finishing Systems Customer ~ Remodel USA 855-525-9000 – Video

    - July 26, 2014 by Mr HomeBuilder


    Owens Corning Basement Finishing Systems Customer ~ Remodel USA 855-525-9000
    Finishing your basement may be one of the easiest ways to add livable space to your home, and if you live in Baltimore, Washington, DC, Fairfax, Woodbridge, Hagerstown, or another nearby area...

    By: Remodel USA

    Read more from the original source:
    Owens Corning Basement Finishing Systems Customer ~ Remodel USA 855-525-9000 - Video

    Clayton's Daniele nears reopening as a Hampton Inn

    - July 26, 2014 by Mr HomeBuilder

    CLAYTON A $15 million renovation that included the addition of a fifth floor has transformed the tired, 1960s Daniele Hotel into a contemporary Hampton Inn and Suites.

    The hotel is scheduled to open next Friday as a Hampton Inn nearly two years after Equis Hospitality Management bought the empty Daniele for $2.5 million in late 2012. Mike Mullenix, chairman and chief executive of Equis, said Friday the remodeling required a total renovation.

    The only things we saved were the exterior walls, he said.

    Adding a fifth floor upped the hotels room count from 82 to 106, including 25 suites. Nightly rates will range from about $149 to $209.

    Opened in 1964 at 216 North Meramec Avenue, the hotel as the Daniele was at times a celebrity hangout, said Mullenix, adding that Cher, Rod Stewart and the Rolling Stones stayed there.

    The Daniele closed in 2007 as part of a renovation plan by its then owner, Conrad Properties. That plan fizzled as the hotel business nosedived along with the rest of the economy during the Great Recession.

    As a Hampton Inn, the hotel is joint venture between Brentwood-based Equis and Rockbridge Capital, of Columbus, Ohio. HBD Construction handled the renovation, which included the rebuilding of deteriorated parts of the buildings basement parking garage.

    New features include an enclosed saltwater pool, a fitness center, a meeting room able to accommodate about 40 people and a bar facing Meramec.

    Mullenix and Mohammed Kashif, the Hampton Inns general manager, said weekday business will come from corporate customers. Such business will skew toward leisure travel by people visiting friends and relatives in the Clayton area.

    Mullenix said he knew when Equis bought the Daniele that it was a good location for a hotel but that his company needed time to determine its best use.

    See original here:
    Clayton's Daniele nears reopening as a Hampton Inn

    VAMC estimates line break will cost $2 million

    - July 26, 2014 by Mr HomeBuilder

    July 26, 2014 VAMC estimates line break will cost $2 million

    By Wendy Holdren Register-Herald Reporter The Register-Herald Sat Jul 26, 2014, 12:01 AM EDT

    BECKLEY

    Officials at the Beckley Veterans Administration Medical Center said damages caused by a main water line break on the first floor last month will cost an estimated $2 million in repairs.

    The water main broke about 6:20 p.m. June 30, flooding the first floor as well as the elevator shaft into the basement.

    Debbie Voloski, public affairs officer at the Beckley VA, said clinics on that floor were canceled the day after the flooding, but those clinics have since been relocated to other areas of the hospital.

    There was extensive damage to the floor and the walls on the first floor, as well as the furnishings and the IT equipment, Voloski said. We are still in the initial phases of recovery.

    She said a company has been hired to bring the facility back to its previous state, and the estimated completion for the remodeling and repairs is eight to 12 weeks.

    E-mail: wholdren@register-herald.com

    See the original post:
    VAMC estimates line break will cost $2 million

    Fruits and vegetables indoor lighting plant lighting lamp – Video

    - July 26, 2014 by Mr HomeBuilder


    Fruits and vegetables indoor lighting plant lighting lamp
    more info you can visit:http://www.lead-lighting.com/led-grow-light/led-grow-light-300w.htm Shenzhen Lead Opto-Technology Co. Ltd is a professional manufactu...

    By: Johnson Dougalas

    Link:
    Fruits and vegetables indoor lighting plant lighting lamp - Video

    Cabinet Refinishing Fullerton CA 1-877-345-6869 | Kitchen Cabinet Refacing Fullerton, CA – Video

    - July 26, 2014 by Mr HomeBuilder


    Cabinet Refinishing Fullerton CA 1-877-345-6869 | Kitchen Cabinet Refacing Fullerton, CA
    Call 1-877-345-6869 to Find Cabinet Refinishing Experts in Fullerton, CA, California today. You will speak with a Remodel specialist about scheduling up to 3...

    By: CabinetRefacing1

    Original post:
    Cabinet Refinishing Fullerton CA 1-877-345-6869 | Kitchen Cabinet Refacing Fullerton, CA - Video

    Cabinet Refinishing Orange CA 1-877-345-6869 | Kitchen Cabinet Refacing Orange, CA – Video

    - July 26, 2014 by Mr HomeBuilder


    Cabinet Refinishing Orange CA 1-877-345-6869 | Kitchen Cabinet Refacing Orange, CA
    Call 1-877-345-6869 to Find Cabinet Refinishing Experts in Orange, CA, California today. You will speak with a Remodel specialist about scheduling up to 3 in...

    By: CabinetRefacing1

    See original here:
    Cabinet Refinishing Orange CA 1-877-345-6869 | Kitchen Cabinet Refacing Orange, CA - Video

    Cabinet Refinishing Salinas CA 1-877-345-6869 | Kitchen Cabinet Refacing Salinas, CA – Video

    - July 26, 2014 by Mr HomeBuilder


    Cabinet Refinishing Salinas CA 1-877-345-6869 | Kitchen Cabinet Refacing Salinas, CA
    Call 1-877-345-6869 to Find Cabinet Refinishing Experts in Salinas, CA, California today. You will speak with a Remodel specialist about scheduling up to 3 in-home estimates with top companies...

    By: CabinetRefacing1

    Visit link:
    Cabinet Refinishing Salinas CA 1-877-345-6869 | Kitchen Cabinet Refacing Salinas, CA - Video

    Cabinet Refinishing Hampton VA 1-877-345-6869 | Kitchen Cabinet Refacing Hampton, VA – Video

    - July 26, 2014 by Mr HomeBuilder


    Cabinet Refinishing Hampton VA 1-877-345-6869 | Kitchen Cabinet Refacing Hampton, VA
    Call 1-877-345-6869 to Find Cabinet Refinishing Experts in Hampton, VA, Virginia today. You will speak with a Remodel specialist about scheduling up to 3 in-home estimates with top companies...

    By: CabinetRefacing1

    Link:
    Cabinet Refinishing Hampton VA 1-877-345-6869 | Kitchen Cabinet Refacing Hampton, VA - Video

    « old Postsnew Posts »ogtzuq

    Page 7,308«..1020..7,3077,3087,3097,310..7,3207,330..»


    Recent Posts