Categorys
Pages
Linkpartner

    Home Builder Developer - Interior Renovation and Design



    Page 9,826«..1020..9,8259,8269,8279,828..9,8409,850..»



    Purdy Crawford Centre for the Arts on track for the fall

    - February 19, 2014 by Mr HomeBuilder

    An inside look at construction work on Mount Allison's Purdy Crawford Centre for Arts.

    Despite the snow and winter temperatures, construction of Mount Allisons Purdy Crawford Centre for the Arts is well on track to welcome its first students this September.

    Passersby will notice recent changes in the facility including the installation of several windows, along with much activity happening inside the building.

    We are installing window frames and windows, and the sandstone and interior block walls are nearing completion, says Ron Eickholt, project manager for the facility. And we are starting to install the drywall, which means we have started finishing individual spaces.

    The electrical wiring has been started and finishing work such as flooring and paint is expected to begin in the spring. The move into the building will not happen overnight, but staff and faculty will begin the process by early July.

    Home to the fine arts and drama programs, the 50,000-square-foot centre has been designed to create a stunning new presence at the northwest edge of campus. The centre includes contemporary art studios with facilities for painting, printmaking, sculpture, photography, and other media. A studio hall features reinforced floors, heightened ceilings, and controlled lighting.

    Eickholt says that the buildings theatre has been specially designed for different types of productions, with sophisticated sound and lighting systems and flexible capacity. The theatre boasts telescopic seating for 84 people, with the potential to expand seating options for much larger audiences.

    The building will house office and seminar spaces and an atrium that will have the capacity to hold receptions and social events, as well as a place for students to exhibit their work and meet to exchange ideas.

    Drama and fine arts classrooms, theatre and rehearsal spaces, studios, and exhibition spaces are currently scattered across campus. The new centre will bring these spaces under one roof, inviting limitless creative opportunities for interaction between fine srts and drama students and faculty.

    This centralized location has been designed to encourage experimentation and exchange, as well as provide opportunities to build a new kind of creative community transforming teaching, learning, and creative pursuits at Mount Allison.

    Read this article:
    Purdy Crawford Centre for the Arts on track for the fall

    Neff Paving & Concrete Driveway Paving & Repair – Video

    - February 19, 2014 by Mr HomeBuilder


    Neff Paving Concrete Driveway Paving Repair
    Neff Paving Concrete expanded to Delaware Ohio servicing all of Central Ohio.

    By: Neff Paving Concrete Driveway Paving Repair

    Here is the original post:
    Neff Paving & Concrete Driveway Paving & Repair - Video

    Navasota ISD Plans $62M Bond Election

    - February 19, 2014 by Mr HomeBuilder

    Navasota ISD Board of Trustees unanimously approved to call a $61,641,801 bond election this May.

    The decision was made Monday evening, as a community committee made the recommendation based on major infrastructure needs throughout the district. Besides a need to improve infrastructure, the bond is an estimated 15-year solution to all campuses that are nearing capacity.

    Superintendent Rory Gesch said, The top concerns are safety and security upgrade, infrastructure needs, technology needs and building capacity. Two propositions are included in the bond election.

    Proposition I includes the following: High school and junior high additions and renovations, estimated to cost $26,818,440; maintenance upgrades $16,357,370; high school career and technology/fine arts $5,747,500; Navasota Intermediate $5,990,710; Webb Elementary $1,034,731; and Highpoint Elementary $1,821,050.

    The most costly includes campus-wide classroom renovations at the high school and junior high school campuses.

    Improvements would also include the addition of a common cafeteria and serving area that would link both campuses together, over 10 additional classrooms and an additional corridor, as well as interior science classroom renovations.

    The common cafeteria is a bi-level, buffet style design that is used at larger high schools, as well as some college campuses.

    During a meeting on Feb. 10, administrators said they visited campuses elsewhere and witnessed lunch lines moving pretty steadily since various foods are offered in different areas of the shared cafetorium.

    Navasota Intermediate School improvements include classroom and rock gym renovations for an 18,400-square-foot classroom and admin area addition, refurbish existing rock gym, a 2,500-square-foot kitchen/cafeteria addition and serving line equipment, and new parking and driveway. The addition of 40 new parking spaces and driveway creates a drop-off loop between the current Intermediate building and Brule. Webb Elementary School site parking and playground improvements presented include the following: New parking to create an additional 132 spaces, driveway paving and playground improvements that include new playground equipment and canopy, and safety and security fencing; demolition of walls to create flex space and add windows.

    Other security renovations include a reconfigured new entry, security entry vestibule, new offices and a new reception area.

    Read the original post:
    Navasota ISD Plans $62M Bond Election

    Cat 385B UHD HD Demolition – Video

    - February 19, 2014 by Mr HomeBuilder


    Cat 385B UHD HD Demolition
    Cat 385B UHD from HD Demolition. It has also the 40m demolition boom. Now it is working with short boom with Verachtert VHS 60/3 scrap shear. HD Demolition h...

    By: Sloop Fan

    Continue reading here:
    Cat 385B UHD HD Demolition - Video

    DEMOLITION SUR BO2 ANNONCE F.A.Q – Video

    - February 19, 2014 by Mr HomeBuilder


    DEMOLITION SUR BO2 ANNONCE F.A.Q
    Utiliser @aZeRvortex sur twitter pour posez vos question partage la sur ton mur facebook si tu veut mon skype:aZeRvortex adresse mail:aubindelestre72@gmail.c...

    By: aZeR vortex

    More:
    DEMOLITION SUR BO2 ANNONCE F.A.Q - Video

    Eco house build 18: demolition – Video

    - February 19, 2014 by Mr HomeBuilder


    Eco house build 18: demolition
    http://www.pumphousebuild.wordpress.com.

    By: og1732

    Read more:
    Eco house build 18: demolition - Video

    ARMA de DOBLE FILO vs FORMOSA STYLE final DOBLES ACDP 2014 – Video

    - February 19, 2014 by Mr HomeBuilder


    ARMA de DOBLE FILO vs FORMOSA STYLE final DOBLES ACDP 2014
    ARMA de DOBLE FILO vs FORMOSA STYLE final http://youtu.be/1axXE48H1F0 FORMOSA STYLE vs MUTANTES KREW semifinal http://youtu.be/cA_hi-7sLHE ARMA de DOBLE FILO...

    By: DEMOLITION RHYMES

    Read this article:
    ARMA de DOBLE FILO vs FORMOSA STYLE final DOBLES ACDP 2014 - Video

    GRID 2 Demolition Derby Glitches with Avidya & Coe – Video

    - February 19, 2014 by Mr HomeBuilder


    GRID 2 Demolition Derby Glitches with Avidya Coe
    The other day I joined Avidya and Coestar during one of Coe #39;s #StreamADay livestreams playing GRID 2. This is the demolition derby free DLC which, as we expe...

    By: kurtjmac

    See more here:
    GRID 2 Demolition Derby Glitches with Avidya & Coe - Video

    NEWS9: BDA’s demolition drive – Video

    - February 19, 2014 by Mr HomeBuilder


    NEWS9: BDA #39;s demolition drive
    BDA acquired property worth 70 crores today but the entire operation left many residents angry and helpless. For more news and updates, visit us at: http://w...

    By: NEWS9

    See original here:
    NEWS9: BDA's demolition drive - Video

    Darling Harbour, Sydney Convention and Exhibition Centre (SCEC) Demolition Aerial Footage – Video

    - February 19, 2014 by Mr HomeBuilder


    Darling Harbour, Sydney Convention and Exhibition Centre (SCEC) Demolition Aerial Footage
    Darling Harbour, Sydney Convention and Exhibition Centre (SCEC) Demolition Aerial Footage. Related SMH article Feb 18th http://www.smh.com.au/nsw/darling-har...

    By: Jamie Andrei

    Originally posted here:
    Darling Harbour, Sydney Convention and Exhibition Centre (SCEC) Demolition Aerial Footage - Video

    « old Postsnew Posts »ogtzuq

    Page 9,826«..1020..9,8259,8269,8279,828..9,8409,850..»


    Recent Posts