The Website is Down #4 Sales Demolition
By: Schwarzer Kanal
See the article here:
The Website is Down #4 Sales Demolition - Video
The Website is Down #4 Sales Demolition
By: Schwarzer Kanal
See the article here:
The Website is Down #4 Sales Demolition - Video
Workers have begun tearing down a closed steam heat plant on North Washington Avenue in Scranton that leaked fuel oil into the Lackawanna River in July.
Late last week, demolition started on the northeast wall of the facility owned by Dunmore businessmen Louis and Dominick DeNaples. They plan to tear down the entire complex, including the tank where the leak originated.
The plant once piped steam heat to most buildings in downtown Scranton. In 2006, the state Public Utility Commission allowed then-operator Community Central Energy Corp. to stop service and shut down after financial difficulties.
No one is sure how much No. 6 fuel oil leaked from the aboveground storage tank, puddled on-site, flowed into the sewers and eventually reached the Lackawanna River through its combined sewer overflow below the Poplar Street bridge.
About 71,000 gallons remained in the 508,000-gallon tank when a contractor drained it. State environmental regulators blamed a missing brass valve for the leak.
In November, the state Department of Environmental Protection announced it would fine the DeNaples brothers a civil penalty for using an improperly certified contractor to handle the tank and for storing contaminated soil in a partially uncovered pile.
DEP has not yet set the penalty amount because it let the owners extend the due date for a report on the sites environmental status from mid-January to the end of April, spokeswoman Colleen Connolly said.
The new deadline was necessary after a delay in obtaining equipment to remove the fuel tank, she said. The owners still must remove it and clean the contaminated soil.
Because it is more practical to remove the tank and complete the soil cleanup as part of the characterization process, the extension request was reasonable and approved, she said in an email.
The report will include an ecological receptor evaluation that will address the spills influence on the river, she said.
See more here:
Demolition begins on steam heat plant that caused oil spill
LAS VEGAS (FOX5) -
The elevator shaft of the Clarion Hotel and Casino that defiantly remained standing after an overnight implosion came down Tuesday afternoon.
A spokesperson for the Controlled Demolition Inc., which was contracted for the project, said there was a chance the stout elevator shaft might "stall" during the implosion.
The company said the shaft moved downward along with the rest of the structure during the implosion, but came to rest after "failing" the initial four stories. The shaft leaned against the debris.
A crane with cables attached to the shaft assisted in safely pulling down the remaining piece, CDI said.
About 1,100 pounds of explosives were used for the initial implosion. It took about 10 seconds to bring down most of the 12-story, 200-room hotel that has stood at 305 Convention Center Dr. for 45 years.
Originally slated for 2:30 a.m., the big bang was delayed for about a half-hour as police were called in to clear out five people who found themselves inside the blast zone. Eventually, a series of explosions leveled much of the building as onlookers packed nearby parking garages to witness the spectacle.
When the dust cleared, a tower of the building was left standing.
Crews will spend about a month cleaning up the rubble.
RELATED: See pics from implosion, Share your pics and videos of implosion
Follow this link:
Crane attempting to complete Clarion demolition
The demolition of a redundant 1950s silo at Shrewsbury's Flax Mill has been completed.
The south silo at the site in Ditherington has been razed to the ground. Work has now begun on the old office and stables buildings which are set to become a visitor centre run by the Friends of the Flaxmill Maltings.
Councillor Alan Mosley, chairman of the Friends said: We and the local community are delighted to see great progress on the site with the creation our own visitor centre, within the office and stables.
"There will be spaces for interpretation, learning, meetings and study alongside the enhanced public domain open space.
"Everyone has worked very hard to achieve this major step forward and we look to this phase one project serving as a catalyst for the regeneration of the wider site.
It was once the site of a busy working silo but today there is almost no evidence of the now fully demolished building.
English Heritage awarded the contract to demolish the south silo at the former Shrewsbury Flax Mill Maltings to Erith Contractors Ltd in September 2014 and work has been completed on schedule.
Prior to demolition the silo was shrouded with scaffolding and a protective sheeting to prevent debris from hitting the adjacent historic buildings.
Erith Contractors Ltd said they deconstructed the silo in small pieces, so that the historic main mill was not endangered. Specialist vibration monitoring equipment was installed on site to ensure the historic buildings were secure throughout.
Tim Johnston, project director, said: Wed like to thank everyone local to the mill for their patience as the silo was demolished.
See the article here:
Demolition of Shrewsbury Flax Mill silo complete
LAS VEGAS (FOX5) -
The elevator shaft of the Clarion Hotel and Casino that defiantly remained standing after an overnight implosion came down Tuesday afternoon.
A spokesperson for the Controlled Demolition Inc., which was contracted for the project, said there was a chance the stout elevator shaft might "stall" during the implosion.
The company said the shaft moved downward along with the rest of the structure during the implosion, but came to rest after "failing" the initial four stories. The shaft leaned against the debris.
A crane with cables attached to the shaft assisted in safely pulling down the remaining piece, CDI said.
About 1,100 pounds of explosives were used for the initial implosion. It took about 10 seconds to bring down most of the 12-story, 200-room hotel that has stood at 305 Convention Center Dr. for 45 years.
Originally slated for 2:30 a.m., the big bang was delayed for about a half-hour as police were called in to clear out five people who found themselves inside the blast zone. Eventually, a series of explosions leveled much of the building as onlookers packed nearby parking garages to witness the spectacle.
When the dust cleared, a tower of the building was left standing.
Crews will spend about a month cleaning up the rubble.
RELATED: See pics from implosion, Share your pics and videos of implosion
See the article here:
Most of aging Clarion demolished in overnight implosion
Las Vegas, NV (KTNV) --After more than 12 hours of demolition work, the Clarion Hotel and Casino is finally a pile of dust. But it didn't come down without a fight.
The elevator shaft remained standing until Tuesday afternoon, when demolition crews tore it down with cables and pulleys.
Click here to watch the full implosion
All morning, there were snaps and pops as crews put tension on that massive cable working to topple over the remaining eight stories of the elevator shaft. They finally succeeded without the help of a wrecking ball.
The elevator shaft of the Clarion defied more than 1,100 pounds of explosives placed strategically and 4,400 boreholes designed to make the building fall in on itself in a spectacular detonation.
When the rest of the building went down, the elevator shaft just didn't want to join. It took crews 12 hours to successfully dismantle the piece, wrapping caravels around it and pulling it over in two phases.
Click here to view photos of the implosion
A wrecking ball was on order in case the cable trick didn't work, but crews got lucky, making the project for the new site one step closer to realization
The next step is they're going to come knock down the two-story facade.
That project should take only about a day, then an estimated couple weeks to clear the lot. The hope is it will be clear and ready for building by the end of the month.
See original here:
Clarion hotel-casino demolition in Las Vegas complete
Sheila Tolerico
Sheila Tolerico holds a degree in fashion marketing and management. Tolerico has been studying holistic health and nutrition for four years, and is about to begin formal training in those fields. She is bilingual in English and Spanish, and has basic fluidity in Portuguese and Italian. Tolerico writes on eHow and for Textbroker.com, where she maintains a 4-star rating.
Corrugated metal ceilings are popping up across the country thanks to the growing popularity of green building and the interest in Latin American and Southwestern European cultures. In the U.S., they are installed for aesthetics, to achieve an Old World look from places that have used and still use corrugated metal roofs, to protect dwelling inhabitants from the elements, and on green building projects. It is an inexpensive, easy and effective style of roofing in many growing nations as well a developed nations. Installing corrugated metal roofing panels on the ceiling is a reminder of where we've been historically and where we are headed in the future.
Corrugated metal is a lightweight, tough, practical, weather-resistant material. It is used primarily for roofs and sides of buildings such as barns...
The ridge-and-furrow texture and burnished patina of corrugated barn-tin panels used frequently for barn siding and roofs can also enhance the decor...
Create an entire ceiling from panels of corrugated metal to dress up an otherwise drab space.
Rusty corrugated metal can give your ceiling true country flavor.
Draw attention upward by installing corrugated metal onto sloped ceilings. Sloped ceilings, especially in upstairs bedrooms, tend to make rooms feel small.
Install the sheets vertically from floor to ceiling, ... Corrugated sheet metal, a thin piece of metal with raised ridges that create...
How to Install Corrugated Metal Roofing on a Pitched Roof; How to Install Corrugated Steel Roofing Panels; ... How to Install Corrugated...
Read the rest here:
How to Install Corrugated Metal Roofing on Ceilings | eHow
Just out! Our new Acoustiblok App makes getting quotes for our soundproofing products quick, easy and accurate.
The App has a professional Real Time Analyzer and Sound Pressure Meter (RTS SPM) that allows you to obtain an acoustical analysis and pinpoint the noise frequencies you are trying to reduce. It automatically takes a sample of the audio and saves it which can be sent to one our consultants for expert analysis.
The App also will also create an estimate for our Block 16 and Block 32 sound isolation material, as well as our QuietFiber, sound absorbing material and Acoustiblok Wallcover, a post construction sound dampening product.
Just plug-in the dimensions of the room and select the product you want to treat the walls, floors or ceiling area with. Then you simply email your information right to us for a quote. Included are links to the installation video and applications page to make installation easy.
Available FREE on the App Store for iphone and ipad Users! https://itunes.apple.com/us/app/acoustiblok/id947627095?mt=8
Excerpt from:
New Easy-to-Use FREE App from Acoustiblok
A 40-foot tall reinforced, industrial-strength dome, new slab of concrete and extended tipping floor, are designed to accommodate commercial-grade dump trucks at San Juan Islands solid-waste facility.
image credit: Scott Rasmussen
The transformation of the San Juan Island solid-waste facility reached a new plateau with the recent installation of an industrial-strength dome, a new slab of concrete below and a buttress of sizable concrete blocks, eight on each side of the 40-foot-wide tipping floor, which serve to anchor it all together.
While the height of the dome, roughly 40-feet from floor to ceiling, may be an eye-opener in itself, its just part of the plan.
And, the upgrade underway is actually ahead of schedule, according to Troy Lautenbach, co-owner of Lautenbach Enterprises, the Skagit County-based garbage, recycling and demolition company that assumed control of the Sutton Road site in early June.
We have 18 months to make the improvements required under our contract and agreement with the county, Lautenbach said, Weve accomplished what weve done so far in seven months. It all goes with turning whats been a drop-box facility back into a transfer station.
Which is what the town of Friday Harbor, as well as many other large-scale local haulers of trash and debris, has been waiting for.
The town, owner of the 26-acre former landfill on Sutton Road, opted a number of years ago to send its trash-haul trucks to the mainland, initially to avoid escalating prices at the solid-waste facility, run at that time by the county, a routine that persisted after the site was converted into a drop-box-only operation due, in part, to lingering problems of tainted stormwater run-off and the absence of a cover over the tipping floor.
Administrator Duncan Wilson foresees more efficient, cost-effective use of-town personnel and utility equipment once state and local health inspectors give a final okay on Lautenbachs improvements, operational plan and then issue the permit to operate the site as a transfer station.
If all goes according to plan, Troy Lautenbach said that final okay should soon be in place.
See the original post:
Lofty dome signals pending return of 'transfer station' status
Carpet Cleaning (770) 285-7085 | Marietta, GA
Marietta Cleaning (770) 285-7085 http://www.mariettacleaning.com/ https://plus.google.com/+MariettaCleaning If you need end of tenancy, carpet or any other domestic and commercial cleaning...
By: Marietta Cleaning