If you have a growing family and are in need of more finished living space, you have two choices; increase the size of your existing home or move to a larger one. Selling your existing home and buying a larger one is typically a very expensive endeavor. Not only will the larger home cost more, but then there are all the costs associated with selling your own home and paying all of the related state property transfer taxes. Then there are the moving costs and utility cancellation and new hook up fees. As a result of all of these costs, many homeowners choose to expand their existing home by either adding a room addition onto their home or building a second floor addition.
Deciding on what makes the most sense for your particular needs, in regards to building a second floor addition or building an attached room addition, really depends upon what type of additional living space youre looking for and what your home and lot can physically support. For example, if you have a small lot, then you may not have the space to add on a room addition to the side or back of your house. As a result, your only solution may be to build a second floor addition onto your home.
In general, if you have the land, it is more cost effective to build a room addition onto the side of your home than to build a second story addition on top of it. With any home addition, it is a major construction project. As a matter of fact, it really is like building a small new home.
Building a second floor addition only adds to the complexity, risks, inconveniences and cost. For example, the existing home needs to have its roof removed and effectively a new home built on top of the original one.
Moreover, a second floor addition pretty much guarantees the family has to move out of the home for a period of it. In addition, building a second floor addition is fraught with additional risks and concerns associated with weather and ensuring the main level of the home is not damaged during the second floor construction. For example, ensuring the drywall ceiling on the first floor does not suffer extensive damage and/or cracks is extremely difficult to do when building a second floor addition above it.
Key Factors to Consider when Building a Second Floor Addition
Make sure to check with your local building inspector before thinking too long on building a second floor addition. There may be building code, zoning, or covenant concerns.
In addition, the building inspector will be able to tell you if your existing home will be able to support a second floor. Or more likely, what additionally youll need to do to the first floor to shore up its ability to support the weight of a second floor addition.
There is also the possibility that the homes foundation walls and concrete footings may not be adequate to support the weigh of a second floor addition. For example, if you have a small ranch style home built on a foundation wall, the concrete footings that support the foundation walls may not be sized large enough to support the weight of a second floor. If this was the case, and you went ahead and built a second story addition on top of the ranch, there is the possibility that the house could settle significantly and make the home become structurally unsound.
As a result, if you have a similar type home and are contemplating building a second story addition, you may need to work with the building inspector and a foundation contractor. They can help determine how to beef up your homes foundation walls and concrete footings in order to be able to legally build the second story addition.
Building a second story addition also means having to remove the homes existing roof. This means your home, and its contents, will be at risk of being damaged by water and weather related issues.
Great care will need to be given to prevent your homes lower level from being damaged by the weather elements.
Its also important to keep in mind that removing a roof in a careful way, as to not damage the lower level rooms of the house, is an expensive endeavor and thus will add quite a bit of expense to the cost of the construction project.
Building a second story addition also pretty much guarantees having to move the family out of the home for a period of time. This means that youll have to find temporary housing which adds cost to the project.
Key Factors to Consider when Building a Bump-Out Room Addition
One of the chief benefits of building a room addition onto the side or back of your home is that the work is isolated from the main part of the home for much of the construction. Only when the room addition is nearly done, does a doorway or opening have to be punched into the main home. As a result, building a room addition is much less disruptive to the family.
Although building a room addition requires its own concrete footings and foundation walls, it is a clean effort. There is no disruption to the existing home. The excavation is done, the concrete forms are erected, and the concrete is poured. When complete, the framing can be constructed on top of the new foundation walls.
Lastly, because there is little demolition required in building an attached room addition, there are minimal additional costs to tie it in to the existing home. Typically only a little house siding and roofing work has to be done to tie the new attached room addition into the existing home.
To conclude, building a second story addition has its benefits. It doesnt require expanding the footprint of the home, and it can effectively double the finished living space of the existing home. However, building a second story addition, compared to building an attached room addition, is a much more expensive, riskier, and disruptive enterprise. So, before choosing to build a second floor addition, make sure you know what you are getting yourself into, and if at all possible, consider going the route of the attached room addition.
For more help on building a second floor addition or room addition, see HomeAdditionPlus.com'sHome Addition Bid Sheets. TheHome Addition Bid Sheets will help ensure that your home building project goes smoothly and is completed on time and budget.
Additional Home Building and Room Addition Construction Resources
Fill out our 3-5 minute quick and easy form, and receive a free price quote on building a second floor addition from one of our prescreened and licensed home addition contractors. This process is free and there is no obligation to continue once you receive your home addition price estimate.
Here is the original post:
Building Second Floor Addition | Room Addition
-
February 10, 2016 by
Mr HomeBuilder
real estate
Highlights
Real Estate Step Wisely When You Add A 2nd Story
If your house is too small for your needs, you have two choices: move to a larger home, or add a second story.
Neither option is stress-free. Given today's depreciated home values, many owners might prefer to add a second story instead of moving.
Adding a second story isn't that different from building a new house, at least from the builder's perspective, according to Gary Henley, president of Henley Homes, a home remodeling company in Liberty Hill, Texas. New construction is simply placed over the existing footprint, he explains.
Adding a second story raises issues of structural soundness, building codes, stairway access and occupancy during construction.
The first step should be to consult a structural engineer to make sure the foundation will support the added weight of the new walls and living spaces between them, says Robert Criner, president of Criner Remodeling, a home remodeling company in Newport News, Va.
"A lot of people think that because they have an attic, they can just floor that in and move on up. They can't. Attics are designed to carry less weight than a bedroom," Criner says.
Building code requirements -- such as minimum room sizes, minimum ceiling heights and staircase dimensions -- must be taken into consideration. Some states impose the same rules in every community. Others allow localities to adopt their own rules.
"You could drive five miles and there is a different code, and in another five miles, it's another code," Criner says.
Homeowners should hire a contractor who's familiar with the codes where the home is located. The contractor should be licensed in that jurisdiction.
A second story almost always requires a new staircase, either because one doesn't exist or the existing stairs aren't code-compliant or sturdy enough.
"You want to have a good, permanent staircase," Criner says, "Just because you have a staircase that goes to the attic doesn't mean it qualifies as a staircase to go to a second floor."
The staircase can be positioned inside or outside the existing ground floor. Fitting it inside means other space, such as a bedroom, hallway or breakfast area, must be sacrificed. Adding it outside requires room on the lot and removal of whatever currently occupies that space, be it a walkway, landscaping or other structure. Either way, carving up space to accommodate the stairway can be a challenge, Henley says.
Listen to audio
The second story, back story.
If you are really thinking about raising the roof on your house, or adding a second story, you have a number of key issues to consider. For some it is an attractive option though, particularly if prevented from moving because of lower property values.
Assuming you can afford the expense of the expansion, the first step is to check with a structural engineer to see if your foundation can support the added weight.
And youll need to take into consideration local building code requirements, possibly including minimum room sizes, ceiling heights and staircase dimensions.
Will you remain in the home while second story construction is going on? It might not even be possible if power, water and gas need to be shut off for the job.
Also, opening the structure to the elements can present a risk to your furnishings. Some homeowners choose to empty out the ground floor while the job is going on.
Space also must be found for new ductwork for the heating, ventilation and air-conditioning system. Some homeowners want a separate system for the second story; others prefer one whole-house system. Either option requires planning before construction begins.
Some homeowners want to stay in their home while the second-story construction is going on. Henley says that's not an easy lifestyle, perhaps all but impossible.
"I honestly don't know how they've come close to doing that because by the time you turn off the power, water and gas, how could they live comfortably?"
There's a concern about the effects of rain, snow or wind after the house has been opened to the elements, says Jim Bateman, owner of Bateman Custom Construction, a home remodeling company in Fairfax, Va.
Emptying out the ground floor can reduce the risk of rain or wind damage. If the homeowner hasn't yet moved into the residence, that might not be difficult to do. If the house is occupied, furnishings can be packed into sections of the house that won't be exposed, relocated to another residence, or stored at an off-site facility or in temporary containers on the property, Bateman suggests.
The job's duration depends on the size and configuration of the house and second story, and whether portions of the new space are pre-built.
"If the homeowner is amenable to modular construction, we can bring the second floor in as a modular and that would be much faster," Bateman says. "The roof can already be attached to it, and it just has to be lifted up into place."
Adding on a second story isn't cheap. Builders say the cost of a project depends on the scope and scale, quality of materials and finishes the homeowner selects, labor costs, and myriad other factors.
See the rest here:
Step Wisely When You Add A 2nd Story | Bankrate.com
-
February 10, 2016 by
Mr HomeBuilder
Home > Home Improvement > Home Builder & Contractor > Cost of Building a Second Story Addition
Author: Brian Eckert
Adding a second story to a one-story house is no small job. Depending on the size of your house the cost to build could be as little as $80,000 to as much as $3-400,000 and beyond. It is, however, a great way to add value to your home, and most times it will be cheaper than buying a house with a second floor. This is also a great time to remodel your existing house as your new stairway must be planned out and it could give you some ideas as to a new layout.
The cost to build a whole new floor of home space is never cheap. Talk to local contractors who have done this sort of project before. Be prepared to spend at least $150 per square foot and as much as $300 per square foot of new space. There are always problems encountered when undertaking a project this big so you should assume that the total cost of the job may increase as much as 20% by the time its done. Unforeseen problems could include a foundation or exterior walls that cannot support the extra weight. There may be some issues in tying in your new plumbing to your existing, or you may have to install a new power panel to support the added strain. The best way to avoid these extra costs is to have a detailed building plan and a thorough inspection of all possible issues and solutions to them.
The first step you should always take before any remodeling job is to make sure that you are zoned properly for your project. Most cities and towns have restrictions on how tall a building can be, how close to a public road a building can be, etc.
Attention to detail is a key aspect of any remodeling project. This is never truer than in the case of the house plan. A great set of architectural drawings could save you thousands of dollars on the cost of an addition.
An open line of communication with your contractor is a must. There should be no misunderstanding of the bid and the scope of work involved. If you have any questions or concerns, the earlier you resolve them the better.
As always, do your homework when selecting a contractor. Make sure he has solid, recent references and pictures of his work. Never settle for the first contractor you talk to just because you like his price. More often than not, the cheapest price is cheap for a reason. The contractor might not have given the job a thorough inspection, or he might not fully understand the scope of your project. The more quotes you get, the more likely your job will be done at the highest quality for the lowest possible price.
Original post:
How Much Does a Second Story Addition Cost? - CostOwl.com
-
February 10, 2016 by
Mr HomeBuilder
Before construction photo. Photos (1-11) follow in sequence.
February 2, 08 - 10:00 am Roof structure 50 % removed including old rear bathroom dormer.
February 2, 08 - 12:00noon, Roof & gable walls completly removed. Missing floor framing & plywood flooring installed.
Feburary 2, 08 - End of day, all exterior walls pre-build, resting on floor & house completly covered with a 40' x 60' tarp.
February 3, 08 - 9:00 am Exterior walls 1/3 erected. Each section labled to indicate location.
February 3, 08 - 11:00am All exterior walls erected, plum and braced.
February 3, 08 - 2:30 pm Roof trusses 100 % erected, including gable ends
February 3, 08 - End of day, roof completly plywood and eventualty covered with tarp.
February 4, 08 - 12:00 noon Roof completly shingled and all windows installed. New second story addition completly water tight with wrap.
February 4, 08 - End of day, interior partitions erected, plum and braced. Plumber & Electrician started rough work in couple days.
After Construction
Entire house & garage vinyl sided. 2nd story window over entrance door & shutters added for more curb appeal. Single window (left of entrance door) converted into double window.
Photos below ( 1-29)
Presently a 1st floor family room addition attached to colonial house.
Creating a 2nd story master bedroom .Original bedroomfloor space was remodeled into 2 walk-in closets, master bathroom and office room.
Addition designed and constructed as though it was original structure.
Creating additional living space in a un-finished attic.
Newly created 3rd level during framing stage.
Created 2 large bedrooms and bathroom with plenty of storage space.
Turn cape into a two story home addition (colonial). Created 3 bedrooms & bath. Created vestibule. Extend chimney.Following year, remove 1st floor center bearing wall and convert original 2 bedrooms into 1 large family room.
Turn cape into a second story home addition (colonial). Created master bedroom with master bathroom and walk in closet. Also 2 additional bedrooms with full bathroom and laundry room off hallway.
Built second story room addition over existing 1st floor family room. Create master bedroom, master bathroom, walk in closet and office. Match existing hip style roof & overhangs. Extend chimney.
Convert ranch into a second story home addition. Created 3 Bedrooms& 1 bath .Created staircase to upstairs. Install new structural floor system. Raise chimney.
Build second story home addition over existing garage. Created full bathroom, office & game room. New staircase & structural floor system. Structural full span beam in garage .
Existing colonial, created master bedroom addition, master bathroomand walk in closet over room below. (1 of 2)
Rear view of room addition Match roof lines. (2 of 2)
Convert cape into a second story home addition (colonial). Created 3 bedrooms and full bath over Main House and master bedroom / bathroom / walk-in closet and office over garage.
Created 2 bedrooms in un-finished attic area. Plus, strip old roof shingles on remaining house and install new architectual shingles and raise chimney.
Rear Dormer to existing cape. Consist of bedroom, full bath, sitting room. Rear deck with stairs to grade.
Turn ranch into split level ranch. (right gableview). (1 of 2) - Not required to raise entire lenght of a Ranch House if additional rooms are not needed orbeyond budget.
Convert ranch into split level ranch. (leftgable view). (2 of 2) - Newly created stairs required to new 2nd level. 2nd floor windows mimick windows below. (see front & gable walls)
Convert 1 story house into a two story house. . - Newly created stairs required to new 2nd level. Raise chimney . Created new structual floor system.
2 Front Dormers. - These type of dormers are called "Dog House ". Purposefor additional light, ventilationand floor space.
Add a full rear dormer to a cape. Also created a full lenght rear deck and stairs to grade.
Convert ranch into split level ranch. - 2nd level Hip styleroof matchesremainingstyle of house. Extend chimney, new structually floor and set of stairs to new 2nd level
Created 2nd level home addition.(1 of 2). Front View
Large sliding windows and sliding door facing ocean. Created private 2nd level deck with glass railing for non-obstructive views.
Created 2nd level home addition (2 of 2) Side View.
Convert Ranch to Colonial(right gable view) (1 of 2).
Since a structuarlly floor is required, take advantage by cantilevering new floor joist 2' 0" beyond 1st floor foot print for additional floor space.Also,option of expanding both in front and back as this house was done.
Convert Ranch to Colonial (left gable view) (2 of 2).
Continuing 2nd level over existing garage is an option if additional rooms ( bedrooms, bathrooms, laundry room, den, office, etc) were needed.
Originally a 1 story, brick, ranch home with hip-style roof.Homeownerneeded 2 additional bedrooms & 1 bathroom. Have to create a set of stairs to proposed 2nd level, usuallyfrom 1st floor living room and usually directlyabove existing set of stairs leading to basement.
Constructed a steep front roof, consistent with a cape style home and built a full-lenght rear dormer. This conversion(ranch to cape)opposed to standard conversion(ranch to colonial)is less expensive if you need only 2 bedrooms. If you need 3 or 4 bedrooms with both a hallway & master bathroom, you need to convert to a colonial style home.
New bedrooms, eachwith a gable & rear window and bathroom located in center (off hallway) . As you notice, existing ground level family room addition & 2 car garage (see photo 2 of 3) limits property space for any possibility of a ground level bedroom addition.
Photos below (1-23)
Rear addition. Family room, office and rear foyer with closet. Rear deck with full basement. Also, vinyl siding new addition and entire house.
Family room addition, hip roof with front gable. Clap board exterior with special "SUN BURST " gable .
2 Story Addition, plus 1 story addition with roof deck
Family room rear home addition on piers.
3 Season room addition
Match existing siding . Porch constructed on piers, bottom enclosed with vinyl lattice and "TREK" decking boards.
Rear room addition on piers.
Created bedroom addition. Pressure treated plywood installed under floor joist. Floor well insulated.
2 Story rear Addition to existing Cape House,thus2nd floor concept.
!st floor is an extension of kitchen and new family room. 2nd floor is master bathroom with master bedroom and private balcony.
Room addition builtoff existing gable end of Ranch house.
Matched same roof lines and flush with front exterior wall. Home addition consisting of a master bedroom & bathroom.
Garage addition . (1 of 4)
Originally was a 2 car garage. Created another bay (far right) and converted into a 3 car garage. Up graded with overhead garage doors, siding, roofing and electrical fixtures.
Created new 2nd level Addition on Main House. (2 of 4)
The rest is here:
Dormer Window Installation CT Connecticut Dormer Window ...
-
February 10, 2016 by
Mr HomeBuilder
by Jane Meggitt, Demand Media
Up or out? That is the question. You need space and you want the most for your money. Your home site might make the decision for you. If you don't have much of a yard to the sides of your home or behind it, up might be the only way to go. Local zoning laws also come into play. The cheapest solution depends on various factors, as each situation is different.
If you've got the yard space for it, ground floor additions are generally easier. There's far less disruption of your house than when adding a second story. Depending on the configuration of your house, an addition might be built off an existing doorway, lessening the expense of taking down walls. You might also save on architectural design costs that would be required for building up. If you have to move power lines or work around sewer lines, that can add to the expense.
Adding a second story means there's already a foundation in place. You must make sure the existing foundation and the footings are strong enough to carry a second story. If your building inspector finds the foundation can handle it, this can be a cheaper way to go. If you need to reinforce the walls or foundation, building an addition is likely less expensive. Going up rather than out can save money for heating and cooling ducts, pipes and other necessary materials. Up rather than out tends to be a shorter route for ducts or piping, although it all depends on the home's construction. However, the more involved work of building up means higher labor costs.
It's more than just construction costs that you must take into consideration. If you decide to go with a second story, the roof will have to come off and you'll probably need to find temporary living quarters. It's one thing to stay with friends or relatives and another to add days or weeks of hotel bills and meals to your budget. There's also a greater risk of damage to the rest of the house, such as the ceilings and floors on the ground floor.
Don't forget that besides up and out there is also down. Finishing a basement might be the most cost-efficient way to increase living space, much cheaper than either building up or out. If you have an attached garage, putting a room or two over it might be a possibility, if the foundation and bearing walls can hold a second story. You would have to work with an architect to make this arrangement aesthetically pleasing, but it doesn't involve the disruption and relocation found in a complete second-story addition.
Jane Meggitt has been a writer for more than 20 years. In addition to reporting for a major newspaper chain, she has been published in "Horse News," "Suburban Classic," "Hoof Beats," "Equine Journal" and other publications. She has a Bachelor of Arts in English from New York University and an Associate of Arts from the American Academy of Dramatics Arts, New York City.
Go here to see the original:
What Is Cheaper Adding a Second Story Addition or a Ground ...
Category
Second Story Additions | Comments Off on What Is Cheaper Adding a Second Story Addition or a Ground …
-
February 10, 2016 by
Mr HomeBuilder
Proud Members of the
Master Builders Association of NSW since 1968
Beecroft job (BEFORE PIC)
Glossodia job
Before photo
Glossadia job
After Photo
Winners of the MBA (Master Builders Association of NSW) Housing Award for 2011
- Home Extension/Alteration/Renovation (Category $150,000 to $250,000)
The biggest growth area in our projects is now undoubtedlysecond storey additions. With good economical vacant land limited in the Sydney area many people are now opting for a second storey addition in lieu of building a new home.
2nd storey additions are also called first floor additions, attic conversions, Cape Codextensionsor top floor additions. They are all the same thing but they can be standard construction with frames and trusses or can be complex pitched roofs with dormer windows.
Previously owners risked over capitalising but now in many cases a 2nd storey addition can greatly increase the value of the home and be a good investment as well as adding more space.
First flooradditions are much less disruptive to home owners than standard additions as work is completed above the existing home rather than in the owners yard. We do NOT require owners to leave their home while construction takes place. Our workers will enter the house via a window to the 2nd storey, not through the front door. Only after internal linings will the staircase opening be opened up to the ground floor, minimising any disruption to the owners
Carlingford job
Before photo
First floor addition in Carlingford
Mosman job
Before photo
Mosman luxury renovation
There are a few items that require special attention for 2nd storey additions. They include:
2nd storey additions require good organisation and access to a large carpentry team to ensure the waterproof stage is reached quickly, minimising the chance of leaks. 2nd storey additions are therefore not usually suitable to owner builders or smaller on-site working builder companies.
For second storey additions to work well the builder needs very detailed planning, a dedicated hard working team of carpenters, attention to detail and above all patience. If the weather looks bad the project needs to be delayed at the appropriate time to minimise any leaks. OMara is very experienced at the process of second storey additions.
After signing building contracts we will not commence work on-site for a couple of weeks until a large amount of materials have been delivered to site so that no delays occur waiting for materials. We usually start work on a Monday and the process will involve the following steps;
1.Delivery of materials 2.Relocation of aerial power service (if required) 3.Strip roof tiles / roof and dispose or store on site for reuse 4.Cut back roof timbers 5.Pack up wall frames and install floor joists 6.Install internal drainage for first floor bathrooms 7.Install new air-conditioning ducting as required
8.Install new sheet flooring 9.Install plastic membrane and specialised waterproof tarp 10.Crane up, stand frames & trusses using special fixing methodsfor 2nd storey additions to minimise leaks during rain 11.Install fascia & gutter 12.Install roof tiles 13.Fit windows & sark walls if necessary
At this stage the house is now waterproof and the chance of any leaks to the ground floor is greatly reduced. Only very minor leaks should now occur. We usually reach this waterproof stage with 10 to 15 working days. If the project includes pitched rafters rather than trusses or metal roofing it may take longer to reach this stage. Extremely large additions can also take a bit longer but this time frame usually allows for a 2nd storey addition of around 12m x 8m, a typical size.
O'Mara constructions has completed a number of first flooradditions using standard construction and alternate building materials. Photographs and references can be supplied upon request.
Please contact our office for details.
St Ives internal fireplace
St Ives Kitchen / Dining
Beverly Hills project (BEFORE PHOTO)
Beverly Hills Project nearing completion November 2012
In some instances "Posi-strut" open web floor joists are used which allows for services such as air-conditioning ducting. In other circumstances Hyspan or Hynebeam joists (which are laminated timber joists) are a better option. Sometimes it is better to raise the height of the area between the existing ceiling and the new floor joists. Each project requires careful consideration in the planning stage of which is the most suitable method.
Owners need to select bathroom fittings such as bath tubs, toilet suites and vanity units prior to construction commencement so that the appropriate allowances can be made at the floor joist framing stage. OMara has a special method of construction that is more flexible and allows for future changes but it is still critical that these selections are made at an early stage.
Our experience is that quiet often the existing ceiling space can be very dirty. It can contain old dusty insulation, spray-in type insulation, rat vermin, dead birds, birds nests and many other horrible things. We recommend that all owners considering completing a second storey addition that they employ the builder to clean-up the ceiling space. Upon request we can vacuum out completely the existing ceiling, remove all old duct ridden insulation, install new clean insulation andinstall downlight protectors (which is one of the biggest causes of house fires) prior to installation of the new sheet flooring, This is the only opportunity the owners will have to clean-up this area as it will then be sealed forever after installation of the new floor.
CONSTRUCTION COST
The exact cost of a second storey addition depends on the size of the addition and the amount of work required to the existing house. Some clients choose to remove ground floor internal walls to create more open space, cement render or paint the existing house, renovate bathrooms or kitchens and alike. However our most typical first floor addition consists of a new master bedroom, walk-in-robe, ensuite,two other new bedrooms and a small sitting room. Extensions of this size are usually around 12x8m in size. Typically these size extensions costs around $165,000 + GST for the first floor addition work. This equates to a square metre rate of $1,650/m2. Although square metre rates can very inaccurate in some cases it can give owners a rough idea of construction costs. The cost for the ground floor work would need to be added to this budget cost. This would include items such as rendering the ground floor brickwork, removing existing house internal walls, re-tiling the existing roof, renovating existing bathrooms or kitchens.
To confirm this budget price owners need to first have a "draft concept" plan prepared. This plan consists of a floor plan of the extension drawn to scale with a few basic dimensions, 1 or 2 elevations and a site plan. From this draft plan we can price the construction cost exactly, price alternatives in design and inclusions and obtain verbal council development approval. We can also submit a separate price to arrange all the professional designs required to obtain council development approval. We usually recommend that the owners obtain this "concept plan" directly. This way the owners retain full rights of the design of the addition. If the builder prepares the plans the he usually owns the rights to the plans and only he can build the job and the owner cannot check his price if fair and reasonable.
The rest is here:
builder of second storey extensions in Sydney
-
February 10, 2016 by
Mr HomeBuilder
This Craftsman Style second story addition over the garage to this old-town Craftsman style Bend home provided the owners with a spacious master suite that includes a 2nd story deck. Master suite includes tiled bath and a gas fireplace.
Cascade Property Development is a very professional company with timeand respect in mind! We worked with Tom Pryor on an addition to our home and I would definitely recommend him to others. His quote forthe whole job was very accurate and he got the job done in anextremely timely manor. Tom was on the job site weekly, if notdaily, and always explained with emails or phone calls any additionalinformation and or changes/upgrades. Tom and the crews he hired were reliable and respective of our space (considering we lived in it atthe time). We would feel comfortable recommending Tom to people withremodels or upgrade needs for their home. Thanks for the timelycompletion of the job and for allowing our home to grow and accommodate a new family member!
The Totland Family
Continued here:
Craftsman Style Second Story Addition
-
February 10, 2016 by
Mr HomeBuilder
Welcome to AirCo
Welcome to AirCo! Weve been in the heating and air conditioning business since 1990, offering outstanding customer service and quality workmanship to all of our customers in the Fort Worth, Arlington & Flower Mound area.
We value our customers and we always treat them with respect, which is why we provide a 100% satisfaction guarantee on all of our work. But dont take our word for it: we proudly carry an A+ rating from the Better Business Bureau and weve received the Angies List Super Service Award 4 years in a row.
AirCo & Habitat for Humanity
AirCo is working on Friday the 17th and Tuesday the 21st installing heating and air conditioning systems in two new homes. AirCo is proud to support our local community!
Click here to listen to more of our podcasts!
Trust Our Experience
We are YOUR heating and air experts!
Over the last 20plus years, weve grown and expanded to employ over 90 highlytrained team members in our stateoftheart facility with administrative offices, a warehouse for accepting deliveries and storing replacement parts, and customer showroom. Despite how big weve become, we still maintain a family atmosphere and our commitment to customer satisfaction. Call us today whether you need any type of system installed or your home isnt comfortable for any reason. Remember, when youre hot or cold, think AirCo: we bring comfort home.
If youve lived in the Fort Worth, Arlington or Flower Mound area during the summer then you know how hot it can get. Your air conditioning system is a critical part of your home during the heat, and if you need any type of service for your air conditioning system, whether its the installation of a new system or repairs for your existing unit, our air conditioning technicians are ready to help. We offer comprehensive air conditioning service in Fort Worth, Arlington & Flower Mound for cooling equipment of all types. We also provide a huge range of warranties and guarantees for new installation projects, so contact us to learn more.
The Texas winters can be very severe and your heater needs to be able to kick on and keep your home nice and warm. AirCo is a proud provider of top quality heating system service in Fort Worth, Arlington & Flower Mound. Our heating technicians can handle any kind of heater repair, installation, or maintenance that you need. If you arent getting enough heat, or if your heating system has started to produce an annoying noise, dont hesitate to call us. Were available 24/7 for emergency heating system repair service in Fort Worth, Arlington or Flower Mound because we understand that your heater could break down in the middle of the night. We offer terrific warranties on the labor and parts that we use for repair work so call us to find out more.
Continue reading here:
Air Conditioning Arlington, TX & Euless, TX, AC Repair ...
-
February 10, 2016 by
Mr HomeBuilder
Cabinet Discounters Chantilly, Virginia
Visit Cabinet Discounters showroom, located in the heart of Chantilly, Virginia. Youll find a friendly, knowledgeable staff waiting to help you with your kitchen remodeling project. Want to revamp a different room in the house? No problem, we can help you with any project bathrooms, bars, studies and much more. Our Location 14501-F Lee-Jackson Hwy (Rt. 50 West of 28) Chantilly, VA 20151
Contact Us Phone: 703-650-0659 Fax: 703-803-7992
Cabinet Discounters was recommended by a close friend. We contacted and worked with Mary Banas at the Chantilly Cabinet Discounters Showroom. She was highly professional and creative in addressing and supporting our kitchen renovation. Our primary focus was increasing the functionality of our kitchen. Mary provided several ideas that we incorporated into the redesign that not only increased the functionality for a 2-cook/1-baker kitchen, but also expanded the accessibility and flow of dinner/party guests during social functions. The chefs and baker can now easily go about their business while still easily entertaining their guests simultaneously, because of Marys redesign ideas.We have improved functionality and also new enjoyment with our kitchen. Albert Chantilly, VA
Kitchen Remodeler in Chantilly Virginia on HouzzCabinet Discounters earned a Best of Houzz Service Award, rated at the highest level for client satisfaction by the Houzz community. Quality and craftsmanship are very important to us, but customer satisfaction is our top priority. You will find a helpful team of cabinet experts at our Chantilly showroom, ready to help you with your kitchen or bathroom remodel. Whether you are going to DIY, hiring a home improvement contractor or taking advantage of our remodeling services, we are here to help you.
One of the most popular kitchen cabinet manufacturers we showcase in our Chantilly showroom is Brighton. Brighton cabinets were part of The Green House, a featured exhibit in the National Building Museum in Washington, D.C. Brighton Cabinetry is a member of the Kitchen Cabinets Manufacturers Association and provides quality cabinets certified by KCMA testing.
This Northern Virginia kitchen remodeling project featured Cumberland style Brighton cabinetry in maple wood with a butterscotch stain.
See more pictures of kitchen remodeling projects in Northern Virginia, Washington DC and Maryland.
Cabinet Discounters started out as, and still is today, a family business. We opened our first showroom in Gaithersburg, Maryland in the 1980s. Three decades later, we have seven showrooms throughout the Washington DC metro area including two in Virginia: Chantilly and Springfield.
Read more here:
Kitchen Remodel Chantilly VA | Kitchen & Bathroom Cabinets
Category
Kitchen Remodeling | Comments Off on Kitchen Remodel Chantilly VA | Kitchen & Bathroom Cabinets
-
February 9, 2016 by
Mr HomeBuilder
Product Recycling Fund
The price of this item includes a contribution to a Product recycling fund to ensure that waste electrical and electronic equipment is collected and recycled in a responsible manner.
Custom-made or ready to take home
Tested to stand up to years of use, our kitchen countertops give you lots of choice of styles and materials. As well as the ready-made ones shown here, we have a made-to-order range too. These countertops will be perfectly fit to your kitchen and you can get a sink put in at the factory, too. Just ask at the store for more information.
KARLBY
countertop
KARLBY
countertop
KARLBY
countertop
KARLBY
countertop
HAMMARP
countertop
HAMMARP
countertop
HAMMARP
countertop
FIXA
diffusion barrier
EKBACKEN
countertop
EKBACKEN
countertop
EKBACKEN
countertop
FIXA
countertop support fixture
EKBACKEN
countertop, double-sided
EKBACKEN
countertop, double-sided
HLLESTAD
countertop, double-sided
BERGSTENA
countertop, double-sided
SLJAN
countertop
SLJAN
countertop
SLJAN
countertop
SLJAN
countertop
LILLTRSK
countertop
MLLEKULLA
countertop
CAPITA
bracket
/2pack
Unit price
KARLBY
countertop for kitchen island
Read more:
Kitchen Countertops - Laminate & Wood Countertops - IKEA
Category
Countertops | Comments Off on Kitchen Countertops – Laminate & Wood Countertops – IKEA
« old Postsnew Posts »